HomeMapSky mapAlpha
More
Account
Loading…
Language: English

US Coast Guard LNM - Southeast District (D7)

US289 in force85 archivedupdated 11 Nov 2026, 18:59 UTCpage 1 of 6

  • Show on map
    BISCAYNE BAY General / Bridges / Temp Deviation Location: 25-46.45N 080-12.08W Bridge Name: West Flagler Street Bridge The bridge shall open on the hour and half-hour from 6 a.m. to 10 a.m. on Saturday, November 21, 2026, and Sunday, November 22, 2026. Valid 2026-11-06 to 2026-11-23. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    BISCAYNE BAY General / Bridges Location: 25-46.38N 080-12.04W Bridge Name: Southwest 1st Street Bridge The bridge shall open on the hour and half-hour from 6 a.m. to 10 a.m. on Saturday, November 21, 2026, and Sunday, November 22, 2026. Valid 2026-11-06 to 2026-11-23. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    HALIFAX RIVER General / Bridges Location: 29-13.39N 081-01.06W Bridge Name: Main Street Bridge The bridge is undergoing deck repairs. The project is expected to be completed mid-January 2027. The repairs are east of the navigation channel and impacts to navigation are not expected. Mariners are advised to stay clear of repair work and transit the area with caution. Valid 2026-11-05 to 2027-01-16. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    LOXAHATCHEE RIVER General / Bridges Location: 26-56.83N 080-05.42W Bridge Name: Alternate A1A Highway Bridge Repairs to the existing fender system will begin November 9, 2026 through April 1, 2027. The contractor will have a work boat and barge in and around the navigation channel. The channel may be partially obstructed, however, approximately 25 feet of the channel will be available for the passage of marine traffic. Mariners are advised to transit the area with caution and stay clear of construction equipment. Valid 2026-11-05 to 2027-05-01. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    LAKE WORTH SOUTH General / Bridges / Temp Deviation Location: 26-26.38N 080-03.91W Bridge Name: Linton Boulevard Bridge The bridge will remain in the up/open position from 8:15 p.m. until 9 p.m. on Friday, December 11, 2026 to facilitate the Annual Boynton Beach Holiday Boat Parade. Valid 2026-11-04 to 2026-12-12. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    LAKE WORTH SOUTH General / Bridges Location: 26-27.70N 080-03.83W Bridge Name: East Atlantic Avenue Bridge The bridge will remain in the up/open position from 8 p.m. until 8:45 p.m. on Friday, December 11, 2026 to facilitate the Annual Boynton Beach Holiday Boat Parade. Valid 2026-11-04 to 2026-12-12. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    LAKE WORTH SOUTH General / Bridges / Temp Deviation Location: 26-28.44N 080-03.73W Bridge Name: George Bush Boulevard Bridge The bridge will remain in the up/open position from 7:45 p.m. until 8:30 p.m. on Friday, December 11, 2026 to facilitate the Annual Boynton Beach Holiday Boat Parade. Valid 2026-11-04 to 2026-12-12. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    LAKE WORTH SOUTH General / Bridges Location: 26-27.70N 080-03.83W Bridge Name: East Atlantic Avenue Bridge The bridge need not open to navigation including tugs with tows, from 6 p.m. to 6:30 p.m. on Saturday, December 12, 2026, to facilitate the City of Delray Beach’s Annual Holiday Parade. Public vessels of the United States and vessels in distress shall be passed at any time. Valid 2026-11-04 to 2026-12-13. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    HOLLYWOOD BEACH General / Bridges Location: 26-05.78N 080-10.17W Bridge Name: South Florida Rail Corridor (SFRC) Railroad Bridge The Florida Department of Transportation (FDOT) will be conducting maintenance construction on the SFRC (CSX) Railroad Bridge / South Fork New River, mile 2.82, Fort Lauderdale, FL. Operations are scheduled to occur from November 30, 2026, to December 10, 2026. Under this temporary deviation, the SFRC (CSX) Railroad Bridge need not open to navigation during the following dates and times: - From Noon on November 30, 2026, through 4 p.m. December 4, 2026 - From 4:30 p.m. on November 30, 2026, through 8 p.m. December 4, 2026 - From Noon on December 7, 2026, through 4 p.m. December 10, 2026 - From 4:30 p.m. on December 7, 2026, through 8 p.m. December 10, 2026 At all other times, the drawbridge will remain in the fully open position except when it closes to navigation for the passage of rail traffic. All mariners are advised to keep clear when possible and use caution when transiting the area. The U.S. Coast Guard may be contacted via VHF-FM channel 16 or at (786) 295-9051. For more information, contact Mr. Brian Reeves via email at [email protected] Valid 2026-11-30 to 2026-12-10. USCG Southeast District Local Notice to Mariners 45/2026
