MATHENY CREEK
General / Bridges / Temp Deviation
Location: 27-18.16N 082-32.72W Bridge Name: Siesta Drive Bridge The Siesta Drive Bridge will operate as follows: - From 5 p.m. on Monday, October 19, 2026, through 12 p.m. on Friday, October 23, 2026, the bridge will provide a full opening daily between 12 p.m. and 5 p.m. on the hour and half-hour. At all other times, a single-leaf only opening will be provided on the hour and hour. - From Monday, October 26, 2026, through November 13, 2026, the bridge will operate as follows: o From 6 a.m. to 7 p.m. Monday through Friday, a single-leaf opening will be provided on the hour and half-hour. A full opening will be provided with a 4-hour advance notice. o At all other times, a full opening will be provided on the hour and half hour. A containment system will be installed on the underside of the drawbridge across the navigation channel. This will reduce the vertical clearance to 18 feet.
Valid 2026-10-15 to 2026-11-14.
USCG Southeast District Local Notice to Mariners 43/2026