HomeMapSky mapAlpha
More
Account
Loading…
Language: English
Coastal

US Coast Guard LNM - Northeast District (D1)

US · Last modified 11 Nov 2026, 18:53

327
active
307
archived
View messagesArchived / Canceled
Export
ECDIS user charts
SearchSubscribe

Full content

SECTOR NEW YORK, SUBMERGED LANDS ACT (SLA) - AMBROSE CHANNEL General / Marine Construction (Excluding Bridges) / Survey Operations Location: 40-28.12N 074-15.34W 40-31.42N 073-51.72W S. T. Hudson Engineers, Inc. plans to conduct geophysical survey operations aboard the M/V BELLA MARIE in the Raritan Bay area from September 8 through December 13, 2026. The work will occur during daylight hours only, seven days per week, and will not be conducted during hazardous sea or weather conditions. Survey activity will extend from Cheesequake Creek across the Raritan, Chapel Hill, and Ambrose channels, with the survey area beginning near 40° 28' 07.352" N, 074° 15' 20.287" W and ending near 40° 31' 25.423002" N, 073° 51' 43.105434" W. The M/V BELLA MARIE is a 40-foot power catamaran survey vessel. During operations, the vessel will tow survey equipment behind and beneath it, including equipment that may extend up to 250 feet astern, which will restrict the vessel’s maneuverability. Mariners operating near the survey vessel should use caution, maintain a safe distance, and proceed at reduced speed. The vessel will continuously monitor VHF Channels 13 and 16 and will check in daily with New York/New Jersey Vessel Traffic Service. The vessel will also maintain a listening watch on VHF Channel 12 or 14 as required by location. The designated shoreside point of contact is Joe Wozniak, HSE & Marine Compliance Manager, S. T. Hudson Engineers, Inc., at 609-412-1242 or [email protected]. Valid 2026-09-08 to 2026-12-14. USCG Northeast District Local Notice to Mariners 45/2026 PORTSMOUTH TO CAPE ANN - ANNISQUAM RIVER General / Hazards To Navigation / Shoaling Reported Severe shoaling has been reported in the Annisquam River. Annisquam River channel buoy 24 (LLNR 9690) has been relocated due to recent shoaling in the area to mark best water. Mariners should proceed with caution while transiting the area USCG Northeast District Local Notice to Mariners 45/2026 RARITAN RIVER CUTOFF CHANNEL - ARTHUR KILL General / Bridges / Maintenance Location: 40-38.73N 074-12.24W Bridge Name: 99 67 Interstate95 Expressway Southbound Bridge Valid 2026-02-12 to 2027-01-01. USCG Northeast District Local Notice to Mariners 45/2026 RARITAN RIVER CUTOFF CHANNEL - ARTHUR KILL General / Bridges / Rehabilitation From July 27, 2026 to October 31, 2028, contractors will be conducting steel repairs and painting of the Outerbridge Crossing over Arthur Kill at mile 2.0. This work will be conducted from up to eight 20-foot-wide work platforms suspended no more than 2 feet 10 inches from the low structural steel of the bridge. Work platforms will be first deployed on August 3, 2026, on the eastern edge of the navigable channel, and will be repositioned across the channel as work is complete at each repair site. Work platforms will be lit with red lights on all four corners. Work shifts are 7:00 a.m. to 3:30 p.m. and 9:30 p.m. to 5:00 a.m. daily. Mariners can obtain information about specific work platform locations can be provided by contacting USCG VTS New York at (718) 354-4088, contacting the on-site contractor at (631) 704-4376, or by contacting the USCG Northeast District Bridge Branch at (571) 607-8154. Mariners are advised to exercise caution when transiting the area. Position 40-31.48N 074-14.82W USCG Northeast District Local Notice to Mariners 45/2026 RARITAN RIVER CUTOFF CHANNEL - ARTHUR KILL General / Bridges / Inspection Location: 40-38.15N 074-11.82W Bridge Name: Goethals Bridge From October 1-December 31, 2026, between 7:00 a.m. and 4:00 p.m., a bridge traveler will be operated under the Goethals Bridge over Arthur Kill Channel at mile 11.5 to perform bridge inspection. Mariners requiring full vertical clearance can contact the contractor via marine radio VHF-FM Ch. 13/16 or call 848-231-3359. The traveler platform will be moved out of the navigable channel after work hours or when not in use. Mariners are advised to exercise caution when transiting the area. Valid 2026-10-01 to 2027-01-01. USCG Northeast District Local Notice to Mariners 45/2026 RARITAN RIVER CUTOFF CHANNEL - ARTHUR KILL General / Hazards To Navigation / Shoaling Reported Location: 40-35.87N 074-11.95W 40-35.85N 074-11.92W 40-35.51N 074-12.23W 40-35.51N 074-12.27W 40-35.87N 074-11.95W NJ - ARTHUR KILL – TREMLEY POINT REACH Shoaling has been identified in the Arthur Kill, between Tremley Point Reach and Rahway River on the New Jersey side in the area between buoys Channel Lighted Buoy 34 and Channel Lighted Buoy 32. Mariners are urged to maintain a sharp lookout and transit the area with extreme caution. Valid 2024-09-13 to 2039-11-29. USCG Northeast District Local Notice to Mariners 45/2026 RARITAN RIVER CUTOFF CHANNEL - ARTHUR KILL General / Marine Construction (Excluding Bridges) / Dredging Bird Construction will conduct dredging operations in Smith Creek Inlet from November 14, 2026, through January 15, 2027, between 7 a.m. and 5 p.m., daily. Multiple deck scow barges, a dredge barge, towing tug, a 60-foot by 125-foot crane barge, and a 37-foot by 150-foot hopper barge will be operating in and near the navigable channel in the vicinity of 40°32'43.7" N, 074°15'12.7" W. No vessel passage will be permitted north of 40°33'16.8" N, 074°15'20.9" W. Mariners requiring passage through Smith Creek Inlet should contact the project vessels on VHF-FM Channel 13 at least 20 to 30 minutes in advance. Mariners are urged to use caution and transit at their slowest safe speed to minimize wake. Valid 2026-11-14 to 2027-01-16. USCG Northeast District Local Notice to Mariners 45/2026 GEORGES BANK AND NANTUCKET SHOALS - BARNSTABLE HARBOR General / Hazards To Navigation / Shoaling Reported MA – BARNSTABLE HARBOR – SHOALING Mariners be advised that shoaling exists in the Barnstable Harbor Entrance channel. Shoaling extends approximately 200 feet into the channel north of Barnstable Harbor Entrance Lighted Buoy 6, in the vicinity of position 41-.43.5 N, 070-16.3W. Water depth is estimated to be 2 feet at low tide in this area. All mariners are requested to use caution while transiting the area. USCG Northeast District Local Notice to Mariners 45/2026 BEVERLY CHANNEL - BASS RIVER General / Bridges / Temp Deviation Construction of a temporary Hall-Whitaker Bridge is ongoing and anticipated to be complete no later than May 29, 2030. Until construction is complete, the Hall-Whitaker Bridge over the Bass River in Beverly, MA at mile 0.6 will remain in the closed position. Smaller vessels with adequate clearance beneath the existing moveable bridge in the closed position will be able to pass. Mariners are advised to exercise caution when transiting the area. Any concerned traffic can contact the project manager (MAS Building & Bridge) at (508) 918-3133, or Mass DOT Highway Division at (857) 443-6594. Position 42-32.98N 070-53.27W USCG Northeast District Local Notice to Mariners 45/2026 BEVERLY CHANNEL - BASS RIVER General / Hazards To Navigation / Shoaling Reported MA-SALEM AND LYNN HARBORS (CHART 13275)-BASS RIVER Severe shoaling has been reported between Bass River Channel Buoy 2 (LLNR 10325)-Bass River Channel Buoy 9 (LLNR 10355) and there is a severe decrease in the channel’s width. Mariners should proceed with caution while transiting the area. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - BAY RIDGE CHANNEL General / Hazards To Navigation / Wrecks Location: NEW YORK, NY – NEW YORK HARBOR – UPPER BAY – ANCHORAGE 21-A Details: AN OPEN HOPPER BARGE SANK IN ANCHORAGE 21-A IN THE UPPER BAY OF NEW YORK HARBOR IN APPROXIMATE POSITION, 40° 39' 35.64"N, 074° 01' 51.42"W. THE BARGE MEASURES 230’ LONG BY 42’ WIDE BY 14’ TALL AND IT SANK IN APPROXIMATELY 13 FEET OF WATER, PORTIONS OF THE BARGE ARE VISIBLE AT LOW TIDE. THE SUNKEN BARGE IS MARKED AT ITS 4 CORNERS BY THREE RED BUOYS AND ONE YELLOW BUOY. A FLOATING WHITE STROBE LIGHT IS ATTACHED TO EACH MARKING BUOY. MARINERS ARE ADVISED TO USE CAUTION WHILE TRANSITING THE AREA. Valid 2026-09-27 to 2027-03-27. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - BAY RIDGE CHANNEL General / Marine Construction (Excluding Bridges) / Survey Operations Location: 40-38.03N 074-02.55W Mariners are advised that Aqua Survey, Inc. will conduct sediment-sampling operations in the Bay Ridge and Red Hook Channels, New York Harbor, from October 26 through November 13, 2026. Operations will occur Monday through Friday from 8 a.m. to 4 p.m. Vessels R/V Tesla, R/V Manasquan, and R/V Prattis will be on scene and can be contacted on VHF Channels 13 and 16. The vessels will be able to move on demand to avoid impeding navigation. Mariners are urged to use caution and proceed at a safe speed when transiting the area. Valid 2026-10-26 to 2026-11-14. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - BAY RIDGE CHANNEL General / Marine Construction (Excluding Bridges) / Dredging Location: 40-40.31N 073-59.90W Cashman Dredging and Marine Contracting Co., LLC will place an 18-foot by 36-foot deck barge staging air-curtain blower equipment for turbidity-control measures associated with the Gowanus Canal Environmental Remediation Project. The barge will be located just north of the Hamilton Avenue Bridge along the west retaining wall, outside the channel and clear of the bridge-opening footprint, at approximately 40°40'18.883" N, 073°59'53.896" W. Operations are scheduled from November 12, 2026, through November 15, 2027. The barge will display corner lights for nighttime identification. Mariners are urged to use caution and contact the work vessel on VHF Channels 13 or 16. Valid 2026-11-04 to 2027-11-16. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - BAY RIDGE CHANNEL General / Marine Construction (Excluding Bridges) / Dredging Cashman Dredging and Marine Contracting Co., LLC will conduct environmental-remediation dredging operations in the Gowanus Canal, Brooklyn, NY, from the 3rd Street Bridge to the Hamilton Avenue Bridge, between approximately 40°40'33.80" N, 073°59'25.04" W and 40°40'05.39" N, 074°00'02.94" W. Operations are scheduled from November 16, 2026, through November 15, 2027, weekdays from 7:00 a.m. to 6:00 p.m. Equipment includes excavator deck barges, hopper barges, a deck scow, and a tugboat. Barges will be attended by a full-time tender and can be moved within approximately 30 minutes to accommodate navigation. Mariners are urged to use caution, reduce speed, minimize wake, and contact work vessels on VHF Channels 13 or 16 for passing arrangements. Valid 2026-11-16 to 2027-11-16. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - BAY RIDGE CHANNEL General / Other Location: 40-40.32N 073-59.90W 40-40.31N 073-59.89W The Gowanus Canal is closed to all recreational boating between 9th Street and Butler Street, including use of the 2nd Street public boat launch, at the direction of the U.S. Environmental Protection Agency (USEPA), the lead federal agency for the Gowanus Canal Superfund Site, due to the ongoing construction of the dredging and capping remedy of the canal until further notice unless specific advance written authorization is granted by USEPA. Contact: (212) 637-3639. For further information: https://gowanussuperfund.com. Valid 2024-09-30 to 2028-12-31. USCG Northeast District Local Notice to Mariners 45/2026 BEACH CHANNEL General / Bridges Location: 40-35.44N 073-49.19W Bridge Name: Cross Bay Blvd Bridge From October 12, 2026 through November 30, 2026, between 6:30 am to 3:30 pm, a contractor will be performing a repair and inspection of underwater pile and pile caps at the Cross Bay Blvd Bridge across Jamaica Bay at mile 6.0, in Queens, NY. The contractor will be utilizing a pile master 31’ Reg #NY5573GZ and a Steel pontoon “Captain Carter” Reg #NY5490HE for this project. Mariners requiring full horizontal clearance can contact the contractor via marine radio VHF-FM Ch 13/16 or by calling Biarn DeBaun at (973) 670-1490, David McGrath (646) 244-8517, or Eric Van Dormolen at (917) 456-6965. Mariners are advised to exercise caution and reduce wake when transiting the area. Valid 2026-10-06 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 GREAT SOUTH BAY - BELLPORT BAY General / Hazards To Navigation / Shoaling Reported Location: 40-44.15N 072-52.46W Shoaling has been reported of 3.0 feet at mean low low water in the vicinity of position 40-44.15N 072-52.46W. Mariners are advised to transit the area with extreme caution. Valid 2026-03-06 to 2027-03-06. USCG Northeast District Local Notice to Mariners 45/2026 SALEM CHANNEL - BEVERLY CHANNEL General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 42-32.30N 070-52.90W Marine construction operations will be conducted in Salem Harbor, MA, in the vicinity of Lobster Rock Daybeacon from approximately September 28, 2026, through November 15, 2026. AGM Marine Contractors, Inc. will remove the Lobster Rock Daybeacon for the U.S. Coast Guard using the dredge PRONCKAI, deck barge THING, and tug SITKA. Work is expected to occur during a single daylight shift, approximately 6:00 a.m. to 8:00 p.m., seven days per week, weather permitting. Mariners are advised to transit the area with caution, reduce wake as necessary, and remain alert for construction vessels and equipment operating on scene. The dredge and tug will monitor VHF-FM Channels 13 and 16 and will use Channel 68 as the working channel. Valid 2026-09-28 to 2026-11-16. USCG Northeast District Local Notice to Mariners 45/2026 APPROACHES TO NEW YORK NANTUCKET SHOALS TO FIVE FATHOM BANK - BLOCK ISLAND SOUND AND GARDINERS BAY General / Hazards To Navigation / Hazards Location: 40-58.55N 071-11.33W Valid 2024-10-01 to 2039-12-31. USCG Northeast District Local Notice to Mariners 45/2026 LONG ISLAND SOUND EASTERN PART - BRIDGEPORT HARBOR General / Bridges / Temp Deviation Location: 41-10.76N 073-11.16W Bridge Name: Stratford Avenue Bridge The Coast Guard has issued a temporary deviation from the regulation governing the operation of the Stratford Avenue Bridge across Pequonnock River at mile 0.1. Under this temporary deviation the Stratford Ave (Route 130) Bridge may remain closed to mariners from October 16, 2026 through November 17, 2026. Questions may be directed to Brian Brinsmade at (203) 389-3173. Mariners are advised to exercise caution when transiting the area. Valid 2026-10-07 to 2026-11-17. USCG Northeast District Local Notice to Mariners 45/2026 PROVIDENCE RIVER APPROACH - BRISTOL HARBOR General / Miscellaneous Location: 41-39.75N 071-16.50W Jaia Robotics will be conducting autonomous underwater vehicle testing, in Narragansett Bay, Monday through Friday, between 8:00am to 7:00pm. The autonomous, underwater, vehicles are around 36 inches in length, and the vehicles come in red/yellow configurations. Valid 2025-11-14 to 2026-12-31. USCG Northeast District Local Notice to Mariners 45/2026 BRONX RIVER General / Bridges / Inspection Location: 40-49.37N 073-53.06W Bridge Name: Eastern Bridge Contractor, AI Engineers, will be performing inspections at the Bruckner Expressway Bridge across Bronx River at mile 1.1 between November 9, 2026 through November 13, 2026 between 8:30 a.m. and 6:30 pm. Contractor will be utilizing a barge, manlift and rescue boat. Mariners requiring full horizontal clearance can contact the contractor via marine radio VHF-FM CH 13/16 or call Abanoub Abdelmaseh (201) 779-0949. Mariners are advised to exercise caution when transiting the area. Valid 2026-10-14 to 2026-11-14. USCG Northeast District Local Notice to Mariners 45/2026 BRONX RIVER General / Bridges Location: 40-49.69N 073-56.03W Bridge Name: Macombs Dam Bridge The Coast Guard proposes to temporarily modify the operating regulation that governs the Macombs Dam Bridge across the Harlem River, mile 3.2, between the Boroughs of Manhattan and the Bronx, New York City, New York. The bridge owner, New York City Department of Transportation (NYCDOT), submitted a request on August 31, 2026, to allow the bridge to remain in the closed position from February 1, 2027, through November 30, 2027, and facilitate rehabilitation of the bridge structure. We invite your comments on this proposed rulemaking. DATES: Comments and related material must be received by the Coast Guard on or before December 7, 2026. The Coast Guard anticipates that this proposed rule will be effective from 12:01 a.m. on February 1, 2027, through 11:59 p.m. on November 30, 2027. ADDRESSES: You may submit comments identified by docket number USCG– 2026–1338 at https:// www.regulations.gov Valid 2027-02-01 to 2027-11-30. USCG Northeast District Local Notice to Mariners 45/2026 EAST RIVER MAIN CHANNEL - BRONX RIVER General / Marine Construction (Excluding Bridges) / Dredging Location: 40-48.08N 073-51.87W Mariners are advised that Donjon Marine Co., Inc. will conduct dredging operations in the Bronx River Federal Channel from October 12, 2026, through February 15, 2027. Operations are scheduled 24 hours a day, seven days a week, and will involve a dredge, tending tug, towing tugs with dump scows, and a crew boat in the vicinity of approximately 40°48'04.7"N, 073°51'52.5"W. Vessels may contact the dredging operation on VHF Channel 78; the project will also monitor VHF Channels 13, 14, and 16. Mariners are urged to use caution, reduce speed as appropriate, maintain a safe distance from project equipment, and arrange passing with the dredge in advance when possible. The dredge can move upon request but requests 20 to 25 minutes’ notice to clear the channel. Valid 2026-10-12 to 2027-02-16. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - BUTTERMILK CHANNEL General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 40-41.12N 074-00.62W Mariners are advised that pier-strengthening operations will be conducted at Pier 10, Berth 10, Brooklyn Marine Terminal, Red Hook, Brooklyn, New York, in Buttermilk Channel, Upper New York Bay, centered at approximately 40°41.106′ N, 074°00.606′ W. From November 2, 2026, through January 15, 2027, a crane barge moored alongside the berth face will support installation of approximately 110 steel pipe piles and construction of concrete pile caps. Material barges and tugs may transit to and from the site. Operations will occur Monday through Saturday during daylight hours, approximately 7 a.m. to 5 p.m. All equipment will remain within the Pier 10 berth limits and the federal channel will remain unobstructed. Mariners are requested to pass at minimum wake and exercise caution in the vicinity. Work vessels will monitor VHF Channels 13 and 16. Valid 2026-11-02 to 2027-01-16. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - BUTTERMILK CHANNEL General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 40-41.19N 074-00.91W Mariners are advised that marine demolition and construction operations will be conducted at Yankee Pier, Governors Island, near Craig Road South and Division Road, Brooklyn, New York, at approximate position 40°41'11.2"N, 74°00'54.6"W. Work includes demolition of the existing pier and removal of a ferry barge, followed by installation of a pipe-pile-supported pier, precast pile caps and planks, cast-in-place topping slabs, a new barge and floating dock, monopiles, fendering, and associated marine appurtenances. Operations are scheduled from November 11, 2026, through December 6, 2028, generally Monday through Friday from 7:00 a.m. to 4:00 p.m., with potential extended shifts during in-water work windows. Work vessels CB BERGEN and RTC 320 will be on scene. Mariners are urged to transit the area with caution and provide 24 hours’ notice to facilitate vessel movements and avoid impeding navigation. Valid 2026-10-29 to 2026-12-07. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - BUTTERMILK CHANNEL General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 40-40.98N 074-01.38W Mariners are advised that marine demolition and construction operations will be conducted at Yankee Pier, Governors Island, near Craig Road South and Half Moon Road, in the vicinity of 40°40'58.8"N, 074°01'22.8"W, from November 10, 2026, through December 6, 2028. Work includes demolition of existing piers and a boat hoist, as well as installation of a barge, floating dolphin, monopiles, fendering, and other marine appurtenances. Operations are expected Monday through Friday from 7:00 a.m. to 4:00 p.m., with possible extended in-water work periods. The vessels CB SUSSEX and RTC 20 will be on scene. Mariners are requested to transit the area with caution and allow 24 hours for work vessels to move, if necessary, to avoid impeding navigation. Valid 2026-11-10 to 2026-12-07. