GALVESTON BAY ENTRANCE CHANNEL - HOUSTON SHIP CHANNEL
General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes
Houston Ship Channel - Dock Construction --- To: January 2027 --- Dock construction is being conducted along the Houston Ship Channel at City Docks 20 and 21. Work will take place from shore and waterside with divers and crews working under the docks at various times. Mariners should transit the area with caution and at their slowest safe speed to minimize wake. POC: (832) 926-2215 or (346) 341-4518
Valid 2026-07-17 until further notice.
USCG Heartland (Gulf) District Local Notice to Mariners 43/2026