NEW RIVER SOUND
General / Bridges
Location: 26-08.28N 080-06.51W Bridge Name: East Sunrise Boulevard Bridge The bridge will undergo a rehabilitation beginning 6/1/2026 and end on or around 9/2027. There will be in-water construction equipment, which will be lighted in accordance with Inland Nav Rules. Future channel obstructions are expected and will be announced by the Coast Guard in advance. Mariners are advised to transit the are with caution.
Valid 2026-07-28 to 2027-09-30.
USCG Southeast District Local Notice to Mariners 39/2026