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - BUZZARDS BAY MAIN CHANNEL General / Autonomous Vessel Operations The Woods Hole Oceanographic Institution (WHOI) will deploy the Pyxis AUV in Buzzards Bay (41.574, -70.721) after which it will transit the length of the Bay, turn (41.447, -71.008) and transit due south before returning along the same route 2-4 days later. The Intended track appears below. The autonomous underwater vehicle (AUV) is 9’ long and 12” in diameter. It is yellow and orange with a strobe that flashes white twice per second when on the surface. The AUV will transit submerged, except for periodic surfacing intervals every 4-6 hours for periods of 5-10 minutes, possibly up to 1 hr. The AUV will be deployed 2026-11-10 and recovered on or about 2026-11-16. Mariners are requested to leave the AUV undisturbed if encountered on the surface. The AUV operates untended, with no surface escort. Operators command it via satellite during surfacing events Valid 2026-11-10 to 2026-11-18. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - BUZZARDS BAY MAIN CHANNEL General / Hazards To Navigation / Shoaling Reported MA – CUTTYHUNK HARBOR – ENTRY CHANNEL Mariners are advised that the navigable width of the entry channel into Cuttyhunk Harbor has decreased to approximately 15 feet wide. This may cause navigability issues and restrict movement for two-way traffic. Mariners are urged to maintain a proper lookout and use extreme caution while transiting the area. You may contact the local harbormaster by phone at (508) 990-7578. Valid 2024-09-12 to 2039-08-23. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - BUZZARDS BAY MAIN CHANNEL General / Marine Events / Regatta (Race) RI – BUZZARDS BAY, VINEYARD SOUND – HORATIO BREWSTER PERSUIT RACE – RACE/REGATTA Mariners are advised that the Horatio Brewster Persuit Race is scheduled to be held from Padanaram Harbor, MA to Menemsha, MA. The event will take place on Saturday June 20, 2026, from 9:00 a.m. to 4:00 p.m. Expect up to 10 sailing vessels, 20-40 ft in length. Mariners are advised to transit the area with extreme caution. Mariners may contact the person in charge by phone at (508) 843-4426. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - CANAPITSIT CHANNEL General / Hazards To Navigation / Shoaling Reported Mariners are advised of shoaling in the Cuttyhunk Inner Harbor Entrance Channel. The shoaling is reported to extend across the entirety of the entrance channel with an approximate depth at mean low water of 5 feet. Mariners are urged to exercise extreme caution while transiting this area. USCG Northeast District Local Notice to Mariners 45/2026 HOG ISLAND CHANNEL - CAPE COD CANAL EASTERN ENTRANCE General / Bridges / Maintenance Atlas Painting and Sheeting Corp. will be conducting bridge sandblasting and painting operations on the Buzzards Bay Railroad Bridge over the Cape Cod Canal beginning 9 March 2026 through 31 December 2026. Scaffolding will reduce the vertical clearance from 135 feet to 130 feet MHW. Questions concerning the project should be directed to the Duty Marine Traffic Controller, US Army Corps of Engineers, Cape Cod Canal Field Office at 978-318-8500 or VHF Channel 14. Mariners should exercise caution while transiting the area. Position 41-44.52N 070-36.82W USCG Northeast District Local Notice to Mariners 45/2026 HOG ISLAND CHANNEL - CAPE COD CANAL EASTERN ENTRANCE General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 41-44.52N 070-36.81W Atlas Painting and Sheeting Corp. will be conducting bridge sandblasting and painting operations on the Buzzards Bay Railroad Bridge over the Cape Cod Canal beginning 9 March 2026 through 31 December 2026. Scaffolding will reduce the vertical clearance from 135 feet to 130 feet MHW. Questions concerning the project should be directed to the Duty Marine Traffic Controller, US Army Corps of Engineers, Cape Cod Canal Field Office at 978-318-8500 or VHF Channel 14. Mariners should exercise caution while transiting the area. Valid 2026-03-09 to 2027-02-17. USCG Northeast District Local Notice to Mariners 45/2026 HOG ISLAND CHANNEL - CAPE COD CANAL EASTERN ENTRANCE General / Threatened And Endangered Species Advisory (TESS Advisory) / Marine Wildlife Migration NOAA FISHERIES ANNOUNCES THAT A VOLUNTARY VESSEL SPEED RESTRICTION ZONE UNDER THE RIGHT WHALE SLOW ZONE PROGRAM IS CURRENTLY IN EFFECT IN CAPE COD BAY, MASSACHUSETTS TO PROTECT RIGHT WHALES. THIS RIGHT WHALE SLOW ZONE IS IN EFFECT THROUGH NOVEMBER 17, 2026. NOAA REQUESTS MARINERS TO ROUTE AROUND THIS ZONE OR TRANSIT THROUGH IT AT TEN KNOTS OR LESS. THE CAPE COD BAY SLOW ZONE AREA IS BOUNDED BY: 42 DEGREES 10 MINUTES NORTH, 41 DEGREES 40 MINUTES NORTH, 069 DEGREES 59 MINUTES WEST, 070 DEGREES 40 MINUTES WEST. INFORMATION ABOUT VOLUNTARY VESSEL SPEED RESTRICTIONS CAN ALSO BE FOUND AT: HTTPS://WWW.FISHERIES.NOAA.GOV/NATIONAL/ENDANGERED-SPECIES-CONSERVATION/REDUCING-VESSEL-STRIKES-NORTH-ATLANTIC-RIGHT-WHALES Valid 2026-11-04 to 2026-11-18. USCG Northeast District Local Notice to Mariners 45/2026 EAST PENOBSCOT BAY - CASTINE HARBOR General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 44-23.33N 068-47.71W 44-23.32N 068-47.68W 44-23.15N 068-47.81W 44-23.16N 068-47.82W 44-23.33N 068-47.71W ME-PENOBSCOT BAY-CASTINE HARBOR Redd & Reed will be conducting marine construction and pier replacement and expansion operations at the Maine Maritime Academy, in Castine, in position 44-23.18N 068-47.80W, from July 8, 2024, to the winter of 2027. Work will be conducted between 7:00am to 7:00pm, by deck barges, tugboats, push boats, and work skiffs, who will monitoring VHF-FM CH 11 for any concerned traffic. Mariners are urged to use extreme caution and transit the area at their slowest safe speed to create minimum wake after passing arrangements have been made. Valid 2024-07-08 to 2027-03-31. USCG Northeast District Local Notice to Mariners 45/2026 PRESIDENT ROADS - CHELSEA RIVER General / Bridges / Inspection NDT Corporation has another temporary bridge inspection and testing project planned for this year working for Hardesty and Hanover and for the MassDOT. Below are a few summary bullets for the Andrew McArdle bridge project (Meriden Street over the Chelsea River). • The owners of this bridge are the City of Chelsea and City of Boston. • No work will be conducted in the main channel at this crossing. • Work will be completed on the 12 interior bridge supports (10 piers and 2 abutments). • Northeast Work and Safety Boat LLC will be providing NDT Corporation with proper marine access to the bridge. o 20’ pontoon boat with a 50 HP motor and a boat operator with adjustable scaffolding will be used to test the face of the supports. o A second support boat/motor/operator and will be present. • Tentative workdays on the water at the10 piers are Monday November 30 through Friday December 4, 2026. • MA State Police Marine Division detail will be on site for the planned 5 days. • Working daytime hours are expected to be 7AM to 4PM. • Launch and night mooring details are being finalized and all boats will be moored at a marina overnight • Local proactive notifications will be made to the Boston and Chelsea police and fire departments Position 42-23.15N 071-02.35W USCG Northeast District Local Notice to Mariners 45/2026 NORTH CHANNEL SAYBROOK TO NEW HAVEN - CLINTON HARBOR ATON / Advanced Notice of Change Location: 41-15.65N 072-31.60W Aid Name: Clinton Harbor Channel Buoy 6 LLNR: 23470 Action: CHANGE Action Type Change Light System Primary The U.S. Coast Guard will be making the following change to Aids to Navigation: CHANGE the following aids from unlighted aids to lighted aids as indicated; Add to the remarks section of Light List Vol 1 Aid removed when endangered by ice. Light removed from Nov 15 to May 1. Clinton Harbor Channel Buoy 6 (LLNR 23470) to Clinton Harbor Channel Lighted Buoy 6 (LLNR 23470) Fl R 4s Clinton Harbor Channel Buoy 9 (LLNR 23485) to Clinton Harbor Channel Lighted Buoy 9 (LLNR 23485) Fl G 2.5s Clinton Harbor Channel Buoy 11 (LLNR 23490) to Clinton Harbor Channel Lighted Buoy 11 (LLNR 23490) Q G Clinton Harbor Channel Buoy 11A (LLNR 23495) Clinton Harbor Channel Lighted Buoy 11A (LLNR 23495) Fl G 2.5s Previously advertised as a proposal for Project 01-23-058 in LNM 01/26. E-mail can be sent to: [email protected]. Valid 2026-09-02 to 2027-03-01. USCG Northeast District Local Notice to Mariners 45/2026 NORTH CHANNEL SAYBROOK TO NEW HAVEN - CLINTON HARBOR ATON / Advanced Notice of Change Location: 41-15.79N 072-31.58W Aid Name: Clinton Harbor Channel Buoy 9 LLNR: 23485 Action: CHANGE Action Type Change Light System Primary The U.S. Coast Guard will be making the following change to Aids to Navigation: CHANGE the following aids from unlighted aids to lighted aids as indicated; Add to the remarks section of Light List Vol 1 Aid removed when endangered by ice. Light removed from Nov 15 to May 1. Clinton Harbor Channel Buoy 6 (LLNR 23470) to Clinton Harbor Channel Lighted Buoy 6 (LLNR 23470) Fl R 4s Clinton Harbor Channel Buoy 9 (LLNR 23485) to Clinton Harbor Channel Lighted Buoy 9 (LLNR 23485) Fl G 2.5s Clinton Harbor Channel Buoy 11 (LLNR 23490) to Clinton Harbor Channel Lighted Buoy 11 (LLNR 23490) Q G Clinton Harbor Channel Buoy 11A (LLNR 23495) Clinton Harbor Channel Lighted Buoy 11A (LLNR 23495) Fl G 2.5s Previously advertised as a proposal for Project 01-23-058 in LNM 01/26. E-mail can be sent to: [email protected]. Valid 2026-09-02 to 2027-03-01. USCG Northeast District Local Notice to Mariners 45/2026 NORTH CHANNEL SAYBROOK TO NEW HAVEN - CLINTON HARBOR ATON / Advanced Notice of Change Location: 41-15.94N 072-31.40W Aid Name: Clinton Harbor Channel Buoy 11 LLNR: 23490 Action: CHANGE Action Type Change Light System Primary The U.S. Coast Guard will be making the following change to Aids to Navigation: CHANGE the following aids from unlighted aids to lighted aids as indicated; Add to the remarks section of Light List Vol 1 Aid removed when endangered by ice. Light removed from Nov 15 to May 1. Clinton Harbor Channel Buoy 6 (LLNR 23470) to Clinton Harbor Channel Lighted Buoy 6 (LLNR 23470) Fl R 4s Clinton Harbor Channel Buoy 9 (LLNR 23485) to Clinton Harbor Channel Lighted Buoy 9 (LLNR 23485) Fl G 2.5s Clinton Harbor Channel Buoy 11 (LLNR 23490) to Clinton Harbor Channel Lighted Buoy 11 (LLNR 23490) Q G Clinton Harbor Channel Buoy 11A (LLNR 23495) Clinton Harbor Channel Lighted Buoy 11A (LLNR 23495) Fl G 2.5s Previously advertised as a proposal for Project 01-23-058 in LNM 01/26. E-mail can be sent to: [email protected]. Valid 2026-09-02 to 2027-03-01. USCG Northeast District Local Notice to Mariners 45/2026 NORTH CHANNEL SAYBROOK TO NEW HAVEN - CLINTON HARBOR ATON / Advanced Notice of Change Location: 41-16.03N 072-31.40W Aid Name: Clinton Harbor Channel Buoy 11A LLNR: 23495 Action: CHANGE Action Type Change Light System Primary The U.S. Coast Guard will be making the following change to Aids to Navigation: CHANGE the following aids from unlighted aids to lighted aids as indicated; Add to the remarks section of Light List Vol 1 Aid removed when endangered by ice. Light removed from Nov 15 to May 1. Clinton Harbor Channel Buoy 6 (LLNR 23470) to Clinton Harbor Channel Lighted Buoy 6 (LLNR 23470) Fl R 4s Clinton Harbor Channel Buoy 9 (LLNR 23485) to Clinton Harbor Channel Lighted Buoy 9 (LLNR 23485) Fl G 2.5s Clinton Harbor Channel Buoy 11 (LLNR 23490) to Clinton Harbor Channel Lighted Buoy 11 (LLNR 23490) Q G Clinton Harbor Channel Buoy 11A (LLNR 23495) Clinton Harbor Channel Lighted Buoy 11A (LLNR 23495) Fl G 2.5s Previously advertised as a proposal for Project 01-23-058 in LNM 01/26. E-mail can be sent to: [email protected]. Valid 2026-09-02 to 2027-03-01. USCG Northeast District Local Notice to Mariners 45/2026 NORTH CHANNEL SAYBROOK TO NEW HAVEN - CONNECTICUT RIVER General / Bridges / Construction Location: 41-18.65N 072-20.95W Bridge Name: Amtrak Railroad Bridge CONNECTICUT – CONNECTICUT RIVER – From July 7, 2025, through December 30, 2029, AMTRAK will have moored barges in place during the construction and demolition of the Amtrak Connecticut River Bridge. Due to the placement of a temporary fendering system, the horizontal clearance of the bridge in the navigation channel will be reduced to 115 feet. Similarly, the placement of temporary signal cables overhead of the navigation channel will reduce vertical clearance to 100 feet above MHW when the bridge is in the open position. From October 1, 2025 to November 15, 2025, contractors will be performing dive operations to remove submarine cables from 0630-1830 Monday through Friday. From October 30, 2025 through October 31, 2025, dive operations are scheduled to take place in the navigational channel. Barges will be placed along the bridge fenders blocking the channel. Mariners are encouraged to avoid the channel while dive operations are taking place. However, mariners requiring passage must contact Michael King at (617) 653-7987 with a 2 hour advance notice to arrange transit through the work area. Mariners are advised to exercise caution and reduce wake when transiting the area. Mariners with questions or concerns can contact the contractor via marine radio VHF-FM Ch 13/16 or call Patrick Finley at (860) 806-2365 or Bob Nardi at (203) 496-7353. Valid 2025-05-08 to 2029-12-31. USCG Northeast District Local Notice to Mariners 45/2026 NORTH CHANNEL SAYBROOK TO NEW HAVEN - CONNECTICUT RIVER General / Bridges / Construction Location: 41-18.65N 072-20.95W Bridge Name: Amtrak Railroad Bridge CONNECTICUT – CONNECTICUT RIVER – Moored Barge – AMTRAK will have a moored barge placed during the construction and demolition of the Amtrak Connecticut River Bridge. Beginning August 1, 2025 through December 30, 2029. The crane barge 120’ x 300’ will be moored outside of the navigational channel used for stationary material barges to support the installation of new bridge components and removal of the existing structure towards the end of the project.. Beginning December 22, 2025, barges and platform will be placed in the navigational channel for the new bridge construction. During this time the navigational clearance will be reduced to 100' vertical clearance and 110' horizontal clearance. Mariners are advised to exercise caution and reduce wake when transiting the area. Mariners with questions or concerns can contact the contractor via marine radio VHF-FM Ch 13/16 or call Patrick Finley at (860) 806-2365 or Bob Nardi at (203) 496-7353. Valid 2025-12-22 to 2029-12-31. USCG Northeast District Local Notice to Mariners 45/2026 NORTH CHANNEL SAYBROOK TO NEW HAVEN - CONNECTICUT RIVER General / Bridges / Rehabilitation Location: 41-42.88N 072-38.44W Bridge Name: Putnam 3 Route Bridge CONNECTICUT – CONNECTICUT RIVER – Connecticut Department of Transportation will be rehabilitating the Putnam Bridge across Connecticut River, mile 47.4, between Glastonbury and Wethersfield, Connecticut. To perform this work the contractor will be installing a work platform beginning May 31, 2026. The platform will reduce the vertical clearance to 75’. This work platform will be installed until November 2028. The contractors work hours are as follows: Day Shift: • Monday – Friday 7:00AM – 5:30PM and Saturday 7:00AM – 3:30PM Night Shift: • Sunday – Friday 7:00PM – 6:00AM Mariners are advised to exercise caution and reduce wake when transiting the area. Mariners with questions or concerns can contact the contractor via marine radio VHF-FM Ch 13/16 or call Ryan Hawkins 860-515-9205. Valid 2026-05-12 to 2028-11-30. USCG Northeast District Local Notice to Mariners 45/2026 NORTH CHANNEL SAYBROOK TO NEW HAVEN - CONNECTICUT RIVER General / Bridges / Rehabilitation Location: 41-48.80N 072-38.70W Bridge Name: Bissell Bridge CONNECTICUT- CONNECTICUT RIVER – Bridge Rehabilitation – Beginning June 18, 2026 through November 12, 2027, Connecticut DOT is performing rehabilitation on the superstructure and substructure of the Bissell Bridge across Connecticut River across Connecticut River at mp 55.8, in Hartford, Connecticut. To perform this, work the contractor will be utilizing 2 barges in the waterway, 8’x40’. The barges will be moved to the west side of pier 2 or west side of pier 10 during non-working hours. Contractors will be working in two shifts, Day Shift 07:00 AM-03:30 PM, Night shift 06:00 PM-06:00 AM. For more information contact Roy Oemceke at (207) 952-4201. Mariners are advised to use caution and transit at slow speed to minimize wake. Valid 2026-06-15 to 2027-11-13. USCG Northeast District Local Notice to Mariners 45/2026 NORTH CHANNEL SAYBROOK TO NEW HAVEN - CONNECTICUT RIVER General / Bridges / Inspection Location: 41-19.13N 072-20.85W Bridge Name: Raymond E Baldwin Bridge From October 1, 2026 to October 31, 2026 between 8:30 a.m. and 4 p.m., Consor Engineering will be performing dive inspection and under-bridge inspection at the I-95 across Connecticut River at mile 4. The contractor will be utilizing a safety/dive boat and under bridge inspection unit will be placed on the bridge. Mariners requiring full vertical and/or horizontal clearance can contact the contractor via marine radio VHF-FM Ch 13/16 or call Yaroslav Skoplyak (860) 780-8606. Mariners are advised to exercise caution and reduce wake when transiting the area. Valid 2026-09-17 to 2027-03-16. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR NORTHERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - DAMARISCOTTA RIVER General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 43-57.35N 069-34.54W \Fuller Marine Services, Inc. submitted a Local Notice to Mariners (LNM) Information Form to the U.S. Coast Guard First District for the full removal and replacement of Merry Island Daybeacon 15 (LLNR 5365) in the Damariscotta River, Maine. The project, The project will replace the aid entirely, is scheduled to begin on June 15, 2026, and will continue until completion, with daily operations from 7:00 AM to 6:00 PM using the vessels Enzo Charles and Mary Louisa II. Vessels will monitor VHF-FM Channels 16 and 13 for navigational safety and passing arrangements, with secondary contact available on Channel 09 or USCG working channel 22A. The crew will maintain a clear fairway for all traffic and will reposition within 30 minutes if additional channel breadth is required, subject to weather and safety conditions. Valid 2026-06-02 to 2027-06-02. USCG Northeast District Local Notice to Mariners 45/2026 BEVERLY CHANNEL - DANVERS RIVER General / Bridges / Maintenance Location: 42-32.59N 070-53.90W Bridge Name: Kernwood Ave Bridge MASSACHUSETTS – SALEM/BEVERLY- DANVERS RIVER – Kernwood Bridge Fender System Repairs Mariners are advised that SPS New England and Black Dog Divers will be conducting emergency bridge fender system repairs at the Kernwood Bridge mile 1.0 over the Danvers River. Work will commence on Tuesday October 13th, 2026. Work hours will be 7:00 a.m. to 3:00 p.m. Monday through Friday and continue until December 11th, 2026. Vessels requiring passage through the channel are requested to provide 15 minutes advanced notice to clear divers from the water. Mass DOT POC is Mr. Tom Gallager (978) 886-3724 and SPS/Black Dog POC is Mr. Derrick Wilson (774) 836-4441. On-scene patrol vessel will be monitoring VHF-Fm Ch 12/13. Mariners are advised to plan accordingly and proceed at slowest speed possible through the work area to minimize wake. Valid 2026-10-13 to 2026-12-31. USCG Northeast District Local Notice to Mariners 45/2026 EASTERN APPROACH - EAST PASSAGE General / Hazards To Navigation / Obstructions Location: 41-32.05N 071-20.44W Mariners are advised that a SOFAR drifter buoy with an attached navigational cone will be anchored in the vicinity east of Gould Island, Newport, Rhode Island, at approximate position 41°32.053′N, 071°20.441′W, from October 27 through November 20, 2026. The buoy will remain on scene continuously during this period. Mariners are urged to transit the area with caution and maintain a safe distance from the buoy and associated equipment. Valid 2026-10-27 to 2026-11-21. USCG Northeast District Local Notice to Mariners 45/2026 EASTERN APPROACH - EAST PASSAGE General / Naval Activity / Naval Testing (Surface / Underwater) RI-NARRAGANSETT BAY - NAVAL UNDERSEA WARFARE CENTER WILL BE CONDUCTING TESTING USING SURFACE AND SUBSURFACE DEVICES NORTH AND EAST OF GOULD ISLAND IN THE NAVY TEST RANGE RESTRICTED AREA MARKED ON NOAA CHART 13223 NORTH OF THE NEWPORT BRIDGE. OPERATIONS WILL BE CONDUCTED MONDAY THRU FRIDAY 0700-1700. MARINERS ARE REQUESTED TO COOPERATE WITH PARTICIPATING VESSELS FOR THE SAFETY OF ALL. ANY CONCERNED TRAFFIC CAN CONTACT NAVY SUPPORT CRAFT ON VHF CHANNELS 13,16. FOR MORE INFORMATION PLEASE CONTACT 401-832-6140. Valid 2026-03-05 to 2027-03-06. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Bridges / Rehabilitation Location: 40-46.79N 073-55.61W Bridge Name: Triboro Bridge Structural Rehabilitation –Construction at the RFK Bridge across East River at mile 7.8 will commence on July 1, 2024. Hours of operation are during daylight hours. A temporary platform will be installed under the entire length and width of suspended span. The platform will reduce the vertical clearance by 4 feet plus 2 feet sag allowance (6 feet total). There will hot work/welding during construction. Any questions regarding this project can contact Andre Markarian via marine radio VHF-FM Ch. 13/16 or 510-774-2198. This project is to be completed by December 31, 2027. Mariners are advised to exercise caution when transiting the area. Valid 2024-07-01 to 2027-12-31. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Bridges / Rehabilitation Location: 40-47.96N 073-47.62W Bridge Name: Throgs Neck Bridge Pier Protection Fender System Replacement – Exploratory Indicator Pile Program/Design/construction of fender system to the Bronx and Queens Towers of the Throgs Neck Bridge across East River at mile 15.8 is in progress. Hours of operation are from 7 a.m. to 5:30 p.m. daily. Crane and material barges will be operating along the perimeter of the Bronx and Queens Towers. Any questions regarding this project can contact Steve Mejia via marine radio VHF-FM Ch. 13/16 or 732-522-1238. This project is to be completed by December 31, 2026. Mariners are advised to exercise caution when transiting the area. Valid 2024-05-13 to 2026-12-31. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Bridges / Closure (Scheduled Or Emergency) Location: 40-44.34N 073-56.56W Bridge Name: Borden Ave Bridge NEW YORK – EAST RIVER NEWTOWN CREEK – DUTCH KILLS – Bridge Closure – The Borden Ave Bridge, mile 1.2, is closed due to vandalism. Vessels able to pass under the bridge in the closed position may do so. Mariners with questions may contact Keith Burrows at (212) 839-3741, NYCDOT Director of Bridge & Tunnel Operations. Mariners are advised to plan their transits accordingly. Valid 2024-11-06 to 2026-12-25. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Bridges / Inspection From May 1, 2026 – December 31, 2026, Monday-Friday, with occasional Saturdays and Sundays, between 8:00 a.m. and 4:00 p.m., a biennial bridge inspection using a traveler and rigging will be conducted on the Manhattan Bridge, mile 1.1 in the East River, New York City. The safety boat Kylie Anne (CT8893BM) will be on scene during inspection operations. Mariners requiring the traveler to move to provide full vertical clearance can contact VTS New York, or contact the contractor via marine radio VHF-FM Ch. 13/16 or by calling 631-891-9721. Mariners are advised to exercise caution when transiting the area. Position 40-42.43N 073-59.43W USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Bridges / Inspection Location: 40-46.92N 073-53.30W Bridge Name: Rikers Island Bridge From June 15, 2026, to November 30, 2026, between 8:00 a.m. and 4:00 p.m., Monday-Friday and Saturday/Sunday, a barge and rowboat will be operated under Rikers Island Bridge over East River at mile 10.7 to perform inspections. Mariners requiring full horizontal clearance can contact the contractor via marine radio VHF-FM Ch. 13/16 or call 646-460-3880 or 863-326-3750. Safety vessel NY8360GY will be on scene during the inspection. The barge and rowboat will be moved out of the navigable channel after work hours or when not in use. Mariners are advised to exercise caution when transiting the area. Valid 2026-06-15 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Bridges / Inspection Location: 40-48.03N 073-55.69W Bridge Name: 125th St Bridge From June 15, 2026, to December 31, 2026, between 7:00 a.m. and 4:00 p.m., a barge with manlift will be operated under 125th St. (RFK) Bridge over Harlem River at mile 1.3 to perform inspections. Mariners requiring full horizontal clearance can contact the contractor via marine radio VHF-FM Ch. 13/16 or call 347-489-2906. The barge with manlift will be moved out of the navigable channel after work hours or when not in use. Mariners are advised to exercise caution when transiting the area. Valid 2026-06-15 to 2027-01-01. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Bridges / Inspection Location: 40-44.35N 073-57.15W Bridge Name: Pulaski Bridge NEW YORK-NEWTOWN CREEK- From July 27, 2026 through November 20, 2026 between 9:00 a.m. to 3:00 p.m., contractors will be inspecting the Pulaski Bridge across Newtown Creek at mile 0.6, in Queens, NY. The contractor will be utilizing a 60’ Under Bridge Inspection Unit (UBIU) with 60’ manlift. Mariners requiring full vertical clearance can contact the contractor via marine radio VHF-FM Ch 13/16 or call Han Chen (917) 306-0152. Mariners are advised to exercise caution and reduce wake when transiting the area. Valid 2026-07-20 to 2026-11-21. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Bridges / Inspection Location: 40-43.99N 073-56.42W Bridge Name: Greenpoint Ave Bridge On September 21, 2026 to December 30, 2026 between 9:00 a.m. and 3:00 p.m. NYCDOT will be utilizing a barge with 60’ manlift to inspect the Greenpoint Ave Bridge over Newtown Creek at mile 1.3 for bridge inspections. Mariners requiring full horizontal clearance can contact the contractor via marine radio VHF-FM Ch 13/16 or call Jan Pawluczuk at (646) 872-2967. Mariners are advised to exercise caution and reduce wake when transiting the area. Valid 2026-09-15 to 2026-12-31. USCG Northeast District Local Notice to Mariners 45/2026 EAST RIVER MAIN CHANNEL General / Bridges Location: 40-43.65N 073-55.73W Bridge Name: Kosciusko Bridge From October 5, 2026 through December 30, 2026 between 9am to 3pm, contractors will be inspecting the Kosciuszko Bridge across Newtown Creek at mile 2.1, in Queens, NY. The contractor will be utilizing a 60’ Under Bridge Inspection Unit (UBIU) with manlift. Mariners requiring full vertical clearance can contact the contractor via marine radio VHF-FM Ch 13/16 or call Han Chen (917) 306-0152. Mariners are advised to exercise caution and reduce wake when transiting the area. Valid 2026-09-29 to 2026-12-31. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Bridges / Inspection Location: 40-45.81N 073-56.75W Bridge Name: Roosevelt Island Bridge From October 12-November 30, 2026, between 8:00 am to 4:00 pm, Monday-Friday and Saturday/Sunday an under-bridge inspection unit (UBIU) and Safety Boat NY 8360 GY will be operating at the Roosevelt Island Bridge across East River at mile 6.4, between Manhattan and Queens, NY. Mariners requiring full vertical clearance can contact the contractor via marine radio VHF-FM Ch 13/16 or by calling (646) 460-3880. Mariners are advised to exercise caution and reduce wake when transiting the area. Valid 2026-10-12 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Bridges / Maintenance Location: 40-45.42N 073-57.28W Bridge Name: Queensboro Bridge On October 23,, between 8:00 a.m. and 9:00 p.m., a bridge traveler will be operated under the Queensboro Bridge over East River at mile 5.5 to perform bridge inspection. Mariners requiring full vertical clearance can contact the contractor via marine radio VHF-FM Ch. 13/16 or call 917-295-1856 or 917-471-2257. The traveler platform will be moved out of the navigable channel after work hours or when not in use. Mariners are advised to exercise caution when transiting the area. Valid 2026-10-23 to 2027-04-24. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Bridges / Inspection Location: 40-42.82N 073-58.33W Bridge Name: Williamsburg Bridge From October 26, 2026, to November 20, 2026, between 8:00 am to 4:00 pm Monday through Friday, a cable and tower inspection will take place at the Williamsburg Bridge across East River at mile 2.3, in Brooklyn, NY. Safety boat CT8893BM will be on scene during inspection operations. Mariners requiring full vertical clearance can contact the contractor via marine radio VHF-FM Ch. 13/16 or by calling (860) 707-7337. Mariners are advised to exercise caution when transiting the area. Valid 2026-10-26 to 2026-11-21. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Bridges / Inspection Location: 40-45.42N 073-57.28W Bridge Name: Queensboro Bridge Valid 2026-11-12 to 2026-11-14. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Bridges / Maintenance Location: 40-45.42N 073-57.28W Bridge Name: Queensboro Bridge On November 13, 2026, between 9:00 a.m. and 2:00 p.m., a bridge traveler will be operated under the Queensboro Bridge over East River at mile 5.5 to perform bridge inspection. Mariners requiring full vertical clearance can contact the contractor via marine radio VHF-FM Ch. 13/16 or call 917-295-1856 or 917-471-2257. The traveler platform will be moved out of the navigable channel after work hours or when not in use. Mariners are advised to exercise caution when transiting the area. Valid 2026-11-13 to 2026-11-14. USCG Northeast District Local Notice to Mariners 45/2026 EAST RIVER MAIN CHANNEL General / Bridges Location: 40-47.96N 073-47.62W Bridge Name: Throgs Neck Bridge Beginning November 20, 2026 through July 16, 2026, contractor Navillus, will be performing pier rehabilitation at the Throgs Neck Bridge across East River at mile point 15.8. To perform this work contractors will be utilizing a barge, HUGHES 115 (114 ft x 35 ft x 8 ft, light draft 2 ft 6 in). Bridge rehabilitation will take place at pier 42, 44, and 17. Mariners with any questions can contact Jimmy Dwyer, Superintendent, at (917) 697-1807 or via marine radio VHF-FM CH 13/16. Mariners are advised to exercise caution when transiting the area. Valid 2026-11-09 to 2027-07-17. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Bridges / Inspection On November 14, 2026, and November 17, 2026, between 6:00 a.m. and 2:00 p.m., a bridge traveler will be operated under the Brooklyn Bridge over East River at mile 0.8 to perform a bridge inspection. Mariners requiring full vertical clearance can contact the contractor via marine radio VHF-FM Ch. 13/16 or call 917-295-1856 or 917-471-2257. The traveler platform will be moved out of the navigable channel after work hours or when not in use. Mariners are advised to exercise caution when transiting the area. Position 40-42.37N 073-59.80W USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 40-48.25N 073-55.83W Trevcon Construction Company will be conducting demolition and reconstruction operations on the Harlem River, west shoreline from RFK Bridge(125th St.) to Metro North Rail Bridge (132nd St.)in position 40-48.25N 073-55.83W, through August 2027, Monday through Friday, between 5:00am to 6:00pm. Equipment on scene will be multiple crane barges, and material barges, monitoring VHF-FM CH 13, 16, 65, &75. Floating Equipment will be positioned along the West shoreline of the Harlem River, vessel traffic will not be impeded. Valid 2026-03-20 to 2027-08-31. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 40-42.57N 073-59.09W Reicon will be conducting pile repair and rehabilitation operations at Pier 36, East River, New York, NY, in position 40-42.57N 073-59.09W, from February 23, 2026, to November 3, 2028, Monday through Friday, between 6:00am to 2:00pm, local time. Equipment on scene will be a dive barge, monitoring VHF-FM Ch 13 and is requesting mariners to minimize their wake, while operations are being conducted. Valid 2026-03-23 to 2028-11-04. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 40-42.35N 073-58.95W This Local Notice to Mariners (LNM) report, submitted to the U.S. Coast Guard First District, announces upcoming waterborne crane operations in support of building construction on the East River, New York. The project, managed by Grace Industries LLC, will take place at coordinates 40° 42.348'N, 073° 58.955'W, from July 20, 2026, through December 31, 2026. Operations are scheduled Monday through Saturday, 6:00 AM to 6:00 PM, with cranes and material barges present at the site. Mariners in the area are advised to use slow speed (“slowbell”) near the crane operations and may contact the operation via marine radio channels 16, 13, and 61A for coordination. Valid 2026-07-20 to 2026-12-31. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 40-41.81N 073-59.98W Trevcon Construction Company LLC submitted a Local Notice to Mariners (LNM) Information Form to the U.S. Coast Guard First District for a marine construction project in New York’s East River/New York Bay. The project, scheduled from September 28 to November 30, 2026, involves the removal of the BBP Pier 4 Marine Transfer Bridge, including steel structure removal, timber pile removal, and diver operations. Work will occur daily from 5:00 AM to 6:00 PM at the coordinates 40°41'49" N, 73°59'59" W. Equipment on site will include a crane barge, material barge, and diving equipment. Valid 2026-09-09 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 40-41.52N 074-00.77W M&J LLC will be conducting rehabilitation work at the Governors Island Pedestrian Bridge and Fender Wharf in New York. The work is scheduled to occur from August 24, 2026, through November 29, 2027, Monday through Friday from 7:30 a.m. to 3:00 p.m. The project location is listed at latitude 40° 41'31.4232" N and longitude 74° 0'46.3896" W. Equipment on scene will include an equipment barge supporting a Caterpillar 320 excavator fitted with a stone-handling attachment. The form does not list vessel radio frequencies, passing arrangements, chart numbers, or vessel movement times. Valid 2026-08-24 to 2026-11-30. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 40-48.10N 073-53.38W Mariners are advised that Trevcon Construction Company LLC will conduct existing fender system replacement work with diving operations at the Hunts Point WRRF in the East River/New York Bay, New York, from July 27, 2026, through June 30, 2027. Operations are scheduled daily from 0500 to 1800 in the vicinity of 40°48′06″N, 073°53′23″W. Applicable chart number is US5NYCFH. Equipment on scene will include a crane barge, material barge, and diving equipment. Mariners transiting the area are requested to exercise caution, proceed at safe speed, and avoid interfering with construction and diving operations. No passing arrangements or vessel movement times were provided. For additional information, contact Dan Seligmann, Trevcon Construction Company LLC, at 631-923-8530 or [email protected]. Valid 2026-09-08 to 2027-06-30. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 40-42.90N 073-58.46W MARINERS ARE ADVISED that precast erection operations for a new esplanade will be conducted on the East River between East Houston Street and East 14th Street, New York, NY, from 20 October 2026 through 30 March 2027, Monday through Friday, 6:00 a.m. to 5:00 p.m. Operations will involve a 240-foot crane barge and 175-foot material barges in the vicinity of 40-42.90N 073-58.46W. Barge placements may extend up to 40 feet into the 1,300-foot-wide federal channel. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution. For passing arrangements, contact the tug DEBORAH QUINN on VHF Channels 13 or 66. Material barges require one-hour notice; the spud barge requires 24-hour notice Valid 2026-10-13 to 2027-03-31. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 40-43.61N 073-58.29W 40-43.52N 073-58.30W 40-43.13N 073-58.40W 40-42.86N 073-58.51W 40-42.69N 073-58.60W 40-42.63N 073-58.67W 40-42.61N 073-58.86W 40-42.59N 073-58.86W 40-42.57N 073-59.05W 40-42.57N 073-59.05W 40-42.59N 073-58.87W 40-42.61N 073-58.88W 40-42.63N 073-58.67W 40-42.69N 073-58.60W 40-42.86N 073-58.52W 40-43.13N 073-58.41W 40-43.52N 073-58.31W 40-43.61N 073-58.29W 40-43.61N 073-58.29W IPCP will be conducting esplanade, bulkhead, and park reconstruction, on the East River, Montgomery St to East 14th Street, from January 2022 to December 2026, 5-7 days a week, between 6:00am to 6:00pm. Equipment on scene will be Tugboat DEBRA QUINN, Inspection Boat, 290 x 40 Mooring Barges, 250 x 62 Gantry Crane Barge, Crawler Crane Barge, 150 x 60 Deck Barges, 140 x 40 Hopper Barges All moving of vessels to occur by tugboat; vessels will be moved at all times of day and night and will be monitoring VHF-CH 13 and 66. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. Valid 2022-01-03 to 2026-12-30. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 40-44.56N 073-58.32W 40-44.56N 073-58.29W 40-44.39N 073-58.33W 40-44.40N 073-58.35W 40-44.56N 073-58.32W Phoenix Marine Co. will be conducting diver\ operations in the East River at the Marginal Wharf Platforms at The Water Club and E. 34th St. Heliport, in position 40*44’36”N-73*58’16” W through 40*44’22”N-73*58’20”W. Work will be conducted between 6:00am-2:00pm, from September 15, 2025 to July 5, 2027. Equipment on scene will be (1) crane barge, (1) material barge and (1) work platform barge monitoring VHF-CH 9. Mariners transiting the work area are urged to exercise extreme caution, travel at the slowest safe speed to minimize wake, and proceed with caution Valid 2025-09-01 to 2027-07-05. USCG Northeast District Local Notice to Mariners 45/2026 EDGARTOWN HARBOR General / Marine Events / Regatta (Race) MA – EDGARTOWN OUTER HARBOR – 103rd ANNUAL JUNIOR ONE-DESIGN – RACE/REGATTA Mariners are advised that the 103rd Annual Regatta Junior One-Design is scheduled to be held in the vicinity of Edgartown Outer Harbor. The event will take place from Tuesday July 14 through Wednesday July 15, 2026, from 8:00 a.m. to 3:30 p.m. each day. Expect up to 96 sailing vessels, 8-14 ft in length. Mariners are advised to transit the area with extreme caution. Mariners may contact the person in charge by phone at (732) 245-3443 or by Channel 72 VHF. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR BOSTON, SUBMERGED LAND ACT (SLA) - ESSEX BAY General / Hazards To Navigation / Shoaling Reported Essex Bay entrance has experienced increased shoaling from Essex Bay Buoy 3 in approximate position 42-40.40N 070-42.70W to Essex Bay Buoy 3A in approximate position 42-40.30N 070-43.30W. Mariners are advised that shoaling has been identified and extends the entire width of the channel to a least depth of 2 feet mean low water (MLW). Mariners without local knowledge are advised to transit with extreme caution and only during plus tides. Essex Bay Channel Buoy 16 has been reported having increased shoaling. Mariners are urged to use caution while transiting the area. USCG Northeast District Local Notice to Mariners 45/2026 APPROACHES TO NEW YORK NANTUCKET SHOALS TO FIVE FATHOM BANK - FIRE ISLAND INLET General / Hazards To Navigation / Shoaling Reported Location: 40-37.91N 073-18.32W 40-37.86N 073-17.81W 40-37.72N 073-17.49W 40-37.67N 073-16.66W 40-37.60N 073-16.65W 40-37.66N 073-17.57W 40-37.77N 073-17.82W 40-37.81N 073-18.32W 40-37.75N 073-19.22W 40-37.38N 073-19.42W 40-37.43N 073-19.88W 40-37.90N 073-19.29W 40-37.91N 073-18.32W NY-FIRE ISLAND INLET Shoaling has been identified in Fire Island Inlet in the area between buoys 3, 7, 13, and 15. Mariners are urged to use caution while transiting the area. Valid 2024-09-12 to 2039-11-14. USCG Northeast District Local Notice to Mariners 45/2026 FIRE ISLAND INLET General / Marine Construction (Excluding Bridges) / Dredging Great Lakes Dredge & Dock Company, LLC will be conducting dredging operations covering the Fire Island Inlet and Shores Westerly to Jones Inlet, New York Beach Erosion Control and Navigation Project. The project involves placing approximately 1.5 million cubic yards of beach fill along the Gilgo Beach shoreline, with material dredged from Fire Island Inlet and deposition basins. Work is scheduled to begin September 8, 2026, and continue through March 2027, operating 24 hours per day, seven days per week. The contractor will use the cutter suction dredge Illinois, three booster pump plants, including two on land, and submerged pipeline to hydraulically pump dredged material to the placement area. Supporting waterside equipment includes the Booster Plant Jack, Survey Vessel Cooper River, Crew Boat Saginaw River, Derrick 184, Anchor Barges 114 and 115, Fuel Barge 1003, and several tug vessels. All vessels and pipelines will be lighted in accordance with U.S. Coast Guard regulations. Marine VHF Channels 13 and 16 will be monitored continuously during operations. The submission includes coordinates for the staging area, submerged pipeline route, and borrow area associated with the dredging and beach fill work. The contractor notes that a booster is located between pipeline points ML-2 and ML-3. Mariners transiting the area are urged to exercise extreme caution due to ongoing dredging activity, submerged pipeline, vessel operations, and related construction equipment. Project contacts identified in the request are Project Manager Mike Hungerford and Site Manager Cameron Scheid. The document is marked confidential and proprietary by Great Lakes Dredge & Dock Company. Valid 2026-09-08 to 2027-03-31. USCG Northeast District Local Notice to Mariners 45/2026 EAST RIVER MAIN CHANNEL - FLUSHING BAY General / Marine Construction (Excluding Bridges) / Dredging Maintenance dredging operations are scheduled to occur from 12 October 2026 through 15 December 2026 in the vicinity of Flushing Asphalt, LLC, near 120-01 31st Avenue, Flushing, NY. Work is expected to occur daily from 6:00 a.m. to 6:00 p.m., with the potential for continuous 24-hour operations. Operations will involve a clamshell dredge, spud barge, hopper barges, pushboat, and occasional tug assistance. Mariners are advised to use caution, maintain a safe speed and wake, and contact on-scene vessels as necessary when transiting the area. Valid 2026-10-12 to 2027-01-16. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR NORTHERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - FRENCHMAN BAY General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes L Beginning May 18, 2026, and continuing until March 02, 2028, a Crane Barge along with an attendant plant will be operating at various locations in and around the Bar Harbor Breakwater located adjacent to Bald Porcupine Island and the Porcupine Dry Ledge. Materials will be delivered to this Crane Barge via Tug transit. The work zone in general extends approximately 300 feet on either the north or south sides of the existing breakwater rock structure. Mariners are urged to transit at their slowest safe speed to minimize wake and procced with caution when travelling near the work area. When construction vessels are to navigate to the Bar Harbor breakwater they shall follow a designated haul route to minimize any disruptions to local marine traffic or fishermen. Vessels shall enter the harbor on a course of 343°. Upon reaching vertex of N 264340.78, E 1069401.28 (northeast of Bald Porcupine Island) they shall alter course to a heading of 270°. They will then continue at this heading until reaching a vertex of N264340.78, E 1067401.28 where they shall set a heading of 210° and maintain this heading to enter the work zone. The work zone in general extends approximately 300 feet on either the north or south sides of the existing breakwater rock structure. Its vertices are: Northeast corner: N 262830.48, E 1066588.92, Southeast corner: N 262354.34, E 1066858.96, Northwest corner: N 261413.24, E 1064383.15, Southwest corner: N 260917.96, E 1064721.87. When leaving the work zone any vessels shall navigate the course described above with opposite headings. Should any construction vessels need to leave the work zone for safe harbor they shall exit the work zone at its northeast corner (N 262830.48, E 1066588.92) on a course heading of 0° until reaching a vertex of N 268623.87, E 1066472.54 and start a heading of 45°. A safe harbor point shall be N 269679.20, E 1067527.92 which is west of Burnt Porcupine Island. An alternate safe harbor spot shall continue on the same course until reaching vertex N 270669.19, E 1068517.87 and then alter course to heading 148° until reaching safe harbor at N 269494.97, E 1070376.68. This safer harbor location is between Burnt Porcupine Island and Long Porcupine Island, east of Rum Key. Vessels may leave this safe harbor location on a heading of 210° back into the work zone. The above described safe harbor locations may be reached in the opposite direction if chosen. The Crane Barge will not be sitting in the federally marked navigation channel while repairing the breakwater. Should any construction vessels need to leave the work zone for safe harbor they shall exit the work zone and travel across the navigation channel to a designated safe harbor point that is located west of Burnt Porcupine Island. An alternate designated safe harbor point is located between Burnt Porcupine Island and Long Porcupine Island, east of Rum Key. The crew will be working Monday through Friday during daylight hours. The Crane and attendant plant will both monitor marine VHF Channel 16. Mariners are urged to use extreme caution and transit the area at a safe speed. If you have any questions or require additional information, please contact me via e-mail at [email protected] or via telephone at (609) 364-2078. Valid 2026-05-18 to 2028-03-31. USCG Northeast District Local Notice to Mariners 45/2026 BLOCK ISLAND SOUND AND GARDINERS BAY - GARDINERS BAY SOUTH ENTRANCE General / Hazards To Navigation / Shoaling Reported NY-BLOCK ISLAND SOUND AND GARDINERS BAY-GARDINERS BAY SOUTH ENRANCE-ACABONACK HARBOR Mariners are advised that dangerous shoaling conditions exist in Acabonack Harbor and vicinity which cause dangerous conditions when transiting the channel. Acabonack Harbor Buoys 1-4 (Private aids have been temporarily discontinued until the harbor is dredged. Mariners should exercise extreme caution when navigating the channel. Valid 2024-09-12 to 2039-12-27. USCG Northeast District Local Notice to Mariners 45/2026 ROCKAWAY INLET - GERRITSEN INLET General / Bridges / Inspection Location: 40-35.16N 073-54.74W Bridge Name: Belt Pkwy Bridge From August 3, 2026 to November 30, 2026, between 9 am to 3 pm, a barge with 60’ manlift will be utilized to inspect the Belt Parkway across Hendrix Creek at mile 0. Mariners requiring full vertical and horizontal clearance can contact the contractor via marine radio VHF-FM Ch 13/16 or by calling Jaw Pawluczuk at (646) 872-2967. Mariners are advised to exercise caution and reduce wake when transiting the area. Valid 2026-07-23 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 BEACH CHANNEL - GRASS HASSOCK CHANNEL General / Marine Construction (Excluding Bridges) / Dredging Mariners are advised that coastal restoration work will be conducted in Jamaica Bay, at Sommerville Basin along the east shore, in approximate position 40-36.17N 073-47.03W, from November 9, 2026, through March 31, 2027, or sooner. The project involves installation of a stone sill to retain sand and restore tidal salt marsh habitat. Operations are expected Monday through Friday, from 7 a.m. to 3 p.m.; however, work hours may vary based on tidal conditions. Equipment on scene may include an articulating dump truck, bulldozer, front-end loader, and tracked long-reach excavator. All work will occur outside the navigation channel. Mariners are advised to exercise caution when transiting the area. 40-36.17N 073-47.03W Location: 40-36.17N 073-47.03W Valid 2026-11-09 to 2027-04-01. USCG Northeast District Local Notice to Mariners 45/2026 GREAT KILLS HARBOR General / Bridges Location: 40-34.61N 074-11.43W Bridge Name: W Shore Expwy Bridges From October 19, 2026 through December 30, 2026, between 9:00 a.m. and 3:00 p.m., contractors will be utilizing a barge with a 60’ manlift under the West Shore 440 Highway Bridge over Fresh Kills at mile 0.4 to perform bridge inspection. The barge will be moved out of the navigable channel after work hours or when not in use. Mariners requiring full clearance can contact the contractor via marine radio VHF-FM Ch. 13/16 or call Rajesh Subedi at (929) 471-3140. Mariners are advised to exercise caution when transiting the area. Valid 2026-10-13 to 2026-12-31. USCG Northeast District Local Notice to Mariners 45/2026 RARITAN BAY - GREAT KILLS HARBOR General / Hazards To Navigation / Shoaling Reported Location: 40-31.99N 074-08.44W 40-31.79N 074-08.38W 40-31.77N 074-08.45W 40-31.98N 074-08.52W 40-31.99N 074-08.44W NY-GREAT KILLS HARBOR Shoaling has been reported in in the vicinity of Great Kills Harbor, between buoys 6 and 8. Mariners are advised to proceed with caution while transiting the area. Valid 2024-09-12 to 2039-10-27. USCG Northeast District Local Notice to Mariners 45/2026 WEST CHANNEL - GREAT SOUTH BAY General / Marine Construction (Excluding Bridges) / Dredging Location: 40-38.53N 073-15.27W Captree State Park Boat Basin: Beginning October 26, 2026, through December 31, 2026, cutter-suction dredging operations will be conducted within Captree State Park Boat Basin, centered at approximately 40°38'31.9"N, 073°15'16.5"W. Operations will occur seven days per week, up to 12 hours per day. Equipment on scene will include the dredges GREAT GUN and LIL DRAGON, a 30-foot by 80-foot excavator barge, the tug UNCLE BILL, and an unnamed skiff. Mariners are urged to transit the area with caution, reduce speed, and avoid creating wake. Dredging vessels can be contacted on VHF-FM Channels 16 and 65. Mariners requiring passage should provide at least 30 minutes advance notice to allow dredging equipment to move and avoid impeding navigation. On-scene contact: Matt Grant, (516) 315-4917. Valid 2026-10-26 to 2027-01-01. USCG Northeast District Local Notice to Mariners 45/2026 NEWARK BAY - HACKENSACK RIVER General / Bridges / Rehabilitation Location: 40-49.37N 074-02.07W Bridge Name: Westerly Hackensack River Bridge Replacement of Two Waterway Piers and Bridge Washing – Installation of temporary trestle at the New Jersey Turnpike Bridge across the Hackensack River at mile 11.8 will commence on July 1, 2024. Hours of operation are from 6 am to 4 pm. 6 Shugart sectional barges will be installed at piers 15 and 18 outside navigation channel. A barge will be operating in the navigation channel for bridge washing during month of January in 2026, 2027 and 2028 (tentative). Mariners requiring full horizontal clearance can contact Albert Parker via marine radio VHF-FM Ch 13/16 or 215-495-2140. Mariners are advised to exercise caution when transiting the area. This project is to be completed by January 20, 2028. Valid 2024-09-25 to 2028-01-20. USCG Northeast District Local Notice to Mariners 45/2026 NEWARK BAY - HACKENSACK RIVER General / Bridges / Modification Location: 40-48.00N 074-04.55W Bridge Name: Berry's Creek Canal New Jersey Turnpike Bridge Bridge Replacement – Installation of temporary trestle to the New Jersey Turnpike Bridge (W112.72B) over Berry’s Creek Canal at mile .05 will commence on or about December 16, 2024. Hours of operation are from 6 a.m. to 4 p.m. weekdays. There will be a safety boat operating IVO the bridge. A 84ft navigation channel free of obstruction will be maintained at all times. For construction details please contact Jed Fitz, superintendent at 267-907-5932 or via marine radio VHF-FM 13/16. This project is to be completed by February 8, 2027. Mariners are advised to exercise caution when transiting the area. Valid 2024-12-10 to 2027-02-08. USCG Northeast District Local Notice to Mariners 45/2026 NEWARK BAY - HACKENSACK RIVER General / Bridges / Construction Location: 40-45.21N 074-05.71W Bridge Name: Portal (N) Bridge Portal (N) Bridge Bridge replacement to the Portal Bridge North, across Hackensack River at mile 5.04 is in progress. The Portal North Bridge will be inoperable starting Friday October 9, 2026.and the vertical clearance will remain at 23 feet until demolition is completed. The anticipated completion of the Portal North Swing Bridge demolition is tentatively scheduled for January 29, 2027 at which time the vertical clearance will increase to 50 feet. Until that time, hours of operations are from Monday to Friday between 6:30 a.m. to midnight. There will be waterborne equipment blocking one draw of a swing bridge at a time and the other draw will be free and clear of any equipment for the passage of vessels. Mariners can contact one of the three (3) provided telephone numbers/emails or via marine radio VHF-FM CH 13/16 advising of travel through the channel (including possible return trips): 1. Martir Ortez – Main Span Project Manager – (562) 307- 4916, [email protected] 2.Ryan Hirce – General Superintendent – (929) 639- 0039, [email protected] 3. Jim Hummel – Main Span Area Lead - (917) 417- 4885, [email protected] Skanska Traylor PNB JV has been awarded the construction of the New Portal North Bridge Project (NJT Contract No. 20-083X, WBS No. GC.02) with a Notice to Proceed of April 7, 2022. Specific to the Hackensack River work, mile 5.0, the project consists of constructing two bridge piers, demolition of the existing center pier north fender, erecting three tied-arch spans of approximately 400 LF (1,200 LF overall), and demolition of the existing bridge once railroad traffic is switched to the new bridge. The current status of the channels: East Channel – Open West Channel – Closed. The Coast Guard is modifying the operating schedule that governs the Amtrak Portal Bridge across the Hackensack River, mile 5.0, at Little Snake Hill, New Jersey. This action is necessary to facilitate the construction of the new replacement Portal Bridge North, as designed by Amtrak as the owner of the bridge, adjacent to the current Amtrak Portal Bridge. This final rulemaking limits the extent of the opening of the Amtrak Portal Bridge in the horizontal position to prevent the swing span from striking the new Portal Bridge North during construction as follows: The draw shall only open to 55 feet horizontal clearance in the east channel and the west channel will be closed to all navigation while the draw is open. Whenever any bridge opening is needed, contact one of the three (3) provided telephone numbers/emails above with 24-hour advance notice to allow the removal of any waterborne equipment from the East Channel that restricts the horizontal clearance to less than 55 feet. The draw need not open for the passage of vessel traffic from 5 a.m. to 10 a.m. and from 3 p.m. to 8 p.m. Additional bridge openings shall be provided for tide restricted commercial vessels between 7 a.m. and 8 a.m. and between 5 p.m. and 6 p.m., if at least a two-hour advance notice is given by calling the number posted at the bridge. At all other times the bridge shall open on signal if at least a 2-hour advance notice is given. Please be advised that the existing Portal Bridge east channel horizontal clearance (temporary fender) will be maintained at approx. 55ft and west channel horizontal clearance at 91ft until it’s demolished, both with a closed swing bridge vertical clearance of 23ft. With a swing bridge opening, the vertical clearance increases to 50ft with the existing Portal Bridge east channel horizontal clearance (temporary fender) being maintained at approx. 55ft and west channel being closed. Mariners are advised to exercise caution when transiting the area. This project will be completed by October 22, 2027. Valid 2024-05-24 to 2027-10-22. USCG Northeast District Local Notice to Mariners 45/2026 NEWARK BAY - HACKENSACK RIVER General / Bridges / Maintenance Location: 40-50.38N 074-01.13W Bridge Name: New Jersey Interstate 95 Turnpike Northbound Bridge On February 16, 2026, between 7:00 am and 3:30 pm on weekdays, in-water bridge maintenance will be performed on the New Jersey Turnpike (117.6 NO) IVO Pier One Overpeck Creek, mile .73 in Ridgefield, Bergen County, New Jersey. This work will be completed in three non-consecutive weeks. A 15 ft skiff and a 60 ft X 160 ft platform will be in the waterway intermittently. Mariners requiring full horizontal clearance can contact Matt Becker at (201) 304-3045. The project is to be completed by December 31, 2026. Mariners are advised to exercise caution when transiting the area. Valid 2026-01-30 to 2027-01-02. USCG Northeast District Local Notice to Mariners 45/2026 NEWARK BAY - HACKENSACK RIVER General / Bridges / Maintenance Location: 40-47.26N 074-05.41W On February 16, 2026, between 7:00 am and 3:30 pm on weekdays and weekends, bridge maintenance will be performed on the New Jersey Turnpike (W111.48) over Berry Creek Canal, mile .1 in Lyndhurst, Bergen County, New Jersey. This work will be completed in 3 stages in approximately 3 non-consecutive weeks. A 15 ft skiff and a 60 ft X 160 ft platform will be in the water intermittently. Mariners requiring full horizontal clearance can contact Matt Becker at (201) 304-3045. The project is to be completed by December 31, 2026. Mariners are advised to exercise caution when transiting the area. Bridge Name: W111.48 NJ Interstate 95 Turnpike Bridge Valid 2026-02-12 to 2027-01-01. USCG Northeast District Local Notice to Mariners 45/2026 NEWARK BAY - HACKENSACK RIVER General / Bridges / Maintenance Location: 40-50.38N 074-01.13W On February 16, 2026, between 7:00 am and 3:30 pm on weekdays, in-water bridge maintenance will be performed on the New Jersey Turnpike (117.6) IVO Piers three and six over Overpeck Creek, mile .68 in Ridgefield, Bergen County, New Jersey. This work will be completed in three non-consecutive weeks. A 15 ft skiff and a 60 ft X 160 ft platform will be in the waterway intermittently. Mariners requiring full horizontal clearance can contact Matt Becker at (201) 304-3045. The project is to be completed by December 31, 2026. Mariners are advised to exercise caution when transiting the area. Bridge Name: 117 16 Interstate 95 Expressway Northbound Bridge Valid 2026-02-12 to 2027-01-01. USCG Northeast District Local Notice to Mariners 45/2026 NEWARK BAY - HACKENSACK RIVER General / Bridges / Maintenance Location: 40-49.39N 074-02.06W Bridge Name: Structure W115 36 Interstate 95 Highway Northbound Bridge On February 16, 2026, between 7:00 a.m. and 3:30 p.m. on weekdays, bridge maintenance will be performed om the deck, parapet, sidewalk and curb on Structure W115.36 Interstate 95 highway Southbound Bridge New Jersey Turnpike over the Hackensack River, mile 11.8 in Ridgefield, Bergen County, New Jersey. This work will be completed in 5 non-consecutive days. A 15 ft skiff and a 60 ft X 160 ft platform will be in the waterway intermittently. Mariners requiring full horizontal clearance can contact Matt Becker at (201) 304-3045. The project is to be completed by December 31, 2026. Mariners are advised to exercise caution when transiting the area. Valid 2026-02-13 to 2027-01-01. USCG Northeast District Local Notice to Mariners 45/2026 HACKENSACK RIVER General / Bridges Location: 40-45.21N 074-05.73W Bridge Name: Amtrak Portal Bridge Demolition of the Amtrak Portal Drawbridge across Hackensack River at mile 5.0 will commence on October 9, 2026. To accommodate the demolition of the drawbridge superstructure, the Coast Guard has issued a temporary deviation from the regulation governing the operation of the moveable bridge. Under this temporary deviation, the bridge may remain in the closed position from October 9, 2026, until superstructure demolition over the navigable channel is complete on or about January 29, 2027. Mariners are also advised that a full channel closure in the vicinity of the bridge will take effect from approximately November 17, 2026, through January 29, 2027. Channel closure dates will be updated as demolition activities progress. Vessels that can make passage without a bridge opening request may do so until channel closures take effect. Mariners are advised to exercise caution and reduce wake when transiting the area. Valid 2026-10-08 to 2027-01-29. USCG Northeast District Local Notice to Mariners 45/2026 HACKENSACK RIVER General / Bridges T00:00:00.000Z To: 2027-02-27T00:00:00.000Z Location: 40-44.44N 074-04.88W Bridge Name: Rt 7 Witt Penn Bridge From November 30, 2026 to February 27, 2027, between 7:00 am to 3:00 pm weekdays, a crane barge with manlift will be utilized within the navigable channel adjacent to the fenders around Piers 1 E and 1 W of the Witt Penn (Route 7) Bridge, mile 3.1, across the Hackensack River. Access to the work area will constitute 50% of the channel width. Mariners requiring full horizontal clearance can contact the contractor via marine radio VHF-FM Ch 13/16 or by calling (201) 675-1553 or (609) 694-5938. A 4 hour notice is required for transit. Mariners are advised to exercise caution and reduce wake when transiting the area. Valid 2026-10-29 until further notice. USCG Northeast District Local Notice to Mariners 45/2026 HAMPTON HARBOR General / Bridges Construction of the replacement State Route 1A Bridge across Hampton Harbor NH is ongoing. Vessel traffic continues to be restricted to the center span of the bridge due to work trestles placed in both side channels. Channel closures