LNM11-F71643
SÉCURITÉReceived 28 Oct 2026, 00:00 UTC
Warning text
Positions open on the mapGOLDEN GATE BRIDGE - SAN FRANCISCO BAY
General / Marine Construction (Excluding Bridges) / Dredging
Curtin Maritime (CMC) will conduct maintenance dredging within the existing U.S. Coast Guard entrance channel and dock at U.S. Coast Guard Station Yerba Buena Small Boat Dock from on or about October 28, 2026, through on or about November 11, 2026. Operations will be conducted Monday through Friday from 0700 to 1700. Dredging will begin in the entrance channel adjacent to the jetty, progress west, and then proceed inbound to the U.S. Coast Guard dock. Mechanical dredging will be performed by DB Ironbound, a 150-foot by 54-foot by 9-foot clamshell dredge, with material loaded into scows Arrow Point and Long Point, each with a 1,450-cubic-yard capacity, and transported to the Alcatraz Disposal Site, SF-11, at approximately 37-49.30N 122-24.67W, or the Montezuma Wetlands Restoration Project Dock at approximately 38-04.32N 121-51.57W. Support tugs Emma C, Seanna C, Navy Bean, and Gretchen C will be involved. Equipment will remain lit during hours of darkness. All manned equipment will monitor VHF-FM channels 13, 14, and 16. For more information, contact Project Manager Alexandro Rodriguez at (562) 241-2350. Mariners are urged to proceed with caution after passing arrangements have been made. All mariners are advised to transit the area with caution.
USCG Southwest District Local Notice to Mariners 44/2026
Location map
Open on the full mapKeywordsmarine construction