  • LNM07-435A02SÉCURITÉ
    Show on map
    HILLSBOROUGH CUT C CHANNEL - HILLSBOROUGH RIVER General / Marine Construction (Excluding Bridges) / Dredging Location: 27-56.10N 082-27.24W 27-55.96N 082-27.16W 27-55.95N 082-27.18W 27-56.09N 082-27.26W 27-56.10N 082-27.24W Bayside Dredging will be mobilizing dredge equipment beginning on or about November 9, 2026, at Harbour Island Marina, Tampa, Florida. Dredging is expected to begin on or about November 12, 2026, with an estimated completion date of February 1, 2027. Dredge BETTY JEAN will be monitoring VHF-FM channels 13 and 16. Operations will be conducted 5-6 days a week for 12 hours a day. Mariners are urged to use extreme caution in the area, transit at their slowest safe speed to minimize wake, and proceed with caution after passing arrangements have been made. Floating and submerged plastic and rubber pipeline associated with the hydraulic dredging operations will be utilized. Pipeline, work vessels, dredge barge, turbidity boom, pilings, and buoys will be visibly lighted and marked according to Coast Guard regulations and will be in the area until all work is complete and can change configuration daily. Vessels and/or equipment will be in multiple locations at the same time. Valid 2026-11-03 to 2027-05-02. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    CANAVERAL BARGE CANAL General / Bridges Location: 28-24.46N 080-42.36W Bridge Name: Christa McAuliffe Bridge The bridge will provide single-leaf only openings as follows: - From 9 a.m. on November 2, 2026, through 9 a.m. November 6, 2026 - From 9 a.m. on November 9, 2026, through 9 a.m. on November 13, 2026 - From 9 a.m. on November 16, 2026, through 9 a.m. on November 20, 2026 - From 9 a.m. on November 23, 2026, through 9 a.m. on November 27, 2026 During the dates and times above, the drawbridge will be unable to provide a full opening. At all other times the drawbridge will provide full openings. Valid 2026-11-02 to 2026-11-28. USCG Southeast District Local Notice to Mariners 45/2026
  • LNM07-A85C5ASÉCURITÉ
    Show on map
    DISTRICT 7, OCEANIC BOUNDARY TO EEZ - SECTOR CHARLESTON, EXCLUSIVE ECONOMIC ZONE (EEZ) General / Marine Construction (Excluding Bridges) / Survey Operations 31-58.781N / 075-50.933W 31-56.378N / 075-54.060W 31-45.775N / 076-07.841W 31-43.685N / 076-10.367W 31-37.162N / 076-18.244W 31-35.527N / 076-20.217W 31-34.880N / 076-21.886W MOBILE VIKING will be conducting deep-water bathymetric route survey. Operations comprise hull-mounted multibeam bathymetry only. No geotechnical sampling, ROV, or AUV work. Survey operations are confined to water depths greater than 1,000 m. Operations are expected to begin on or about October 23, 2026, with an estimated completion date of November 15, 2026 Operations will be conducted 24/7; Vessel restricted in ability to maneuver while on survey lines. Request 2 NM CPA. MOBILE VIKING will be monitoring VHF-FM channels 13 and 16. Valid 2026-10-29 to 2026-12-01. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    BAHIA DE SAN JUAN ATON / ATON Changes Location: 18-27.35N 066-06.46W Aid Name: Isla Grande Airport Regulatory Buoy H LLNR: 30823.7 Action: ESTABLISH Valid 2026-10-29 until further notice. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    HILLSBOROUGH RIVER General / Bridges Location: 27-57.01N 082-27.90W Bridge Name: Cass Street Bridge The bridge need not open to navigation from 3 p.m. to 9 p.m. Saturday, January 30, 2027 to facilitate the 2027 Gasparilla Pirate Fest. Valid 2026-10-29 to 2027-01-31. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    SECTOR KEY WEST, SUBMERGED LAND ACT (SLA) General / Bridges / Construction Location: 24-39.79N 081-24.16W Bridge Name: United States 1 Highway Bridge Repairs to the bridge structure will begin 11/03/2026 and end on or about 12/27/2027. Crews will perform substructure concrete repairs on bridge piles, bents, and beams, working near most of the piers. The operation will utilize two work boats and up to three 20' x 20' work floats. Navigation is not expected to be impacted. However, all in-water equipment will be lighted per Inland Navigation Rules, and mariners should transit the area with caution. Valid 2026-10-29 to 2027-12-27. