GALVESTON BAY ENTRANCE CHANNEL - HOUSTON SHIP CHANNEL
General / Marine Construction (Excluding Bridges) / Dredging
Houston Ship Channel - Dredge Operation --- --- The Dredge MBI-10 will be conducting dredging operations along the Houston Ship Channel in the vicinity of the One OK MVP/Magellan Valero Terminal. Dredged material will be loaded into regulation hopper barges and transported to an unloader barge located at Adloy along the San Jacinto River. On-scene support vessels will include the T/Vs TOWNES JEFFERY, GRAND ANN and JACKSON FOSTER. The dredge requests 1-hour notice for vessels bound for or coming from Docks 1 and 3. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. VHF-FM Channels: 76 or 78, POC: (228) 760-0931
Valid 2026-09-14 to 2026-10-13.
USCG Heartland (Gulf) District Local Notice to Mariners 41/2026