HomeMapSky mapAlpha
More
Account
Loading…
Language: English

LNM07-B979D9

Received 28 Jul 2026, 00:00 UTCArchived 11 Nov 2026, 18:59 UTC

Warning text

Positions open on the map
NEW RIVER SOUND General / Bridges Location: 26-08.28N 080-06.51W Bridge Name: East Sunrise Boulevard Bridge The bridge will undergo a rehabilitation beginning 6/1/2026 and end on or around 9/2027. The contractor will be working 24 hours a day. There will be construction equipment around the southeast fender and bridge span. In-water equipment will be lighted in accordance with Inland Nav Rules. The channel will be partially obstructed and the drawbridge is authorized a temporary deviation to the operating schedule. The bridge is authorized a temporary deviation from drawbridge operations and it will operate as follows: - From 7 a.m. on September 28, 2026, through 9 p.m. on November 14, 2026, the drawbridge shall open on the hour and half-hour providing a single-leaf opening. A full opening will be provided on the hour and half-hour with a 2-hour advanced notice to the bridge tender. - From September 30, 2026, through November 14, 2026, navigation channel will be partially obstructed between the hours of 9 p.m. to 7 a.m. A full opening will not be provided during overnight hours. Vessels able to pass without an opening may do so at any time through the unobstructed side. Mariners are advised to transit the area with caution. Valid 2026-07-28 to 2027-09-30. USCG Southeast District Local Notice to Mariners 44/2026
Beta look