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    BAHIA DE SAN JUAN ATON / ATON Changes Location: 18-27.33N 066-06.45W Aid Name: Isla Grande Airport Regulatory Buoy I LLNR: 30823.8 Action: ESTABLISH Valid 2026-10-29 until further notice. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    SECTOR KEY WEST, SUBMERGED LAND ACT (SLA) General / Bridges Location: 24-40.16N 081-22.38W Bridge Name: United States 1 Highway Bridge Repairs to the bridge structure will begin 11/03/2026 and end on or about 12/27/2027. Crews will perform substructure concrete repairs on bridge piles, bents, and beams, working near most of the piers. The operation will utilize two work boats and up to three 20' x 20' work floats. Navigation is not expected to be impacted. However, all in-water equipment will be lighted per Inland Navigation Rules, and mariners are advised to transit the area with caution. Valid 2026-10-29 to 2027-12-27. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    BAHIA DE SAN JUAN ATON / ATON Changes Location: 18-27.27N 066-06.41W Aid Name: Isla Grande Airport Regulatory Buoy C LLNR: 30823.2 Action: ESTABLISH Valid 2026-10-29 until further notice. USCG Southeast District Local Notice to Mariners 45/2026
  • LNM07-B99C44SÉCURITÉ
    Show on map
    SECTOR MIAMI, SUBMERGED LAND ACT (SLA) - FORT PIERCE INLET General / Marine Construction (Excluding Bridges) / Dredging Cavache, Inc. will perform hydraulic dredging operations involving the removal of approximately 69,500 cubic yards (CY) of accumulated sediment from the Impoundment Basin (Sand Trap) located on the north side of Fort Pierce Inlet. The dredged material will be hydraulically pumped and placed on the beach south of the South Inlet Jetty. A dredge discharge pipeline will be submerged beneath the inlet at an approximate elevation of -32.0 feet and will then rise over the South Inlet Jetty. Operations are expected to begin on or about November 1,2026, with an estimated completion date of January 31,2026. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after arrangements have been made. Dredge and support vessels will be monitoring VHF-FM channels 13 and 16. Valid 2026-10-29 to 2027-02-26. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    HILLSBOROUGH RIVER General / Bridges Location: 27-56.50N 082-27.51W Bridge Name: Platt Street Bridge The bridge need not open to navigation during the following dates and times: - Saturday, January 23, 2027, from 11:30 a.m. to 9 p.m. to facilitate Children’s Gasparilla Parade. - Friday, January 29, 2027 at 10 p.m. through 1:30 a.m. on Sunday, January 31, 2027 to facilitate Gasparilla Pirate Fest. - Saturday, February 20, 2027, from 2 a.m. until 1 p.m. to facilitate Gasparilla Distance Classic 5K/15K. - Sunday, February 21, 2027, from 2 a.m. until 1 p.m. to facilitate the Gasparilla Distance Classic Half Marathon and 8K. Public vessels of the United States and vessels in distress shall be passed at any time. Valid 2026-10-29 to 2027-02-22. USCG Southeast District Local Notice to Mariners 45/2026
  • LNM07-0BA241SÉCURITÉ
    Show on map
    DISTRICT 7, OCEANIC BOUNDARY TO EEZ - SECTOR CHARLESTON, EXCLUSIVE ECONOMIC ZONE (EEZ) General / Marine Construction (Excluding Bridges) / Survey Operations 31-34.880N / 076-21.886W 31-33.533N / 076-22.988W 31-21.585N / 076-32.757W 31-08.275N / 076-43.576W 30-59.038N / 076-51.047W 30-56.329N / 076-55.141W 30-50.774N / 077-12.841W 30-50.308N / W 077-14.313W 30-49.309N / 077-17.466W 30-47.143N / 077-24.300W 30-46.548N / 077-26.179W MOBILE VIKING will be conducting deep-water bathymetric route survey. Operations comprise hull-mounted multibeam bathymetry only. No geotechnical sampling, ROV, or AUV work. Survey operations are confined to water depths greater than 1,000 m. Operations are expected to begin on or about October 23, 2026, with an estimated completion date of November 15, 2026 Operations will be conducted 24/7; Vessel restricted in ability to maneuver while on survey lines. Request 2 NM CPA. MOBILE VIKING will be monitoring VHF-FM channels 13 and 16. Valid 2026-10-29 to 2026-12-01. USCG Southeast District Local Notice to Mariners 45/2026