associated with the demolition of the existing bascule structure are complete. Additional closures for installation of cofferdams may be scheduled for the end of November. Requests for additional information regarding these channel closures can be directed to the project manager at (978) 270-8653. Mariners are advised to exercise caution and reduce wake when transiting this area. Position 42-53.77N 070-49.02W USCG Northeast District Local Notice to Mariners 45/2026 SECTOR NORTHERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - HAMPTON HARBOR General / LAA / RNA / Temporary Regulated Navigation Zone The Coast Guard is establishing a temporary regulated navigation area (RNA) and a safety zone on the Hampton River at the inlet to Hampton Harbor, Hampton, NH, in response to hazardous conditions created by construction activities for the Neil R. Underwood Seabrook-Hampton Harbor Bridge replacement project. This rule is necessary to provide for the safety of life in the areas undergoing demolition and construction. The RNA will be enforced from July 1, 2025, through December 31, 2030, and will establish the following operating restrictions on vessels: Nothing in this regulation relieves any vessel, owner, operator, charterer, master, or person directing the movement of a vessel, from the consequences of any neglect to comply with this part or any other applicable law or regulation (i.e. the International Regulations for Prevention of Collisions at Sea, 1972 (72 COLREGS) or 33 CFR part 84—Subchapter E, Inland Navigation Rules) or of the neglect of any precaution which may be required by the ordinary practice of seamen, or by the special circumstances of the case. Entry and movement within the RNA is subject to a “Slow-No Wake” speed limit. All vessels may not produce a wake and may not attain speeds greater than five (5) knots unless a higher minimum speed is necessary to maintain bare steerageway. Any vessel transiting through the RNA must make a direct passage. No vessel may stop, fish, moor, anchor, or loiter within the RNA at any time. Vessels may not pass (overtake) another vessel within the RNA. Only one vessel is permitted to pass through the center span navigational channel at any given time. Except when transiting through the center span navigation channel, no vessel or craft may operate within 20 feet of the bridge(s). The operator of any vessel transiting in the RNA must comply with all lawful directions given to them by the COTP or the COTP's on-scene representative. viii) One-way traffic will flow northbound between the eastern side of the shallow waters and the Seabrook-Hampton Harbor Bridge. The northern side of the shallow area will accommodate one-way traffic moving west. The Safety Zone, includes all navigable waters within a 50-yard radius of the center point of the bridge, will be effective from July 1, 2025, through Decmember 31, 2030, but will only be enforced during active construction within the main span navigational channel or other instances which may cause a hazard to navigation as determined by the COTP. The COTP will make notification of the exact dates and times in advance of each closure period of the safety zone to the local maritime community through the Local Notice to Mariners and will issue a Broadcast Notice to Mariners via marine channel 16 (VHF-FM) as soon as practicable in response to an emergency. The complete rulemaking is available under Federal Register docket number USCG-2025-0389 and can be accessed through the federal portal at https://www.regulations.gov/document/USCG-2025-0389-0001 We invite your comments on this rulemaking. To submit your comment online, go to https://www.regulations.gov, and insert “USCG-2025-0389” in the “search box”. Click “Search” and then click “Comment.” We will consider all comments received on or before October 6, 2025. If the project is completed before December 31, 2030, enforcement of the safety zones will be suspended, and notice given via Local Notice to Mariners. The First Coast Guard District Local Notice to Mariners can be found at: https://www.navcen.uscg.gov/msi. For questions regarding this Marine Safety Information Bulletin contact Mr. Craig Lapiejko, Waterways Management at First Coast Guard District, telephone (571) 607-6314, e-mail: [email protected]. Matthew B. Stuck, First Coast Guard District Chief of Waterways Management, sends Valid 2025-07-08 to 2030-12-31. USCG Northeast District Local Notice to Mariners 45/2026 BUZZARDS BAY MAIN CHANNEL - HOG ISLAND CHANNEL General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 41-44.26N 070-37.51W 41-44.25N 070-37.47W 41-44.24N 070-37.50W 41-44.25N 070-37.53W 41-44.26N 070-37.51W ACK Marine will be conducting dive operations for fender repairs on the Mass Maritime Academy Pier. Request reduced speed when operating in the area. Valid 2026-11-13 to 2026-11-17. USCG Northeast District Local Notice to Mariners 45/2026 LONG ISLAND SOUND EASTERN PART - HOUSATONIC RIVER General / Bridges / Repairs, Painting, Or Fender Replacement Location: 41-12.32N 073-06.58W Bridge Name: Devon Railroad Bridge CONNECTICUT – HOUSATONIC RIVER – Bridge Repairs – Beginning July 20, 2026, Connecticut Department of Transportation will be performing interim repairs on the Devon Bridge across Housatonic River at mile 3.9. Contractor will be utilizing a barge in the navigational channel that will reduce the horizontal clearance to 41’-6” as well as installing a platform under the bridge outside of the navigational channel that will reduce the vertical clearance. Work is expected to be completed in December 2027. Mariners with any questions can contact the contractor via marine radio VHF-FM Ch 13/16 or call CTDOT Environmental Coordinator Brian Brinsmade at (203) 389-3173. Mariners are advised to exercise caution and reduce wake when transiting the area. Valid 2026-07-01 to 2027-12-31. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - HUDSON RIVER General / Bridges / Rehabilitation Location: 42-30.56N 073-46.39W Bridge Name: Castleton Highway Bridge Bridge Rehabilitation – Construction to the Castleton Highway Bridge across Hudson River at mile 135.7 is extended from June 30, 2026 to June 30, 2027. Hours of operation are from 7 a.m. and 7 p.m. Temporary safe span platforms will be installed under the tram rail steel (over navigation channel) which will reduce vertical clearance by approximately 6 feet. A minimum of 210 feet east side and the west side of the navigation channel will be cleared of obstruction at all times for safe passage of vessels. In addition, 25 feet of buffer will be maintained on each side of the channel marker. A safety boat will be operated IVO the bridge. Hot work will be performed during construction. Note: The contractor will remove the SafeSpan over the navigation channel starting Monday, October 19, 2026. Vessels with air drafts over 115 feet are requested to provide 1-2 hour advance notice prior to transiting under the bridge so the contractor can pull equipment tight to the structure. Mariners requiring full horizontal clearance can contact the contractor/operator via marine radio VHF-FM CH 13 or call 518-857-9215. For all construction related questions, please contact Tim Mastro at 518-337-7231. This project is to be completed by June 30, 2027. Mariners are advised to exercise caution when transiting the area. Valid 2024-09-03 to 2027-06-30. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - HUDSON RIVER General / Bridges / Rehabilitation Location: 40-51.09N 073-57.13W Bridge Name: George Washington Bridge Rehabilitation of Lower Level Structural Steel, Painting and Replacement of Maintenance Travelers – Construction to the rehabilitation at the George Washington Bridge across the Hudson River at mile 11.0 will commence on May 1, 2024. Temporary work platform will be installed under the entire length of the bridge. The temporary work platform will reduce the vertical clearance by 3ft 9in plus 2ft sag max. below the low steel. Welding (hot work) may be performed during working hours. A 26 ft safety boat will be operating in the vicinity of the bridge. Mariners requiring full horizontal clearance can contact Michael Androsiglio 914-447-7513 or via marine radio. The resident engineer or contractor will be equipped with a VHF-FM marine radio and will be monitoring Channel 13/16 during hours of operation. Mariners can contact Marc Helman at 212-435-6112 or 551-220-8853 or Henry Chiang at 201-346-8921 for construction details. This project is to be completed by December 31, 2029. Mariners are advised to exercise extreme caution when transiting the area. Valid 2024-05-01 to 2029-12-31. USCG Northeast District Local Notice to Mariners 45/2026 General / Bridges / Closure (Scheduled Or Emergency) The Broadway Bridge at mile 6.8 in the Harlem River is unable to open for marine traffic until further notice, due to ongoing rehabilitation of its electrical and mechanical systems. The vertical clearance of the bridge in the closed position is 24 feet above MHW. Vessels that under the bridge in the closed position may do so at any time. Mariners are advised to use caution when transiting the area. Position 40-52.42N 073-54.67W USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - HUDSON RIVER General / Bridges / Construction Cable anchorage retrofits of the Governor Mario M. Cuomo Bridge across the Hudson River at mile 27.0 will commence on March 15, 2026. Temporary work platform will be installed in four locations underneath the bridge. The temporary work platform will extend 6 feet beneath the deck girders but remain above the traveler handrails, not impacting the vertical clearance of the bridge. Welding (hot work) may be performed during working hours. Work hours are 7:00 a.m. to 5:30 p.m. Monday through Friday. A safety boat will be operating in the vicinity of the bridge. The resident engineer or contractor will be equipped with a VHF-FM marine radio and will be monitoring Channel 13/16 during hours of operation. Mariners can contact Phillip Mirabella at 732-306-4135 or Rafik Moawad at 848-235-1281 for construction details. This project is scheduled to be completed by September 27, 2027. Mariners are advised to exercise caution when transiting the area. Position 41-04.22N 073-54.45W USCG Northeast District Local Notice to Mariners 45/2026 HUDSON RIVER General / Bridges Construction and demolition of the Livingston Avenue Railroad Bridge over the Hudson River at mile 146.2 between Albany and Rensselaer commenced on 18 August 2025. Work hours are Monday through Saturday between 6a.m. and 6 p.m. through December 31, 2026. There will be a safety boat operating IVO the bridge. As part of the tower construction for the bridge, there will be a full channel closure in the Regulated Navigation Area at the construction site from 7:00 a.m. to 4:00 p.m. on Saturday, October 17, 2026. From December 14, 2026 through the end of January 2027, barge placement for construction of the tower will reduce the width of the east navigation channel at the bridge to 84.4 feet. Mariners requiring full horizontal clearance in this channel should call 347 924-5635 24-hours in advance of their transit to coordinate barge movement. For construction details please contact Jack Phillips at 347 924-5635 or via marine radio VHF-FM 13/16. Mariners are advised to exercise caution when transiting the area. Position 42-39.30N 073-44.43W USCG Northeast District Local Notice to Mariners 45/2026 HUDSON RIVER General / Bridges T00:00:00.000Z To: 2027-08-02T00:00:00.000Z Location: 42-43.73N 073-41.83W Bridge Name: Congress St Bridge From October 23, 2026 through August 1st, 2027, between 7:00 a.m. and 3:30 p.m., a contractor will be performing repairs of the Congress Street Bridge across Hudson River at mile 152.2 between the Cities of Watervliet and Troy, New York. The contractor will be utilizing a 100' x 40' barge for the repairs. The barge will be parked up against the pier protection of the pier and moved from one side of the pier to the next via tugboat as the work schedule progresses. Scaffolding will be erected 48’ above mean high water level around the tops of the piers, within the footprint of the pier protection. Mariners requiring full horizontal or vertical clearance can contact the contractor via marine radio VHF-FM Ch 13/16 or by calling (518) 974-5229 or (518) 858-8503. Mariners are advised to exercise caution and reduce wake when transiting the area. Valid 2026-10-05 until further notice. USCG Northeast District Local Notice to Mariners 45/2026 HUDSON RIVER General / Bridges Location: 41-19.20N 073-58.99W Bridge Name: Bear Mountain Bridge From November 2, 2026, to October 1, 2029, between 7:00 am to 3:30 pm weekdays, a deck replacement of the Bear Mountain Bridge across the Hudson River at mile 46.7, will be underway. There will be no reduction in the vertical or horizontal clearance of the bridge. The contractor will be utilizing a safety boat (Registration NY1880MC) underneath the bridge during the installation of a work platform from November through December 2026. For further information regarding this project, the contractor can be contacted via marine radio VHF-FM Ch 13/16 or by calling (646) 523-9875 or (631) 968-6030. Mariners are advised to exercise caution and reduce wake when transiting the area. Valid 2026-11-04 to 2029-10-01. USCG Northeast District Local Notice to Mariners 45/2026 HUDSON RIVER General / Bridges Location: 42-30.50N 073-46.46W Bridge Name: Alfred Smith Memorial Bridge CSX Railroad Bridge The navigational lights are not active on the CSX Alfred H. Smith Memorial Bridge, AKN Castleton Bridge, across the Hudson River, mile 135.8, between Selkirk and Castleton-on-the-Hudson, New York. CSX is obtaining parts. Estimated repair time is unknown at this time. Mariners are advised to proceed with caution and reduce wake. Valid 2026-11-10 to 2026-11-13. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - HUDSON RIVER General / Hazards To Navigation / Shoaling Reported Location: 42-04.33N 073-55.76W 42-04.26N 073-55.75W 42-04.28N 073-55.83W 42-04.32N 073-55.80W 42-04.33N 073-55.76W NY-HUDSON RIVER-CATSKILL CREEK-ESOPUS CREEK-ROUNDOUT CREEK Significant shoaling has been reported at the mouth of Catskill Creek, that may impact commercial traffic, along the southern portion of the channel. In Esopus Creek, shoaling has occurred faster than anticipated at the mouth of the creek when passing between Saugerties Lighthouse and Hudson River Lighted Buoy 93. In Roundout Creek, there is shoaling at the mouth of the creek. Mariners should exercise caution when navigating these areas. Valid 2024-09-12 to 2039-12-01. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - HUDSON RIVER General / LAA / RNA / Safety Zone General/LAA/RNA/Safety Zone § 165.T01-0336 Safety Zone; Hudson River, Manhattan, NY (a) Location. The following area is a safety zone: All waters of the Hudson River from surface to bottom, encompassed by a line connecting the following points beginning at 40°45′20.32″ N, 074°00′23.84″ W; thence to 40°45′23.34″ N, 074°00′30.60″ W; thence to 40°45′24.03″ N, 074°00′40.85″ W; thence to 40°45′18.89″ N, 074°00′48.18″ W; thence to 40°45′13.80″ N, 074°00′48.64" W; thence to 40°45′08.03″ N, 074°00′46.44″ W; thence to 40°45′07.51″ N, 074°00′37.61″W; thence to 40°45′09.18″ N, 074°00′36.37″ W; thence to 40°45′06.70″ N, 074°00′30.78″W; thence returning along the Manhattan shoreline to the beginning point. These coordinates are based on the World Geodetic System (WGS 84) / North American Datum 83 (NAD 83). (b) Definitions. As used in this section, designated representative means a Coast Guard Patrol Commander, including a Coast Guard coxswain, petty officer, or other officer operating a Coast Guard vessel and a Federal, State, and local officer with law enforcement authority designated by or assisting the Captain of the Port New York (COTP) in the enforcement of the safety zone. (c) Regulations. (1) Under the general safety zone regulations in subpart C of this part, you may not enter the safety zone described in paragraph (a) of this section unless authorized by the COTP or the COTP's designated representative. (2) To seek permission to enter, contact the COTP or the COTP’s representative on VHF-FM channel 16 or by telephone at (718) 354-4353. Those in the safety zone must comply with all lawful orders or directions given to them by the COTP or the COTP’s designated representative. (3) Hudson River Community Sailing Vessels and Human Powered Vessels transiting directly to or from the Pier 66 area may transit through the southern area of the safety zone to the east of the Hudson River Cofferdam Lighted Hazard Buoy D (LLNR 37663.3) unless otherwise directed by the COTP or the COTPs designated representative. (d) Enforcement period. This section will be subject to enforcement from 12:01 a.m. on May 1, 2026, to 11:59 p.m. on January 20, 2029. If the project is completed before January 20, 2029, enforcement of the safety zone will be suspended, and notice given via Local Notice to Mariners. The Coast Guard Northeast District Local Notice to Mariners can be found at: https://www.navcen.uscg.gov/maritime-safety-information. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - HUDSON RIVER General / LAA / RNA / Safety Zone Location: HYDE PARK, NY - HUDSON RIVER – FIREWORKS SAFETY ZONE Mariners are advised that a safety zone will be enforced for a barge-based fireworks display, scheduled to be held on the Hudson River near the Culinary Institute of America in Hyde Park, NY on September 7, 2026 from 8:00p.m. until 10:00p.m with a rain date of September 9, 2026. The fireworks barge will be in approximate position 41° 44’ 39.49” N, 73° 56’ 17.09” W and the Safety Zone encompass all waters within a 450-foot radius from the barge. Vessels may not enter, remain in, or transit through the Safety Zone during the enforcement period unless authorized by the Coast Guard Captain of the Port. Other Federal, State and local agencies may assist these personnel in the enforcement of the Safety Zone. Valid 2026-09-07 to 2026-09-07. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - HUDSON RIVER General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 40-46.24N 073-59.90W Reicon Group, LLC will be conducting pile repairs at Pier 94 from June 16, 2025, to June 25, 2027, Monday through Friday, between 7:00am to 3:30pm. Equipment on scene will be the RTC 330, monitoring VHF-FM CH 13 and will require a 24-hour notice for all vessel movement requests. Valid 2025-06-16 to 2027-06-25. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - HUDSON RIVER General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 41-59.02N 073-57.11W Bank Stabilization operations will be conducted north of the Kingston Rhinecliff Bridge off the west side of the Hudson River in position 41-59.02N 073-57.16W, from February 17, 2026, to January 28, 2031. Work will be conducted withing the Town of Ulster allowable work hours between 7:00 am to 10:00 pm. Equipment on scene will be, Long reach excavators from upland at first and possibly on a barge if necessary. All work will be within the existing cove. The work will be within the existing cove off the Hudson River and will not interfere with the channel. The installation of a 44-foot by 8-foot floating pier, attached to a bulkhead by a 36-foot by 4-foot gangway. Three (3) finger piers, approximately 36-feet by 6-feet each, will extend from the main floating pier. The entire pier assembly will be held in place by five (5) plastic, 16-inch-diameter piles, each installed by vibratory hammer. The dredging of a total of approximately 1,429 cubic yards of material, over an area of approximately 12,500 square feet. All dredged material will be disposed of within a contained upland disposal area on the property. Valid 2026-02-17 to 2031-01-29. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - HUDSON RIVER General / Marine Construction (Excluding Bridges) / Dredging Location: 42-29.02N 073-47.25W Carver Companies will conduct maintenance dredging operations at the Port of Coeymans on the Hudson River, New York, at approximate position 42°29'01.45"N, 073°47'14.78"W (42-29.02N 073-47.25W). Operations are scheduled to begin September 1, 2026, and continue through December 31, 2027, operating 24 hours per day, 7 days per week. Vessels may contact the operation on VHF-FM channels 13 and 81A. Mariners should contact the tending tug CMT PIKE via VHF for passing arrangements and coordination to avoid impeding navigation. Valid 2026-08-28 to 2027-12-31. