LNM07-0A4C61
SÉCURITÉReceived: 29 Oct 2026, 00:00Updated: 4 Nov 2026, 18:18
Keywords
- Operationsdredging operations, marine construction
Message content
SECTOR ST. PETERSBURG, TERRITORIAL SEA - SECTOR ST. PETERSBURG, SUBMERGED LAND ACT (SLA)
General / Marine Construction (Excluding Bridges) / Dredging
Sea Hawk Maritime will be conducting dredging for Big Hickory Island Beach Restoration project. Equipment mobilization will commence on or about October 30, 2026, dredging will commence on or about November 6, 2026, with an estimated project completion date of November 30, 2026. Operations will be conducted 24/7. Vessel CLEARWATER will be monitoring VHF-FM channels 13 and 16. Mariners are urged to use extreme caution in the area, transit at their slowest safe speed to minimize wake, and proceed with caution a Ler passing arrangements have been made. Floating and submerged plastic and steel pipeline associated with the hydraulic dredging operations of the channel will be utilized. Pipeline, work vessels, dredge barge, booster pump barge(s), crane barges, tug boats, and buoys will be visibly lighted and marked according to Coast Guard regulations and will be in the area until all work is complete and can change configuration daily. Vessels and/or equipment will be in multiple locations at the same time.
Valid 2026-10-29 to 2026-12-18.
USCG Southeast District Local Notice to Mariners 44/2026