  • LNM07-656763SÉCURITÉ
    Show on map
    DISTRICT 7, OCEANIC BOUNDARY TO EEZ - SECTOR CHARLESTON, EXCLUSIVE ECONOMIC ZONE (EEZ) General / Marine Construction (Excluding Bridges) / Survey Operations 32-10.465N / 076-56.568W 32-06.031N / 076-50.709W 32-04.745N / 076-49.011W 32-00.820N / 076-43.830W 31-50.231N / 076-29.933W 31-50.005N / 076-29.637W 31-49.272N / 076-28.677W 31-45.728N / 076-25.029W 31-41.592N / 076-22.841W 31-36.393N / 076-21.739W 31-34.880N / 076-21.886W MOBILE VIKING will be conducting deep-water bathymetric route survey. Operations comprise hull-mounted multibeam bathymetry only. No geotechnical sampling, ROV, or AUV work. Survey operations are confined to water depths greater than 1,000 m. Operations are expected to begin on or about October 23, 2026, with an estimated completion date of November 15, 2026 Operations will be conducted 24/7; Vessel restricted in ability to maneuver while on survey lines. Request 2 NM CPA. MOBILE VIKING will be monitoring VHF-FM channels 13 and 16. Valid 2026-10-29 to 2027-04-27. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    BAHIA DE SAN JUAN ATON / ATON Changes Location: 18-27.41N 066-06.45W Aid Name: Isla Grande Airport Regulatory Buoy D LLNR: 30823.3 Action: ESTABLISH Valid 2026-10-29 until further notice. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    BAHIA DE SAN JUAN ATON / ATON Changes Location: 18-27.41N 066-06.43W Aid Name: Isla Grande Airport Regulatory Buoy B LLNR: 30823.1 Action: ESTABLISH Valid 2026-10-29 until further notice. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    SECTOR KEY WEST, SUBMERGED LAND ACT (SLA) General / Bridges / Construction Location: 24-39.76N 081-27.94W Bridge Name: United States 1 Highway Bridge Repairs to the bridge structure will begin 11/03/2026 and end on or about 12/27/2027. Crews will perform substructure concrete repairs on bridge piles, bents, and beams, working near most of the piers. The operation will utilize two work boats and up to three 20' x 20' work floats. Navigation is not expected to be impacted. However, all in-water equipment will be lighted per Inland Navigation Rules, and mariners are advised to transit the area with caution. Valid 2026-10-29 to 2027-12-27. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    SECTOR MIAMI, TERRITORIAL SEA - SECTOR MIAMI, SUBMERGED LAND ACT (SLA) General / Naval Activity / Military Operations Location: 26-30.45N 078-57.96W 26-12.80N 078-58.37W 25-54.32N 080-04.68W 26-28.83N 080-02.07W 26-30.45N 078-57.96W The US Navy will be conducting underwater surveys onboard the HOS ROSEBUD from November 11, 2026 to December 2, 2026 in the area involving restrictions to maneuverability. HOS ROSEBUD will be monitoring VHF-FM channel 16. Valid 2026-10-29 to 2026-12-16. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    BAHIA DE SAN JUAN ATON / ATON Changes Location: 18-27.27N 066-06.44W Aid Name: Isla Grande Airport Regulatory Buoy E LLNR: 30823.4 Action: ESTABLISH Valid 2026-10-29 until further notice. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    BAHIA DE SAN JUAN ATON / ATON Changes Location: 18-27.28N 066-06.39W Aid Name: Isla Grande Airport Regulatory Buoy A LLNR: 30823 Action: ESTABLISH Valid 2026-10-29 until further notice. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    BAHIA DE SAN JUAN ATON / ATON Changes Location: 18-27.40N 066-06.46W Aid Name: Isla Grande Airport Regulatory Buoy F LLNR: 30823.5 Action: ESTABLISH Valid 2026-10-29 until further notice. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    HILLSBOROUGH RIVER General / Bridges Location: 27-56.61N 082-27.54W Bridge Name: Brorein Street Bridge The bridge need not open to navigation during the following dates and times: - Saturday, January 23, 2027, from 11:30 a.m. to 9 p.m. to facilitate Children’s Gasparilla Parade. - Friday, January 29, 2027 at 10 p.m. through 1:30 a.m. on Sunday, January 31, 2027 to facilitate Gasparilla Pirate Fest. - Saturday, February 20, 2027, from 2 a.m. until 1 p.m. to facilitate Gasparilla Distance Classic 5K/15K. - Sunday, February 21, 2027, from 2 a.m. until 1 p.m. to facilitate the Gasparilla Distance Classic Half Marathon and 8K. Public vessels of the United States and vessels in distress shall be passed at any time. Valid 2026-10-29 to 2027-02-22. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    BAHIA DE SAN JUAN ATON / ATON Changes Location: 18-27.30N 066-06.44W Aid Name: Isla Grande Airport Regulatory Buoy G LLNR: 30823.6 Action: ESTABLISH Valid 2026-10-29 until further notice. USCG Southeast District Local Notice to Mariners 45/2026