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - HUDSON RIVER General / Marine Construction (Excluding Bridges) / Dredging To: 2027-10-02 Location: 40-42.77N 074-01.04W Trevcon Construction Co. LLC will conduct dredging operations at North Cove Marina, Hudson River, New York, in approximate position 40° 42' 46.4004" N, 074° 01' 02.15119" W, from October 1, 2026, through October 1, 2027. Work is scheduled daily from 5:00 a.m. to 7:00 p.m., with certain operations occurring 24 hours per day, 7 days per week. Equipment on scene will include a work skiff, float stage, divers, one 155-foot by 50-foot barge, and one 150-foot by 37-foot hopper barge. Vessels and barges will be moved by work boat or tugboat at all times of day and night as needed. The marina is closed to the public, and no public access is permitted except for authorized personnel. Mariners are advised to use caution when transiting the area and contact the work vessels on VHF-FM channels 13, 16, and 65 through 75. Valid 2026-10-01 until further notice. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - HUDSON RIVER General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 40-42.73N 074-01.08W Trevcon Construction Co. LLC will conduct marine construction operations at Reach 06, Hudson River, New York, in the vicinity of 375 South End Avenue, Battery Park City, Manhattan, from October 1, 2026, through July 31, 2029. Work will include removal of existing structures, installation of O-pile wall, installation of steel pipe pile, jet grouting, dredging, precast installation, and installation of a concrete deck. Operations are scheduled from 5:00 a.m. to 7:00 p.m., with certain operations occurring 24 hours per day, 7 days per week. Equipment on scene will include two 180-foot by 60-foot barges, two 140-foot by 50-foot barges, and two 90-foot by 30-foot barges. All vessel movements will be conducted by tugboat and may occur at any time of day or night. Mariners are advised to use caution when transiting the area and contact the work vessels on VHF-FM channels 13, 16, and 65 through 75. Valid 2026-10-01 to 2029-08-01. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - HUDSON RIVER General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 40-43.11N 074-00.83W Trevcon Construction Co. LLC will conduct marine construction operations at Reach 02, Hudson River, New York, in the vicinity of 345 Chambers Street, Battery Park City, Manhattan, in approximate position 40° 43' 06.6" N, 074° 00' 49.8" W, from October 1, 2026, through July 31, 2029. Work will include removal of existing structures, installation of O-pile wall, installation of steel pipe pile, jet grouting, dredging, precast installation, and installation of a concrete deck. Operations are scheduled from 5:00 a.m. to 7:00 p.m., with certain operations occurring 24 hours per day, 7 days per week. Equipment on scene will include two 180-foot by 60-foot barges, two 140-foot by 50-foot barges, two 90-foot by 30-foot barges, and one 150-foot by 37-foot hopper barge. All vessel movements will be conducted by tugboat and may occur at any time of day or night. Mariners are advised to use caution when transiting the area and contact the work vessels on VHF-FM channels 13, 16, and 65 through 75. Valid 2026-10-01 to 2029-08-01. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - HUDSON RIVER General / Marine Construction (Excluding Bridges) / Dredging Location: 42-37.00N 073-45.46W • Mariners are advised that maintenance dredging will be conducted at the Sprague Energy fuel terminal within the Port of Rensselaer, on the east side of the Hudson River Federal Navigation Channel near river mile 142, from November 9 through December 31, 2026. Operations will occur Monday through Saturday from 6 a.m. to 6 p.m. A sectional excavator mounted on a spud barge, hopper barges, tugboats Sunfish and Marion B, and workboats will be on scene. A lighted turbidity curtain marked with spar buoys will be deployed around the in-water work area. Dredged material will be transported approximately one mile upriver to the Port of Rensselaer scrap dock for unloading. The dredge barge will be spudded outside the channel when not actively dredging. Vessel traffic may pass safely through the federal navigation channel; mariners are requested to use caution, transit at a safe speed, and contact the contractor on VHF-FM Channels 13 or 16 or by telephone at 518-451-0961 for passing arrangements. Valid 2026-11-09 to 2027-01-01. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - HUDSON RIVER General / Marine Construction (Excluding Bridges) / Dredging Location: 41-37.37N 073-56.94W Tilcon New York, Inc. will conduct maintenance dredging at the Tilcon Clinton Point Quarry, Sheafe Road, Poughkeepsie, NY 12601, in the Hudson River near latitude 41°37'27.0" N, longitude 73°56'34.1" W. Work is anticipated to occur from November 16 through November 23, 2026, 24 hours a day, seven days a week. Operations will involve a barge-mounted crane equipped with an environmental clamshell bucket and one additional tugboat, in addition to tugboats that normally operate at the facility. Maintenance dredging, to a depth of 16 feet below mean low water, will remove up to 9,000 cubic yards of sediment from five berths: North Stiff Leg, Main Dock, South Stiff Leg, Light Tow Area, and South Dock. Dredged material will be processed and reused on site. The project is within the regulatory dredging window of September 1 through December 1. Mariners are advised to use caution when transiting the area. The dredging vessel will monitor VHF-FM Channel 16 and will coordinate passing arrangements as necessary to avoid impeding navigation. Valid 2026-11-16 to 2026-11-24. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - HUDSON RIVER General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes From November 24, 2024, through January 20, 2027, Weeks Marine and Frontier-Kemper Tutor Perini JV will conduct marine construction in the Hudson River on behalf of the Hudson Tunnel Project. The construction area is bounded by the following positions off the Manhattan bulkhead: 40-45.34N 074-00.40W; 40-45.31N 074-00.80W; 40-45.23N 074-00.81W; 40-45-12.40N. 074-00-28.47W. The USCG has established a Safety Zone, 33 CFR 165.T01-0336 Safety Zone; Hudson River, Manhattan, NY. Mariners transiting west of the safety zone should proceed at a speed to minimize potential wake or surge damage to the vessels working the construction area. There are two distinct jobsites within the construction area. The first jobsite, which is operated by Weeks Marine, is west of Pier 66. Within this jobsite, Weeks Marine is conducting soil mixing within a 110’ wide x 600’ long cofferdam for the Hudson River Ground Stabilization (HRGS) Project. Work hours are approximately 7AM – 7PM, Monday through Friday, and 7AM – 3PM, Saturday. The cofferdam is marked with FL W 4s lights at each corner and at 30 ft intervals, and with white retro-reflective tape 6” high and at least 4’ long is installed above the MHHW mark every 50 feet on the cofferdam. The The Weeks 526 (AIS- WEEKS 526) will be on the northern side of the cofferdam and will be advancing the cofferdam east. Weeks 526 barge will remove piles from the west end, lay them down on barges, shift east, and reinstall them. The Weeks 526 barge monitors VHF-FM channels 13 / 16 / 66. The Weeks 263 barge (AIS- WEEKS 263) and material barges will be on the outside of the cofferdam to support mixing and coring operations within the cofferdam. The Weeks 263 barge monitors VHF-FM channels 13 / 16 / 67. The second jobsite, which is north of Pier 66 in close proximity to the Manhattan bulkhead and near position 40-45.25N 074-00.47W, is operated by Frontier-Kemper Tutor Perini JV. Within this jobsite, Posillico Civil has constructed a 200 ft x 150 ft temporary marine structure to facilitate grouting and freezing operations to stabilize the ground beneath the Manhattan bulkhead in preparation for tunnel boring. The 150 ft x 50 ft Joseph D barge with a 184 ft crane on deck will be moored along the west face of the temporary marine structure. The 150 ft x 150 ft scow Angela will be moored on west side of the Joseph D barge. All barges require tug assistance for a movement and a minimum notice of 24 hours via VHF radio is required for any barge relocation. All moored barges display fixed white lights in accordance with the Inland Navigation Rules. Five seasonal white lighted buoys now mark the USCG Safety Zone. Two (LLNR 37663, 37663.1) are upriver of the construction area, two (LLNR 37663.2, 37663.3) are downriver and one (LLNR 37663.4) is to the west. All five lighted buoys exhibit FL W 2.5s characteristics. Valid 2026-01-06 to 2027-01-21. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - HUDSON RIVER General / Marine Construction (Excluding Bridges) / Dredging Mariners are advised that maintenance dredging operations will be conducted at the Sims Metal Terminal within the Port of Albany, along the western shore of the Hudson River near river mile 141.5, from October 19 through November 30, 2026, Monday through Friday from 6 a.m. to 6 p.m. The approximately 1.5-acre work area will include a sectional excavator spud barge, hopper barges, tugboat, and workboats. A lighted turbidity curtain marked with spar buoys will surround the in-water work area; support vessels may operate outside the curtain at times. The federal navigation channel will remain open, and dredging activities are not expected to impede transiting vessel traffic. Mariners should exercise caution, reduce wake as appropriate, and contact the contractor on VHF-FM Channels 13 or 16, or by telephone at 518-260-3064, for passing information. Valid 2026-10-19 to 2026-11-30. USCG Northeast District Local Notice to Mariners 45/2026 TROY DAM - HUDSON RIVER ABOVE TROY LOCK General / Marine Construction (Excluding Bridges) / Dredging Location: 42-45.18N 073-41.08W Mariners are advised that LAND Remediation, Inc. will conduct maintenance dredging in the Hudson River Federal Navigation Channel, Reach N04, on the north side of the Troy Federal Lock and Dam in Troy, NY, from September 28 through November 30, 2026. Work will take place Monday through Friday from 7:00 a.m. to 8:00 p.m. in the vicinity of 42°45'10.6"N, 73°41'04.6"W. Operations will include removal of shoal sediment along the eastern side of the river near the USACE Albany Field Office bulkhead and shoreline. A turbidity curtain, supported by temporary driven piles and anchors and marked with lights and spar buoys, will enclose the in-water work area and associated vessels. Equipment on scene will include one sectional excavator-mounted spud barge, three sectional material barges, the 26-foot tug Sunfish, and three work boats/skiffs. Vessel traffic will be able to pass the work site through a clearly marked approximately 45- to 50-foot-wide corridor north of the lock doors along the western lock wall. Mariners should use caution when transiting the area and may contact the contractor on VHF-FM channels 13 or 16, or by phone at 518-260-3064 Valid 2026-09-15 to 2027-03-14. USCG Northeast District Local Notice to Mariners 45/2026 HUTCHINSON RIVER General / Bridges Location: 40-52.14N 073-49.27W Bridge Name: Hutchinson River Pkwy Bridge Maintenance of the Hutchinson River Parkway Bridge across Hutchinson River at mile 0.9 will be conducted between October 5, 2026 to December 31, 2026 between 11:00 p.m. and 5:00 a.m. Contractors will be utilizing a barge and rescue boat for this work. Mariners requiring full horizontal clearance can contact the contractor via marine radio VHF-FM CH 13/16 or call (929) 687-2807. Mariners are advised to exercise caution when transiting the area. Valid 2026-09-23 to 2027-01-01. USCG Northeast District Local Notice to Mariners 45/2026 HUTCHINSON RIVER General / Bridges Location: 40-53.13N 073-49.22W Bridge Name: I 95 Bridge From November 16, 2026 to November 20, 2026, between 8 am to 4 pm, a contractor, Arthur DiCesare, will be performing a dive inspection of the I-95 Bridge across Hutchinson River at mile 2.2, in Bronx, NY. The contractor will be utilizing a 16 foot duck boat for this inspection. Mariners requiring full horizontal clearance can contact the contractor via marine radio VHF-FM Ch 13/16 or by calling Clay Carlson at (959) 988-3963. Mariners are advised to exercise caution and reduce wake when transiting the area. Valid 2026-10-28 to 2026-11-21. USCG Northeast District Local Notice to Mariners 45/2026 JONES INLET General / Bridges / Rehabilitation From April 15, 2026, to December 15, 2027, NYSDOT will be conducting structural rehabilitation to the Loop Parkway Bridge across Reynolds Channel at mile 8.2. Work hours are 7:00 a.m. to 4:00 p.m. Monday through Friday. During work hours, a 20-foot by 40-foot work barge will be deployed in the navigable channel. Mariners requiring full horizontal clearance under the bridge may contact the contractor on VHF-FM channels 13/16 or call (516) 351-9251. Mariners are advised to exercise caution when transiting this area. Position 40-35.63N 073-35.23W USCG Northeast District Local Notice to Mariners 45/2026 JONES INLET General / Bridges / Rehabilitation From April 15, 2026, to December 15, 2027, NYSDOT will be conducting structural rehabilitation to the Meadowbrook Parkway Bridge across False Channel at mile 0.7. Work hours are 7:00 a.m. to 4:00 p.m. Monday through Friday. During work hours, a 20-foot by 40-foot work barge will be deployed in the navigable channel. Mariners requiring full horizontal clearance under the bridge may contact the contractor on VHF-FM channels 13/16 or call (516) 351-9251. Mariners are advised to exercise caution when transiting this area. Position 40-37.80N 073-33.75W USCG Northeast District Local Notice to Mariners 45/2026 APPROACHES TO NEW YORK NANTUCKET SHOALS TO FIVE FATHOM BANK - JONES INLET General / Hazards To Navigation / Shoaling Reported NY- JONES BEACH-Update 5/15/2024 Shoaling has been identified in between Jones Beach Inlet Lighted Buoy 3 (LLNR 30920) and Jones Beach Inlet Lighted Buoy 6 (LLNR 30935). Mariners are urged to maintain a sharp lookout and transit the area with extreme caution, when navigating this area. USCG Northeast District Local Notice to Mariners 45/2026 JONES INLET General / Hazards To Navigation / Shoaling Reported NY-EAST ROCKAWAY INLET-SLOOP CHANNEL Shoaling has been identified in East Rockaway Inlet between buoys 3 and buoy 9. Mariners are urged to maintain a sharp lookout and transit the area with extreme caution, when navigating this area. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR NORTHERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - KENNEBEC RIVER APPROACH General / Marine Construction (Excluding Bridges) / Dredging Mariners are advised that Manson Construction Co. will conduct 24-hour, seven-day-per-week maintenance hopper-dredging operations in the Kennebec River near Bath, Doubling Point, and Popham Beach, Maine, from approximately December 1, 2026, through January 25, 2027. The hopper dredge M/V Newport will conduct dredging and in-river and nearshore placement operations within the Bath, Doubling Point, and Popham Beach reaches. The vessel will monitor VHF Channels 13, 16, and 66. Mariners transiting near dredging operations should proceed at their slowest safe speed, minimize wake, establish passing arrangements with the dredge, and exercise extreme caution. Valid 2026-10-01 to 2027-01-26. USCG Northeast District Local Notice to Mariners 45/2026 MOUNT HOPE BAY - KICKAMUIT RIVER General / Hazards To Navigation / Shoaling Reported RI-NARRAGANSETT BAT (CHART 13221)-MOUNT HOPE BAY-KICKAMUIT RIVER Shoaling has been reported in the Kickamuit River in the vicinity of Kickamuit River Buoy 2. Mariners are advised to proceed with caution while transiting the area. Valid 2024-09-12 to 2039-11-07. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - KILL VAN KULL General / Marine Construction (Excluding Bridges) / Dredging Trevcon Construction Company, LLC will be conducting dredging operations and wharf construction in Arthur Kill, Elizabeth, NJ, in position 40-38.62N 074-11.40W, from October 2, 2024, to January 29, 2029, Monday through Friday, between 6:00am to 3:00pm. Equipment on scene will be a crane and material barges. Mariners are urged to use extreme caution and transit the area at their slowest safe speed to create minimum wake after passing arrangements have been made. Valid 2024-10-02 to 2029-01-29. USCG Northeast District Local Notice to Mariners 45/2026 LONG ISLAND SOUND WESTERN PART - LARCHMONT HARBOR EAST ENTRANCE General / LAA / RNA / Safety Zone Location: LARCHMONT, NY – LARCHMONT HARBOR – LONG ISLAND SOUND - FIREWORKS SAFETY ZONE Details: Mariners are advised that a safety zone will be enforced for a barge-based fireworks display, scheduled to be held on Larchmont Harbor, July 3, 2026, from 9:00 p.m. until 10:30 p.m. The fireworks barge will be in approximate position 40°55’25.47"N 73°44’32.23"W (WGS84) and the Safety Zone encompasses all waters within a 400-foot radius from the barge. Vessels may not enter, remain in, or transit through the Safety Zone during the enforcement period unless authorized by the Coast Guard Captain of the Port. Other Federal, State and local agencies may assist these personnel in the enforcement of the Safety Zone. Valid 2026-06-26 to 2026-07-04. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - LEWIS BAY General / Hazards To Navigation / Obstructions Location: 41-37.177N/070-11.305W An old block/sinker for the #6 buoy near the Hyannis Channel has been identified in position 41°37.177"N 70°17.305"W. The buoy block and sinker are submerged with the chain swinging freely with about a 15yd swing radius. Buoy is not marked. Mariners urged to use caution and maintain sharp lookout in area. Valid 2026-04-09 to 2027-04-09. USCG Northeast District Local Notice to Mariners 45/2026 PISCATAQUA RIVER - LITTLE BAY General / Bridges / Removal Demolition activities have commenced to the General Sullivan Bridge across Little Bay, mile 0.1, between Newington and Dover NH and will continue through March 31, 2027. Work trestles have been constructed adjacent to the bridge from both banks, reducing the navigable channel to a width of 160 feet. A temporary work platform will be suspended from the bridge over the navigable channel on or about April 1, 2026. This work platform will not reduce the vertical clearance of the General Sullivan Bridge further than the clearance of the adjacent Spaulding Turnpike Bridge. Work over the navigation channel is complete. Work hours for this project are 6:00 a.m. to 6:00 p.m. Monday through Friday. Mariners can contact on-scene project managers via VHF-FM channels 13/16 or by calling (207) 841-1902. Mariners are advised to exercise caution when transiting this area. Position 43-07.08N 070-49.58W USCG Northeast District Local Notice to Mariners 45/2026 PISCATAQUA RIVER - LITTLE BAY General / Bridges / Rehabilitation Location: 43-07.09N 070-49.58W Bridge Name: General Sullivan Bridge Reed & Reed Inc. will be conducting bridge removal and temporary trestle construction operations in Little Bay, between Dover and Newington, NH, in position 43-07.08N 070-49.58W. Construction will run from June 5, 2026, to November 20, 2026, Monday through Saturday, between 6:30am to 6:30 pm, local time. Equipment on scene will be (2) 250-ton cranes, (1) 90-ton Rough Terrian Crane, (2) forklifts, (1) dump truck, (1) excavator, (1) loader, (2) safety boats, (2) work boats, (2) 90’ manlifts, monitoring VHF-FM CH 13 &16. Vessels will be directed through a temporarily reduced 160-foot-wide navigational channel marked by tow temporary red and two temporary green buoys. Navigation through the work zone will be maintained during normal operations whenever safe to do so. The channel is expected to be restricted from June 5, 2026, through November 20, 2026, due to construction of the final Newington trestle span. In addition, short-term channel closures of up to 4 hours will be required during Span 5 superstructure removal, currently scheduled between August 3, 2026, and August 31, 2026. Outside of active closure periods, passage through the work zone will be accommodated subject to site conditions and construction activity. Valid 2026-06-05 to 2026-11-20. USCG Northeast District Local Notice to Mariners 45/2026 APPROACHES TO NEW YORK NANTUCKET SHOALS TO FIVE FATHOM BANK - LITTLE NARRAGANSETT BAY General / Hazards To Navigation / Shoaling Reported CT-STONINGTON-SANDY POINT-Update 5/29/2023 Shoaling has been reported in the vicinity of the western tip of Sandy Point Island, Stonington, CT in vicinity of little Narragansett Bay Entrance Lighted Buoy 5 (LLNR 20210) and Buoy 7 (LLNR 20215). Stonington Police Department’s Marine Unit have observed significant narrowing of the channel, which may impact vessels transiting the area. Mariners should exercise extreme caution when navigating the channel. USCG Northeast District Local Notice to Mariners 45/2026 SHELTER ISLAND SOUND SOUTH CHANNEL - LITTLE PECONIC BAY General / Hazards To Navigation / Shoaling Reported NY-LONG ISLAND SOUND (Eastern Part) (Chart 12354)-SOUTH SIDE-MATTITUCK INLET Shoaling has been reported in the Mattituck Inlet. Mariners are advised to proceed with caution while transiting the area. Valid 2024-09-13 to 2039-12-28. USCG Northeast District Local Notice to Mariners 45/2026 BLOCK ISLAND SOUND AND GARDINERS BAY - LONG ISLAND SOUND EASTERN PART General / Bridges / Rehabilitation Location: 41-10.60N 073-10.58W Bridge Name: Stratford Ave Bridge CONNECTICUT – PEQUONNOCK RIVER – Bridge Rehab – From April 21, 2025 through November 30, 2026 contractors will be utilizing a under bridge work platform truck to access the Stratford Avenue Bridge across Pequonnock River at mile 0.1. This truck is required for rehabilitation of the bridge. The work platform will not be in the navigational channel. Questions may be directed to Superintendent Wesley Sousa Santos at (860) 622-8410. Mariners are advised to exercise caution when transiting the area. Valid 2025-04-16 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 NAHANT HARBOR - LYNN HARBOR General / Hazards To Navigation / Shoaling Reported Valid 2024-08-30 to 2039-12-31. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL General / Bridges Location: 40-40.69N 073-59.35W Bridge Name: Carroll St Bridge On September 21, 2026 to December 30, 2026 between 9:00 a.m. and 3:00 p.m. NYCDOT will be utilizing a barge and manlift will be performing bridge inspections at the Carroll Street Bridge over Gowanus Canal at mile 2. Mariners requiring full vertical and horizontal clearance can contact the contractor via marine radio VHF-FM Ch 13/16 or call Jan Pawluczuk at (646) 872-2967. Mariners are advised to exercise caution and reduce wake when transiting the area. Valid 2026-09-15 to 2026-12-31. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL General / Bridges Location: 40-40.77N 073-59.30W Bridge Name: Union St Bridge On September 21, 2026 to December 30, 2026 between 9:00 a.m. and 3:00 p.m. NYCDOT will be utilizing a barge and manlift will be performing bridge inspections at the Union Street Bridge over Gowanus Canal at mile 2.1. Mariners requiring full vertical and horizontal clearance can contact the contractor via marine radio VHF-FM Ch 13/16 or call Jan Pawluczuk at (646) 872-2967. Mariners are advised to exercise caution and reduce wake when transiting the area. Valid 2026-09-15 to 2026-12-31. USCG Northeast District Local Notice to Mariners 45/2026 AMBROSE CHANNEL - MAIN CHANNEL General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 40-36.75N 074-03.59W Commerce Construction Corporation will conduct marine construction, diving, and dockbuilding operations at various locations adjacent to U.S. Coast Guard Station Staten Island, Upper Bay, New York, in approximate position 40-36.75N 074-03.59W, from August 10, 2026, through January 15, 2027. Operations are anticipated to occur Tuesday through Friday, from 6:00 a.m. to 4:30 p.m. Equipment on scene will include one 30-foot by 90-foot spudded crane barge with a Mantis 50-ton machine and one 30-foot by 90-foot or 34-foot by 120-foot support barge fastened to the hip of the crane barge. The barges will not impede the Upper Bay navigable channel and will be moored daily at the listed coordinates during working hours. Mariners are requested to transit at slow speed to reduce wake and swell for the safety of personnel and construction operations. Commerce Construction will monitor VHF-FM channel 16 and will check in daily with Vessel Traffic Service. Valid 2026-09-24 to 2027-01-16. USCG Northeast District Local Notice to Mariners 45/2026 MARBLEHEAD CHANNEL - MARBLEHEAD HARBOR General / Marine Events / Regatta (Race) MA – MARBLEHEAD – FALL LASER ILCA SERIES – REGATTA – The Eastern Yacht Club is hosting the Fall Laser ILCA Series Regatta Series every Sunday from September 13, 2026, to November 22, 2026, from 1:00 PM to 3:00 PM in the vicinity of Marblehead Harbor. The event will consist of approximately 15 vessels, all of which are 14’ in length. The person responsible for on scene safety can be reached at 781-475-4120. For more information, please contact Jud Smith at 781-475-2140. Chart 13275 USCG Northeast District Local Notice to Mariners 45/2026 MARBLEHEAD CHANNEL - MARBLEHEAD HARBOR General / Marine Events / Regatta (Race) MA – MARBLEHEAD – MARBLEHEAD HARBOR – BYC TECH DINGHY FROSTBITING SERIES – REGATTA – The Boston Yacht Club is hosting the BYC MIT Tech Dinghy Frostbiting Series every Sunday, from November 08, 2026, to April 4, 2027, from 12:00 PM to 2:00 PM in Marblehead Harbor. The event will consist of approximately 15 sailing vessels varying all 14’ in length. The person responsible for on-scene safety can be reached at 617-548-9333. For more information, please contact Karen Tenenbaum at 617-548-9333. Chart 13275 USCG Northeast District Local Notice to Mariners 45/2026 LONG ISLAND SOUND EASTERN PART - MATTITUCK INLET General / Marine Construction (Excluding Bridges) / Dredging The U.S. Army Corps of Engineers, New York District, will conduct dredging with beach placement of dredged material on Bailie Beach in Mattituck Harbor, Suffolk County, New York, from November 4, 2026, through November 21, 2026. Operations will take place 12 hours per day using the U.S. Army Corps of Engineers special purpose dredge BRANDY STATION. The work area is in the vicinity of 41°00'57.60" N, 072°33'36.00" W and 41°00'50.40" N, 072°33'14.40" W. Mariners are requested to use caution when transiting the area, proceed at a safe speed, and make passing arrangements with the dredge as needed. The dredge may be contacted on VHF-FM channels 13 and 16 and will move on demand with notification to avoid impeding navigation. Valid 2026-11-04 to 2026-11-22. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - MENEMSHA CREEK General / Hazards To Navigation / Shoaling Reported Shoaling has been reported in Menemsha Creek, Massachusetts. Water depths in the vicinity of Menemsha Creek Buoy 4 (LLNR 15965) have been reported as low as 3.5 feet across the channel. Valid 2025-04-25 to 2028-01-19. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - MENEMSHA CREEK General / Hazards To Navigation / Shoaling Reported Location: 41-21.26N 070-46.02W 41-21.25N 070-46.01W 41-21.22N 070-46.07W 41-21.10N 070-45.96W 41-21.06N 070-45.95W 41-20.87N 070-46.05W 41-20.57N 070-46.10W 41-20.57N 070-46.13W 41-20.88N 070-46.08W 41-21.06N 070-45.98W 41-21.09N 070-45.98W 41-21.22N 070-46.09W 41-21.26N 070-46.02W Shoaling has been reported in Menemsha Creek, Massachusetts. Valid 2026-03-26 to 2026-09-22. USCG Northeast District Local Notice to Mariners 45/2026 PLUM ISLAND SOUND - MERRIMACK RIVER General / Bridges / Construction Location: 42-46.43N 071-04.58W Bridge Name: Basiliere Bridge MASSACHUSETTS– HAVERHILL-MERRIMACK RIVER–BASILIERE BRIDGE– Temporary Gas Main Installation Mariners are advised that the Middlesex Corporation will be installing a temporary gas main beneath the west side of the bridge deck. In water work will commence Saturday November 21, 2026, and continue through Friday October 30, 2026. Installation of the gas main will be conducted from a 40x40 barge with a man lift, an assist tug, and multiple work skiffs. Upon completion of the temp gas line turbidity curtains will be installed to commence cofferdam installation. All work will be conducted outside of the navigational channel. Barges and tending vessels will be secured outside of the navigational channel outside of work hours and lit on all four corners of the barge. Questions may be directed to Mr. Henry Mulvey (978) 429-1388 or Mr. Kyle Bushnell (978) 870-0423. On scene vessels can be reached via channel 13/16 VHF-FM. Mariners are urged to transit at slow speed No Wake through the project. Valid 2026-10-26 to 2027-04-24. USCG Northeast District Local Notice to Mariners 45/2026 JONES INLET - MIDDLE BAY General / Bridges / Rehabilitation From April 15, 2026, to December 15, 2027, NYSDOT will be conducting structural rehabilitation to the Meadowbrook Parkway Bridge across Fundy Channel at mile 2.7. Work hours are 7:00 a.m. to 4:00 p.m. Monday through Friday. During work hours, a 20-foot by 40-foot work barge will be deployed in the navigable channel. Mariners requiring full horizontal clearance under the bridge may contact the contractor on VHF-FM channels 13/16 or call (516) 351-9251. Mariners are advised to exercise caution when transiting this area. Position 40-36.93N 073-33.27W USCG Northeast District Local Notice to Mariners 45/2026 NEW ROCHELLE HARBOR NORTH APPROACH - MIDDLE CHANNEL General / LAA / RNA / Temporary Regulated Navigation Zone New Rochelle, NY - Long Island Sound – Safety Zone – Bridge Construction Mariners are advised that a safety zone will be enforced for construction work on the Glen Island Approach Bridge. The safety zone will be enforced from 7 a.m. until 5 p.m. each day starting on midnight December 2, 2024, through May 27, 2027. The safety zone will only be enforced during periods when construction operations at the Glen Island Bridge rehabilitation project are in progress. The Safety Zone encompasses all waters within a line beginning at 40° 53' 18.58"N 73° 46' 56.26"W; thence to 40° 53' 22.08"N 73° 46' 59.39"W; thence north along the shore to 40° 53' 23.8"N 73°46' 57.51"W; thence to 40° 53' 19.15"N 73° 46' 52.54"W and thence south along the shore back to the point of origin (WGS 84). You may not enter, remain in, or transit through the Safety Zone during the enforcement period unless authorized by the Coast Guard Captain of the Port. Other Federal, State and local agencies may assist these personnel in the enforcement of the Safety Zone. Mariners are urged to exercise caution while in the area. The anticipated dates for the windows of full channel closures: Date December 2, 2024, through December 20, 2024 February 3, 2025, through May 22, 2025 October 2, 2025 through 12 p.m. on May 22, 2026; from 7 a.m. on May 26, 2026, through 5 p.m. on May 29, 2026; and from 7 a.m. on June 22, 2026, through 5 p.m. on June 26, 2026. USCG Northeast District Local Notice to Mariners 45/2026 NEW ROCHELLE HARBOR NORTH APPROACH - MIDDLE CHANNEL General / LAA / RNA / COTP Restriction The Coast Guard is establishing a temporary safety zone for certain waters of Long Island Sound in the vicinity of the Glen Island Approach Bridge, New Rochelle, NY, for construction vessels and machinery involved in the rehabilitation project of the bridge. The safety zone is needed to protect personnel, vessels, and the marine environment from potential hazards associated with the bridge construction between December 2, 2024, through May 27, 2027. When enforced, this regulation prohibits persons and vessels from being in the safety zone unless authorized by the Captain of the Port New York or a designated representative. DATES: This rule is effective without notice from December 3, 2024, through 5 p.m. on May 27, 2027. For the purposes of enforcement, actual notice will be used from midnight on December 2, 2024, until December 3, 2024. This rule will only be enforced during periods when construction operations at the bridge are in progress. Comments and related material must be received by the Coast Guard on or before March 3, 2025. ADDRESSES: To view documents mentioned in this preamble as being available in the docket, go to https://www.regulations.gov, type USCG-2024-0956 in the search box and click “Search.” Next, in the Document Type column, select “Supporting & Related Material.” FOR FURTHER INFORMATION CONTACT: If you have questions about this rule, call or email Jeffrey Yunker, Waterways Management Division, U.S. Coast Guard Sector New York; telephone 718-354-4195, email [email protected]. IV. Discussion of the Rule This rule establishes a safety zone from 7 a.m. until 5 p.m. each day starting on midnight December 2, 2024, through May 27, 2027. The safety zone will only be enforced during periods when construction operations at the Glen Island Bridge rehabilitation project are in progress. The anticipated dates for the windows of full channel closures are from 7 a.m. on December 2, 2024, through 5 p.m. on December 20, 2024; from 7 a.m. on February 3, 2025, through 5 p.m. on May 22, 2025; and from 7 a.m. on October 2, 2025, through 5 p.m. on April 29, 2026. The Coast Guard will make notice of the safety zone via the Local Notice to Mariners and issue a Broadcast Notice to Mariners via marine channel 16 (VHF-FM) as soon as practicable in advance of these scheduled closures. All these dates are tentative and subject to change due to weather, supply chain delays, or other unforeseen circumstances. This rule remains effective through May 27, 2027, in case the project is delayed due to unforeseen circumstances. The area regulated by the safety zone will encompass the waters around the Glen Island Bridge and will cover all navigable waters, from surface to bottom, within the area formed by connecting the following latitude and longitude points in the following order: 40°53′18.58″ N 73°46′56.26″ W; thence to 40°53′22.08″ N 73°46′59.39″ W; thence north along the shore to 40°53′23.8″ N 73°46′57.51″ W; thence to 40°53′19.15″ N 73°46′52.54″ W and thence south along the shore back to the point of origin. This area is intended for the vessels and machinery being used by personnel for the Glen Island Bridge rehabilitation project. The duration of the zone is intended to ensure the safety of personnel, vessels, and these navigable waters during the bridge construction. No vessel or person will be permitted to enter the safety zone without obtaining permission from the COTP or a designated representative. The Coast Guard will make notice of the safety zone via the Local Notice to Mariners and issue a Broadcast Notice to Mariners via marine channel 16 (VHF-FM) as soon as practicable in response to an emergency or hazardous condition. Valid 2024-12-16 to 2027-05-31. USCG Northeast District Local Notice to Mariners 45/2026 LONG ISLAND SOUND WESTERN PART - MILTON HARBOR General / Hazards To Navigation / Shoaling Reported Location: 40-57.17N 073-41.73W 40-57.04N 073-41.74W 40-56.48N 073-41.97W 40-56.48N 073-42.00W 40-57.16N 073-41.74W 40-57.17N 073-41.73W NY-LONG ISLAND SOUND –MILTON HARBOR Severe Shoaling has been reported in Milton Harbor. Mariners are advised to proceed with caution while transiting the area. Valid 2024-09-13 to 2039-12-22. USCG Northeast District Local Notice to Mariners 45/2026 QUANTUCK CANAL - MORICHES BAY General / Hazards To Navigation / Shoaling Reported NY-SHINNECOCK BAY TO EAST ROCKAWAY INLET (Chart 12352)-MORICHES BAY-Update 2/8/22 Severe shoaling is present in Moriches Bay along the Long Island Intracoastal Waterway in the vicinity of Moriches Bay Buoys 21, 24, 26, 27, 28, and 29 extending the entire width of the channel at nearly all tide levels. The area from Buoys 24 to 29 is only navigable at the operator’s risk. The most severe area of shoaling can be found between buoys 26 and 28 and is less than half the charted channel depth in some areas. Mariners should be aware that the Aids to Navigation in these areas are unreliable due to shoaling and mariners are strongly advised to seek alternate routes. Moriches Bay dredging has been completed. Shoaling has been reported in Moriches Bay along the Long Island Intercoastal Waterway in the vicinity of Moriches Bay Buoy 17, 18, 21, 26, 27, 28 and 29 extending the entire width of the channel and at any tide level. The most severe area of shoaling can be found between buoys 26 and 27 and is less than 3 ft. Shoaling is also reported in Moriches Inlet in the vicinity of Moriches Inlet East Cut Buoys 3E and 5E. Mariners should be aware that the Aids to Navigation in these areas have been deemed unreliable due to shoaling and mariners are advised to seek alternate routes. If transiting these areas, do so only at high tide and proceed slowly and with extreme caution. In addition, shoaling exists west of Moriches Bay Buoy 23 and East of Moriches Bay Buoy 27. Location: 40-47.30N 072-43.47W 40-47.23N 072-43.45W 40-46.73N 072-45.71W 40-46.80N 072-45.74W 40-47.30N 072-43.47W Valid 2024-09-13 to 2039-12-28. USCG Northeast District Local Notice to Mariners 45/2026 TIVERTON CHANNEL - MOUNT HOPE BAY General / Bridges / Repairs, Painting, Or Fender Replacement Location: 41-42.56N 071-10.23W Bridge Name: I 195 Bridge From May 18, 2026 – January 31, 2027, daily between 7:00 a.m. and 5:00 p.m., fender repairs using barges will be conducted on the Braga (I-195) Bridge across the Taunton River, mile 0.4, between Fall River and Somerset, MA. While material barges are on site, the width of the channel will be reduced from 400 feet to approximately 335 feet. Mariners requiring additional information regarding this project can contact the contractor on-site via marine radio VHF-FM Ch. 13/16 or by calling 978-844-4768. Mariners are advised to exercise caution when transiting this area. Valid 2026-05-18 to 2027-02-01. USCG Northeast District Local Notice to Mariners 45/2026 TIVERTON CHANNEL - MOUNT HOPE BAY General / Marine Construction (Excluding Bridges) / Dredging Location: 41-43.07N 071-09.96W Mariners are advised that Gladding-Hearn Shipbuilding Duclos Corporation will conduct maintenance dredging of the existing marine railway on the Taunton River in Somerset, MA, from December 21, 2026, through December 23, 2026. Operations are scheduled Monday through Friday from 7:00 a.m. to 5:00 p.m. Equipment on scene will include a long arm excavator. The work location is in approximate position 41°43'04.30"N, 071°09'57.32"W, charted on NOAA ENC US5FAVCB. Mariners should use caution when transiting the area and proceed at a safe speed. Valid 2026-12-21 to 2026-12-24. USCG Northeast District Local Notice to Mariners 45/2026 PRESIDENT ROADS - MYSTIC RIVER General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 42-23.71N 071-04.51W 42-23.66N 071-04.48W 42-23.65N 071-04.50W 42-23.70N 071-04.53W 42-23.71N 071-04.51W MASSACHUSETTS – BOSTON INNER HARBOR – MYSTIC RIVER – AMELIA EAHART DAM COMMERCIAL LOCK - Lock Closure Mariners are advised that the Amelia Earhart Dam Commercial Lock is undergoing repairs and will be unavailable to vessel traffic from November 16th, 2026, at 6:00 a.m. until December 19th, 2026, at 6:00 p.m. Both Recreational Locks will remain fully operational and available for passage by vessels with a beam of less than 22-feet. For more information mariners may contact the Department of Conservation and Recreation (DCR) Mr. William Gode at (617) 828-1629 or Mr. Theodore Bien-Aime at 617/938-4628. Mariners are advised to plan accordingly and use caution when transiting the area. Valid 2026-11-15 to 2026-12-20. USCG Northeast District Local Notice to Mariners 45/2026 MORICHES BAY - NARROWS BAY General / Bridges / Construction Location: 40-44.29N 072-52.12W Bridge Name: Smith Point Bridge Suffolk County is continuing construction of the Smith Point Bridge replacement across Narrow Bay at mile point 6.1, between Mastic Beach and Smith Point, NY. The 120’ x 40’ crane barge “Tom Denis” is adjacent to the first cofferdam south of the channel. A 20’ x 50’ Poseidon sectional barge is onsite and will be moored on the southern end of the north trestle initially. 