LAKE SALVADOR - BAYOU PEROT
General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes
Bayou Perot - GIWW - Rock Barge Loading and Fleeting Area --- --- A rock barge fleeting area and light-loading operation will take place inside the entrance of Bayou Perot near GIWW Mile 20.0, WHL. The fleet and light-loading operation will be set up on the south bank. On-scene vessels will include the M/V LIL AL CENAC and barges. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. VHF-FM Channels: 13 and 72, POC: (504) 628-0846
Valid 2026-08-11 to 2027-07-30.
USCG Heartland (Gulf) District Local Notice to Mariners 43/2026