  • LNM07-0A4C61SÉCURITÉ
    Show on map
    SECTOR ST. PETERSBURG, TERRITORIAL SEA - SECTOR ST. PETERSBURG, SUBMERGED LAND ACT (SLA) General / Marine Construction (Excluding Bridges) / Dredging Sea Hawk Maritime will be conducting dredging for Big Hickory Island Beach Restoration project. Equipment mobilization will commence on or about October 30, 2026, dredging will commence on or about November 6, 2026, with an estimated project completion date of November 30, 2026. Operations will be conducted 24/7. Vessel CLEARWATER will be monitoring VHF-FM channels 13 and 16. Mariners are urged to use extreme caution in the area, transit at their slowest safe speed to minimize wake, and proceed with caution a Ler passing arrangements have been made. Floating and submerged plastic and steel pipeline associated with the hydraulic dredging operations of the channel will be utilized. Pipeline, work vessels, dredge barge, booster pump barge(s), crane barges, tug boats, and buoys will be visibly lighted and marked according to Coast Guard regulations and will be in the area until all work is complete and can change configuration daily. Vessels and/or equipment will be in multiple locations at the same time. Valid 2026-10-29 to 2026-12-18. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    CHARLESTON HARBOR - COOPER RIVER ATON / Advanced Notice of Change The U.S. Coast Guard has approved the following changes to the Aids to Navigation System in the Cooper River: Cooper River Range D Rear Light (LLNR 3045) will be permanently relocated to approximate position 32-56.45N 079-55.35W. Cooper River Range D/F Front Light (LLNR 3040) will have the flash characteristic changed from a Q W to a FL W 2.5s. The light will continue to be an all-around light. Due to the current location of Cooper River Range D Rear Light (LLNR 30465) being inaccessible for a Coast Guard asset to effectively repair the structure, it was determined by relocating the rear range approximately 400 feet further from its current location will offer a much improved range quality and allow CG personnel to service at any tidal state. Position 32-56.38N 079-55.48W USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    ST JOHNS RIVER General / Bridges Location: 30-19.38N 081-39.51W Bridge Name: Main Street Bridge The bridge need not open to navigation on Saturday, November 14, 2026, from 7:30 a.m. until 9 a.m. to facilitate K-9 for Warriors Tri-Bridge Challenge 5K. Public vessels of the United States and vessels in distress shall be passed at any time. Valid 2026-10-27 to 2026-11-15. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    SECTOR CHARLESTON, SUBMERGED LAND ACT (SLA) - ST SIMONS SOUND ATON / Advanced Notice of Change Location: 31-06.62N 081-27.99W Aid Name: Brunswick Point Cut Lighted Buoy 26 LLNR: 6220 Action: RELOCATE The U.S. Coast Guard has approved the following changes in the St. Simons Sound and Brunswick Point Cut Channels. The USACE will be creating a widener where these two channels intersect. In response to this project the U.S. Coast Guard will conduct the following changes to the aids to navigation constellation in this vicinity. St. Simons Sound LB 24 (LLNR 6215) will be relocated to approximate position 31-06.34N 081-26.81W. The flash characteristic will remain a Q R. Brunswick Point Cut LB 25 (LLNR 6217) will be established in approximate position 31-06.21N 081-27.08W. Lighted Buoy 25 will display a flash characteristic of a Q G. Brunswick Point Cut LB 26 (LLNR 6220) will be relocated to approximate position 31-06.37N 081-27.33W. The flash characteristic will be changed to a Fl R 2.5s. Brunswick Point Cut LB 26A (LLNR 6223) will be established in approximate position 31-06.62N 081-27.99W. Lighted Buoy 26A will display a flash characteristic of Fl R 4s. Valid 2026-10-26 to 2076-02-17. