LOXAHATCHEE RIVER
General / Bridges
Location: 26-56.83N 080-05.42W Bridge Name: Alternate A1A Highway Bridge Repairs to the existing fender system will begin November 9, 2026 through April 1, 2027. The contractor will have a work boat and barge in and around the navigation channel. The channel may be partially obstructed, however, approximately 25 feet of the channel will be available for the passage of marine traffic. Mariners are advised to transit the area with caution and stay clear of construction equipment.
Valid 2026-11-05 to 2027-05-01.
USCG Southeast District Local Notice to Mariners 45/2026