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    SECTOR CHARLESTON, SUBMERGED LAND ACT (SLA) - ST SIMONS SOUND ATON / Advanced Notice of Change Location: 31-06.30N 081-27.05W Aid Name: St Simons Sound Lighted Buoy 24 LLNR: 6215 Action: RELOCATE The U.S. Coast Guard has approved the following changes in the St. Simons Sound and Brunswick Point Cut Channels. The USACE will be creating a widener where these two channels intersect. In response to this project the U.S. Coast Guard will conduct the following changes to the aids to navigation constellation in this vicinity. St. Simons Sound LB 24 (LLNR 6215) will be relocated to approximate position 31-06.34N 081-26.81W. The flash characteristic will remain a Q R. Brunswick Point Cut LB 25 (LLNR 6217) will be established in approximate position 31-06.21N 081-27.08W. Lighted Buoy 25 will display a flash characteristic of a Q G. Brunswick Point Cut LB 26 (LLNR 6220) will be relocated to approximate position 31-06.37N 081-27.33W. The flash characteristic will be changed to a Fl R 2.5s. Brunswick Point Cut LB 26A (LLNR 6223) will be established in approximate position 31-06.62N 081-27.99W. Lighted Buoy 26A will display a flash characteristic of Fl R 4s. Valid 2026-10-26 to 2076-02-17. USCG Southeast District Local Notice to Mariners 45/2026
  • LNM07-F70BBFSÉCURITÉ
    Show on map
    BEAUFORT RIVER - BRICKYARD CREEK General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 32-27.96N 080-41.48W Russell Marine, LLC will be removing and rebuilding the MCAS Beaufort Refueling Pier. Operations will extend 160 feet into the water from the existing pier. Operations will be commencing in October of 2026 with an estimated completion date of February 2028, Monday –Friday 7 a.m. to 5:30 p.m. and Saturdays 7 a.m. to 5:30 p.m. as weather and schedule allow. Mariners are requested to transit at no wake and give the work area a wide berth. Equipment: 155 foot barges (one crane barge, one material barge); up to 300-ton crawler cranes, one barge-mounted and one on an engineered trestle. Demolition of the existing fueling pier in linear halves to keep the active fuel line in service, and demolition of the existing dolphin. Trestle installation into the waterway for crane placement and demolition. Pile driving and setting of precast concrete during new construction phases. - Hazards to Mariners: Turbidity curtain around the work area. Barges positioned at the head of the existing pier and secured to the creek bed with spuds. Trestle extending into the waterway parallel to the existing pier and future new pier. One 25' tug. Work skiffs (20'–30') remaining within the work area. Barges are marked with white McDermott solar lights visible 360°, lit sunset to sunrise. Valid 2026-10-26 to 2028-03-31. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    ST SIMONS SOUND - BRUNSWICK RIVER ATON / Advanced Notice of Change Location: 31-06.62N 081-27.99W Aid Name: Brunswick Point Cut Lighted Buoy 26A LLNR: Not Provided Action: ESTABLISH The U.S. Coast Guard has approved the following changes in the St. Simons Sound and Brunswick Point Cut Channels. The USACE will be creating a widener where these two channels intersect. In response to this project the U.S. Coast Guard will conduct the following changes to the aids to navigation constellation in this vicinity. St. Simons Sound LB 24 (LLNR 6215) will be relocated to approximate position 31-06.34N 081-26.81W. The flash characteristic will remain a Q R. Brunswick Point Cut LB 25 (LLNR 6217) will be established in approximate position 31-06.21N 081-27.08W. Lighted Buoy 25 will display a flash characteristic of a Q G. Brunswick Point Cut LB 26 (LLNR 6220) will be relocated to approximate position 31-06.37N 081-27.33W. The flash characteristic will be changed to a Fl R 2.5s. Brunswick Point Cut LB 26A (LLNR 6223) will be established in approximate position 31-06.62N 081-27.99W. Lighted Buoy 26A will display a flash characteristic of Fl R 4s. Valid 2026-10-26 to 2076-02-17. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    ST SIMONS SOUND - BRUNSWICK RIVER ATON / Advanced Notice of Change Location: 31-06.21N 081-27.08W Aid Name: Brunswick Point Cut Lighted Buoy 25 LLNR: Not Provided Action: ESTABLISH The U.S. Coast Guard has approved the following changes in the St. Simons Sound and Brunswick Point Cut Channels. The USACE will be creating a widener where these two channels intersect. In response to this project the U.S. Coast Guard will conduct the following changes to the aids to navigation constellation in this vicinity. St. Simons Sound LB 24 (LLNR 6215) will be relocated to approximate position 31-06.34N 081-26.81W. The flash characteristic will remain a Q R. Brunswick Point Cut LB 25 (LLNR 6217) will be established in approximate position 31-06.21N 081-27.08W. Lighted Buoy 25 will display a flash characteristic of a Q G. Brunswick Point Cut LB 26 (LLNR 6220) will be relocated to approximate position 31-06.37N 081-27.33W. The flash characteristic will be changed to a Fl R 2.5s. Brunswick Point Cut LB 26A (LLNR 6223) will be established in approximate position 31-06.62N 081-27.99W. Lighted Buoy 26A will display a flash characteristic of Fl R 4s. Valid 2026-10-26 to 2027-04-24. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    CHARLESTON HARBOR - COOPER RIVER ATON / Advanced Notice of Change Location: 32-56.42N 079-55.42W Aid Name: Cooper River Range D Rear Light LLNR: 3045 Action: RELOCATE The U.S. Coast Guard has approved the following changes to the Aids to Navigation System in the Cooper River: Cooper River Range D Rear Light (LLNR 3045) will be permanently relocated to approximate position 32-56.45N 079-55.35W. Cooper River Range D/F Front Light (LLNR 3040) will have the flash characteristic changed from a Q W to a FL W 2.5s. The light will continue to be an all-around light. Due to the current location of Cooper River Range D Rear Light (LLNR 30465) being inaccessible for a Coast Guard asset to effectively repair the structure, it was determined by relocating the rear range approximately 400 feet further from its current location will offer a much improved range quality and allow CG personnel to service at any tidal state. Valid 2026-10-26 to 2076-02-17. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    PARADISE BAY ESTATES CHANNEL - TAMPA BAY General / Hazards To Navigation / Hazards ID# 56839 Location: 27-37.65N 082-34.17W 27-36.45N 082-34.31W 27-35.62N 082-36.05W 27-37.63N 082-36.24W 27-37.65N 082-34.17W 3 metal barges 10 foot by 20 foot were last seen in this vicinity and could be adrift. Mariners are reminded to proceed with caution in this area and report any siting to USCG Sector St. Petersburg at 727-322-4180. Valid 2026-10-21 to 2027-04-19. USCG Southeast District Local Notice to Mariners 45/2026
  • LNM07-536B0FSÉCURITÉ
    Show on map
    SECTOR CHARLESTON, TERRITORIAL SEA - SECTOR CHARLESTON, SUBMERGED LAND ACT (SLA) General / Marine Construction (Excluding Bridges) / Dredging Location: 33-36.76N 078-57.85W 33-34.40N 078-57.20W 33-32.93N 078-54.91W 33-31.35N 078-56.33W 33-32.89N 078-58.62W 33-33.55N 078-59.35W 33-33.72N 079-00.62W 33-36.76N 078-57.85W 56785 Great Lakes Dredge & Dock Company, LLC (GLDD) has completed dredging activities for the next phase of FY24 Myrtle Beach Emergency Renourishment Project in Surfside and Garden City, SC. The dredges, submerged dredge pipelines (subline), booster pump and pump-out assemblies have been removed from the beach areas. Various sections of subline have been anchored off south of Little River Inlet. See attached drawing. The sections of subline will all be floated, rafted and towed off site by the end of September 2026. The pipeline is marked per U.S.C.G. regulations. Boaters should avoid these areas. Equipment: Tug Bayou Brave Tug Evergreen State Tug Cape Hatteras Derrick Barge 64 Anchor Barge Crew/Survey Vessel St Johns River & Miami River Trailing Suction Hopper Dredges Amelia Island Booster Platform Jack Locations: A. Submerged Dredge Pipe 3-1 Offshore – 33-35.95123N, 078-57.25453W; Inshore – 33-36.53762N, 078-58.03521W B. Submerged Dredge Pipe 3-2 Offshore – 33-34.51684N, 078-58.73770W; Inshore – 33-34.97945N, 078-59.50451W C. Submerged Dredge Pipe 3-3 Offshore – 33-33.55514N, 078-59.35334W; Inshore – 33-34.13119N, 079-00.28532W D. Borrow Area SW 33-32.88950N, 078-58.62019W SE 33-31.35121N, 078-56.33010W NE 33-32.93328N, 078-54.90790W NW 33-34.40101N, 078-57.20237W VHF-FM channels 13 and 16. Mariners are urged to use extreme caution in the area for dredging and placement operations, and to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. Valid 2026-10-21 to 2026-11-30. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    HATCHETT CREEK CHANNEL General / Bridges Location: 27-04.72N 082-25.82W Bridge Name: Circus Bridge The bridge need not open to navigation including tugs with tows, from 6:30 p.m. until 9 p.m. on Saturday, December 5, 2026, to facilitate the 2026 Venice Christmas Boat Parade. Public vessels of the United States and vessels in distress shall be passed at any time. Valid 2026-10-19 to 2026-12-06. USCG Southeast District Local Notice to Mariners 45/2026
  • LNM07-1EC7E8SÉCURITÉ
    Show on map
    SECTOR CHARLESTON, EXCLUSIVE ECONOMIC ZONE (EEZ) - SECTOR CHARLESTON, TERRITORIAL SEA General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 32-15.46N 080-22.44W The SC Department of Natural Resources (SCDNR) has the opportunity to deploy 20 concrete culverts at PA-38 Fripp Island Reef during the week of October 26, 2026 . Each Culvert is approximately 8ft by 1.5 ft and 1.5 feet tall. Valid 2026-10-19 to 2027-04-17. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    MATHENY CREEK General / Bridges / Temp Deviation Location: 27-18.16N 082-32.72W Bridge Name: Siesta Drive Bridge The Siesta Drive Bridge will operate as follows: - From Monday, October 26, 2026, through November 13, 2026, the bridge will operate as follows: o From 6 a.m. to 7 p.m. Monday through Friday, a single-leaf opening will be provided on the hour and half-hour. A full opening will be provided with a 4-hour advance notice. o At all other times, a full opening will be provided on the hour and half hour. A containment system will be installed on the underside of the drawbridge across the navigation channel. This will reduce the vertical clearance to 18 feet. Valid 2026-10-15 to 2026-11-14. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    HILLSBORO RIVER General / Bridges / Temp Deviation Location: 26-10.05N 080-06.25W Bridge Name: East Oakland Park Boulevard Bridge The bridge will remain in the up/open position to navigation on Saturday, December 12, 2026, from 7:30 p.m. until 9:30 p.m. to facilitate the Seminole Hard Rock Winterfest Boat Parade. Valid 2026-10-15 to 2026-12-13. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    MATHENY CREEK General / Bridges Location: 27-18.16N 082-32.72W Bridge Name: Siesta Drive Bridge The bridge rehabilitation is ongoing and expected to end late November 2026. Channel restrictions and single-leaf openings are expected throughout the project. The Coast Guard will provide advanced notice of any waterway restrictions. Mariners are advised to transit the area with caution. Valid 2026-10-15 to 2026-12-01. USCG Southeast District Local Notice to Mariners 45/2026
  • LNM07-BCBE62SÉCURITÉ
    Show on map
    ST MARYS RIVER General / Bridges Location: 30-44.66N 081-39.24W Bridge Name: Interstate 95 Northbound and Southbound Bridges Vector Construction, on behalf of the bridge owner, Florida Department of Transportation (FDOT) will be conducting maintenance repairs and concrete bridge work on the northbound route side of the I-95(SR9) Bridge over the St Mary’s River. The project is scheduled Monday through Friday from 7a.m. to 5:30 p.m., beginning on November 2, 2026, through January 22, 2027. No work will be done on the southbound route side of the bridge during these repairs. Barges, workboats, and in-water equipment will be operating in and around the navigational channel. The channel will remain accessible to vessel traffic. Mariners are advised to keep clear of the work area when possible and exercise caution when transiting the area. Valid 2026-10-15 to 2027-01-22. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    HILLSBORO RIVER General / Bridges Location: 26-11.39N 080-06.17W Bridge Name: East Commercial Boulevard Bridge The bridge will remain in the up/open position to navigation on Saturday, December 12, 2026, from 8 p.m. until 10 p.m. to facilitate the Seminole Hard Rock Winterfest Boat Parade. Valid 2026-10-15 to 2026-12-13. USCG Southeast District Local Notice to Mariners 45/2026
  • Show on map
    CALOOSAHATCHEE RIVER General / Bridges Location: 26-33.65N 081-55.68W Bridge Name: Cape Coral Bridges The Coast Guard has issued a public notice announcing a permit application from Lee County requesting approval of the location and plans for the reconstruction of the Cape Coral Parkway bridges at Cape Coral/Ft Myers, Lee County, Florida. Public Notice 7-26 provides details of the proposed bridge project and solicits comments concerning the project through November 16, 2026. The public notice is available at http://www.navcen.uscg.gov/?pageName=pnBridges&Active=1&region=7. Chart: US5FL3MM Okeechobee Waterway-Caloosahatchee River Valid 2026-10-15 to 2026-11-17. USCG Southeast District Local Notice to Mariners 45/2026
Beta look