2ea 20’ x 8’ Aluminum work skiffs are onsite, moored in the marina and assisting around site during the day. The McDonough “6014” is onsite presently in the marina with a load of concrete piles. The 150’ x 60’ Hughes “Virginia” spud barge is onsite to be outfitted to start work on the north span. Vessels that will be coming to site soon: 175’ x 75’ Sterling crane barge “Stephen Owens”, 190’ x 80’ Poseidon sectional crane barge, and 110’ x 34’ flat deck barge “Overlook.” The 25’ x 14’ Clydesdale pushboat “Pushillico” will be back and forth to site as needed. The McDonough “6014” and “U814” spud barges will be rotating in and out with pile deliveries to site. The Hughes push boat “BridgeBuilder” will join as an extra push boat in the near future. All barges will be positioned outside of the navigational channel. Mariners with any questions or concerns may contact Nicholas Iaboni at (516) 551-7879. Mariners that can pass without a bridge opening may do so and are advised to exercise caution when transiting the area. Valid 2026-09-03 to 2027-08-01. USCG Northeast District Local Notice to Mariners 45/2026 NARROWS BAY General / Bridges Location: 40-44.32N 072-52.10W Bridge Name: Smith Point Bridge From November 9, 2026 to November 19, 2026, a contractor (HNTB), will be conducting biennial inspections at the William Floyd (Smith Point) Parkway across Narrow Bay at mile 6.1.. Contractor will be utilizing a barge with a manlift to perform the inspections. Mariners requiring full horizontal clearance or any questions and concerns can contact the contractor via marine radio VHF-FM Ch 13/16 or call Terrence Hooker at 347-879-2226. Mariners are advised to exercise caution and reduce wake when transiting the area. Valid 2026-10-27 to 2026-11-20. USCG Northeast District Local Notice to Mariners 45/2026 MORICHES BAY - NARROWS BAY General / Hazards To Navigation / Shoaling Reported Location: 40-44.42N 072-51.72W Shoaling has been reported of 3.9 feet at mean low low water in the vicinity of position 40-44.42N 072-51.72W. Mariners are advised to transit the area with extreme caution. Valid 2026-03-06 to 2027-03-06. USCG Northeast District Local Notice to Mariners 45/2026 MORICHES BAY - NARROWS BAY General / Hazards To Navigation / Shoaling Reported Location: 40-44.48N 072-51.48W Shoaling has been reported of 3.5 feet at mean low low water in the vicinity of position 40-44.48N 072-51.48W. Mariners are advised to transit the area with extreme caution. Valid 2026-03-06 to 2027-03-06. USCG Northeast District Local Notice to Mariners 45/2026 MORICHES BAY - NARROWS BAY General / Hazards To Navigation / Obstructions Location: 40-43.87N 072-50.96W Mariners are advised that a chain and anchor from a previously deployed buoy mooring are partially submerged on the ocean floor at this location. Ground fishing and anchoring in this area are not recommended due to the potential risk of entanglement. Valid 2026-09-16 to 2027-03-15. USCG Northeast District Local Notice to Mariners 45/2026 MORICHES BAY - NARROWS BAY General / Hazards To Navigation / Shoaling Reported NY-SHINNECOCK BAY-NARROWS BAY Shoaling has been identified in East Rockaway Inlet in the area between buoys Narrows Bay Lighted Buoy 6 and Narrows Bay Buoy 7. Mariners are urged to maintain a sharp lookout and transit the area with extreme caution. USCG Northeast District Local Notice to Mariners 45/2026 NAVAREA IV General / Bridges / Inspection Location: 40-45.42N 073-57.28W Bridge Name: Queensboro Bridge From August 6, 2026, to December 31, 2026, a traveler and safety boat will periodically be operating between 8:30 am to 6:30 pm daily at the Queensboro Bridge across the East River at mile 5.5, in New York to conduct a bridge inspection. Mariners requiring full vertical clearance can contact the contractor via marine radio VHF-FM Ch 13/16 or by calling the project manager at 860-338-4607, or by contacting USCG Vessel Traffic Service New York at 718-354-4088. Mariners are advised to exercise caution when transiting the area. Valid 2026-08-06 to 2027-01-01. USCG Northeast District Local Notice to Mariners 45/2026 NAVAREA IV General / Bridges / Inspection Location: 40-38.79N 073-52.42W Bridge Name: Belt Pkwy Bridge From August 24, 2026, to November 30, 2026, between 9:00 am to 3:00 pm, a barge with manlift and tug boat #NY8360GY will be utilized to inspect the Belt Parkway Bridge across Hendrix Creek at mile 0.1, in Brooklyn, NY. Mariners requiring full horizontal clearance can contact the contractor via marine radio VHF-FM Ch 13/16 or by calling (917) 306-0152. Mariners are advised to exercise caution and reduce wake when transiting the area. Valid 2026-08-24 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 NAVAREA IV General / Hazards To Navigation / Obstructions Location: 39-44.87N 072-25.11W The Wildlife Conservation Society submitted a Notice to Mariners regarding planned acoustic monitoring work near the Hudson Canyon. The project involves deploying four small, fully submerged acoustic recorders at four sites near the northern end of Hudson Canyon to detect vocalizing cetacean species and characterize the ambient underwater noise environment. The equipment consists of compact acoustic recording units suspended approximately two meters above the seafloor between an anchor and a small sub-surface float. The design has no surface expression and uses an acoustic release system intended to leave no equipment or mooring on the seafloor after recovery. The listed monitoring sites are located at approximately 39°44'52.02" N, 072°25'6.72" W; 39°37'26.33" N, 072°28'26.67" W; 39°36'47.57" N, 072°17'9.68" W; and 39°28'44.31" N, 072°32'56.1" W. Initial deployment is planned for August 26, 2026, with retrieval and redeployment anticipated in October or November. Work will occur during daylight hours, generally between 7:00 a.m. and 7:00 p.m. Operations will use a small research vessel, approximately 6 to 10 meters in length, along with acoustic receivers, anchors, rope, sub-surface buoys, and related deployment equipment. The recorders and floats will be placed approximately 80 meters below the surface, with no surface equipment, which is intended to avoid interference with vessel traffic. Marine radio channel 16 is listed for communications, and no disposal site is associated with the activity. Valid 2026-08-24 to 2026-11-30. USCG Northeast District Local Notice to Mariners 45/2026 NAVAREA IV General / Hazards To Navigation / Obstructions Location: 39-37.44N 072-28.44W The Wildlife Conservation Society submitted a Notice to Mariners regarding planned acoustic monitoring work near the Hudson Canyon. The project involves deploying four small, fully submerged acoustic recorders at four sites near the northern end of Hudson Canyon to detect vocalizing cetacean species and characterize the ambient underwater noise environment. The equipment consists of compact acoustic recording units suspended approximately two meters above the seafloor between an anchor and a small sub-surface float. The design has no surface expression and uses an acoustic release system intended to leave no equipment or mooring on the seafloor after recovery. The listed monitoring sites are located at approximately 39°44'52.02" N, 072°25'6.72" W; 39°37'26.33" N, 072°28'26.67" W; 39°36'47.57" N, 072°17'9.68" W; and 39°28'44.31" N, 072°32'56.1" W. Initial deployment is planned for August 26, 2026, with retrieval and redeployment anticipated in October or November. Work will occur during daylight hours, generally between 7:00 a.m. and 7:00 p.m. Operations will use a small research vessel, approximately 6 to 10 meters in length, along with acoustic receivers, anchors, rope, sub-surface buoys, and related deployment equipment. The recorders and floats will be placed approximately 80 meters below the surface, with no surface equipment, which is intended to avoid interference with vessel traffic. Marine radio channel 16 is listed for communications, and no disposal site is associated with the activity. Valid 2026-08-24 to 2026-11-30. USCG Northeast District Local Notice to Mariners 45/2026 NAVAREA IV General / Hazards To Navigation / Obstructions Location: 39-36.79N 072-17.16W The Wildlife Conservation Society submitted a Notice to Mariners regarding planned acoustic monitoring work near the Hudson Canyon. The project involves deploying four small, fully submerged acoustic recorders at four sites near the northern end of Hudson Canyon to detect vocalizing cetacean species and characterize the ambient underwater noise environment. The equipment consists of compact acoustic recording units suspended approximately two meters above the seafloor between an anchor and a small sub-surface float. The design has no surface expression and uses an acoustic release system intended to leave no equipment or mooring on the seafloor after recovery. The listed monitoring sites are located at approximately 39°44'52.02" N, 072°25'6.72" W; 39°37'26.33" N, 072°28'26.67" W; 39°36'47.57" N, 072°17'9.68" W; and 39°28'44.31" N, 072°32'56.1" W. Initial deployment is planned for August 26, 2026, with retrieval and redeployment anticipated in October or November. Work will occur during daylight hours, generally between 7:00 a.m. and 7:00 p.m. Operations will use a small research vessel, approximately 6 to 10 meters in length, along with acoustic receivers, anchors, rope, sub-surface buoys, and related deployment equipment. The recorders and floats will be placed approximately 80 meters below the surface, with no surface equipment, which is intended to avoid interference with vessel traffic. Marine radio channel 16 is listed for communications, and no disposal site is associated with the activity. Valid 2026-08-24 to 2026-11-30. USCG Northeast District Local Notice to Mariners 45/2026 NAVAREA IV General / Hazards To Navigation / Obstructions Location: 39-28.74N 072-32.93W The Wildlife Conservation Society submitted a Notice to Mariners regarding planned acoustic monitoring work near the Hudson Canyon. The project involves deploying four small, fully submerged acoustic recorders at four sites near the northern end of Hudson Canyon to detect vocalizing cetacean species and characterize the ambient underwater noise environment. The equipment consists of compact acoustic recording units suspended approximately two meters above the seafloor between an anchor and a small sub-surface float. The design has no surface expression and uses an acoustic release system intended to leave no equipment or mooring on the seafloor after recovery. The listed monitoring sites are located at approximately 39°44'52.02" N, 072°25'6.72" W; 39°37'26.33" N, 072°28'26.67" W; 39°36'47.57" N, 072°17'9.68" W; and 39°28'44.31" N, 072°32'56.1" W. Initial deployment is planned for August 26, 2026, with retrieval and redeployment anticipated in October or November. Work will occur during daylight hours, generally between 7:00 a.m. and 7:00 p.m. Operations will use a small research vessel, approximately 6 to 10 meters in length, along with acoustic receivers, anchors, rope, sub-surface buoys, and related deployment equipment. The recorders and floats will be placed approximately 80 meters below the surface, with no surface equipment, which is intended to avoid interference with vessel traffic. Marine radio channel 16 is listed for communications, and no disposal site is associated with the activity. Valid 2026-08-24 to 2026-11-30. USCG Northeast District Local Notice to Mariners 45/2026 NAVAREA IV General / Hazards To Navigation / Obstructions Location: 40-59.21N 071-30.52W Commencing August, 2026 and continuing through November, 2026, the U.S. Naval Research Laboratory will be placing moorings on the New Jersey coastal shelf and southeastward of Block Island Rhode Island. Moorings will be temporarily established on the seafloor and extend 3 feet off the bottom. Three moorings will also have a surface expression and be lighted. Mariners are requested to not disturb these U.S. Naval experiments and to avoid dragging in the area. Valid 2026-08-24 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 NAVAREA IV General / Hazards To Navigation / Obstructions Location: 40-11.27N 071-09.43W Commencing August, 2026 and continuing through November, 2026, the U.S. Naval Research Laboratory will be placing moorings on the New Jersey coastal shelf and southeastward of Block Island Rhode Island. Moorings will be temporarily established on the seafloor and extend 3 feet off the bottom. Three moorings will also have a surface expression and be lighted. Mariners are requested to not disturb these U.S. Naval experiments and to avoid dragging in the area. Valid 2026-08-24 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 NAVAREA IV General / Hazards To Navigation / Obstructions Location: 39-05.65N 073-31.65W Commencing August, 2026 and continuing through November, 2026, the U.S. Naval Research Laboratory will be placing moorings on the New Jersey coastal shelf and southeastward of Block Island Rhode Island. Moorings will be temporarily established on the seafloor and extend 3 feet off the bottom. Three moorings will also have a surface expression and be lighted. Mariners are requested to not disturb these U.S. Naval experiments and to avoid dragging in the area. Valid 2026-08-24 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 NAVAREA IV General / Hazards To Navigation / Obstructions Location: 40-03.82N 071-32.56W Commencing August, 2026 and continuing through November, 2026, the U.S. Naval Research Laboratory will be placing moorings on the New Jersey coastal shelf and southeastward of Block Island Rhode Island. Moorings will be temporarily established on the seafloor and extend 3 feet off the bottom. Three moorings will also have a surface expression and be lighted. Mariners are requested to not disturb these U.S. Naval experiments and to avoid dragging in the area. Valid 2026-08-24 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 NAVAREA IV General / Hazards To Navigation / Obstructions Location: 40-43.57N 071-23.61W Commencing August, 2026 and continuing through November, 2026, the U.S. Naval Research Laboratory will be placing moorings on the New Jersey coastal shelf and southeastward of Block Island Rhode Island. Moorings will be temporarily established on the seafloor and extend 3 feet off the bottom. Three moorings will also have a surface expression and be lighted. Mariners are requested to not disturb these U.S. Naval experiments and to avoid dragging in the area. Valid 2026-08-24 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 NAVAREA IV General / Hazards To Navigation / Obstructions Location: 40-28.19N 071-16.84W Commencing August, 2026 and continuing through November, 2026, the U.S. Naval Research Laboratory will be placing moorings on the New Jersey coastal shelf and southeastward of Block Island Rhode Island. Moorings will be temporarily established on the seafloor and extend 3 feet off the bottom. Three moorings will also have a surface expression and be lighted. Mariners are requested to not disturb these U.S. Naval experiments and to avoid dragging in the area. Valid 2026-08-24 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 NAVAREA IV General / Hazards To Navigation / Obstructions Location: 40-14.86N 071-11.00W Commencing August, 2026 and continuing through November, 2026, the U.S. Naval Research Laboratory will be placing moorings on the New Jersey coastal shelf and southeastward of Block Island Rhode Island. Moorings will be temporarily established on the seafloor and extend 3 feet off the bottom. Three moorings will also have a surface expression and be lighted. Mariners are requested to not disturb these U.S. Naval experiments and to avoid dragging in the area. Valid 2026-08-24 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 NAVAREA IV General / Hazards To Navigation / Obstructions Location: 40-07.22N 071-07.80W Commencing August, 2026 and continuing through November, 2026, the U.S. Naval Research Laboratory will be placing moorings on the New Jersey coastal shelf and southeastward of Block Island Rhode Island. Moorings will be temporarily established on the seafloor and extend 3 feet off the bottom. Three moorings will also have a surface expression and be lighted. Mariners are requested to not disturb these U.S. Naval experiments and to avoid dragging in the area. Valid 2026-08-24 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 NAVAREA IV General / Hazards To Navigation / Obstructions Location: 39-20.12N 073-57.74W Commencing August, 2026 and continuing through November, 2026, the U.S. Naval Research Laboratory will be placing moorings on the New Jersey coastal shelf and southeastward of Block Island Rhode Island. Moorings will be temporarily established on the seafloor and extend 3 feet off the bottom. Three moorings will also have a surface expression and be lighted. Mariners are requested to not disturb these U.S. Naval experiments and to avoid dragging in the area. Valid 2026-08-24 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 NAVAREA IV General / Hazards To Navigation / Obstructions Location: 39-12.88N 073-44.68W Commencing August, 2026 and continuing through November, 2026, the U.S. Naval Research Laboratory will be placing moorings on the New Jersey coastal shelf and southeastward of Block Island Rhode Island. Moorings will be temporarily established on the seafloor and extend 3 feet off the bottom. Three moorings will also have a surface expression and be lighted. Mariners are requested to not disturb these U.S. Naval experiments and to avoid dragging in the area. Valid 2026-08-24 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 NAVAREA IV General / Hazards To Navigation / Obstructions Location: 38-57.47N 073-16.94W Commencing August, 2026 and continuing through November, 2026, the U.S. Naval Research Laboratory will be placing moorings on the New Jersey coastal shelf and southeastward of Block Island Rhode Island. Moorings will be temporarily established on the seafloor and extend 3 feet off the bottom. Three moorings will also have a surface expression and be lighted. Mariners are requested to not disturb these U.S. Naval experiments and to avoid dragging in the area. Valid 2026-08-24 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 NAVAREA IV General / Hazards To Navigation / Obstructions Location: 38-50.86N 073-05.08W Commencing August, 2026 and continuing through November, 2026, the U.S. Naval Research Laboratory will be placing moorings on the New Jersey coastal shelf and southeastward of Block Island Rhode Island. Moorings will be temporarily established on the seafloor and extend 3 feet off the bottom. Three moorings will also have a surface expression and be lighted. Mariners are requested to not disturb these U.S. Naval experiments and to avoid dragging in the area. Valid 2026-08-24 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 NAVAREA IV General / Hazards To Navigation / Obstructions Location: 38-50.83N 072-56.70W Commencing August, 2026 and continuing through November, 2026, the U.S. Naval Research Laboratory will be placing moorings on the New Jersey coastal shelf and southeastward of Block Island Rhode Island. Moorings will be temporarily established on the seafloor and extend 3 feet off the bottom. Three moorings will also have a surface expression and be lighted. Mariners are requested to not disturb these U.S. Naval experiments and to avoid dragging in the area. Valid 2026-08-24 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 NAVAREA IV General / Hazards To Navigation / Hazards Location: 41-35.50N 070-28.01W 41-35.49N 070-27.97W 41-35.44N 070-27.96W 41-35.44N 070-27.98W 41-35.50N 070-28.01W South Cape Oyster Co. will be conducting shellfish aquaculture operation in Ockway Bay, Mashpee, Massachusetts, located on the eastern side of the entrance from Popponesset Bay, west of Daniels Island. The work is associated with existing oyster farm operations and a request for Nationwide Permit 48 verification. The operation is listed as year-round, with floating gear deployed approximately April 1 through November 30 and lowered for overwintering from December 1 through March 31 and during storms. Site visits occur several times per week during the operating season and as needed in winter, generally during daytime hours. Equipment on scene includes a 21-foot Carolina Skiff work boat, floating vinyl-coated wire mesh cages, grow bags, bottom trays, yellow 16-inch marker balls, line, and approximately 56 helical screw anchors. The vessel may monitor VHF Channel 16 while underway. The form states that the aquaculture grant is outside navigable channels and mooring fields, in shallow water of approximately 2 feet at mean low water and 6 feet at mean high water. The site is marked year-round with six yellow aquaculture marker balls, and the applicant states that the fixed gear does not impede navigation. No vessel relocation is anticipated, and the work skiff will yield to transiting traffic. Valid 2026-07-31 to 2027-03-31. USCG Northeast District Local Notice to Mariners 45/2026 NAVAREA IV General / Marine Construction (Excluding Bridges) / Dredging Location: 40-40.09N 074-00.05W Cashman Dredging and Marine Contracting Co., will be conducting work associated with the EPA Superfund Gowanus Canal Environmental Remediation Project in Brooklyn, New York. The operation involves transferring sediment and debris from smaller hopper barges to larger hopper barges for delivery to the Clean Earth Claremont Processing Facility in Jersey City, New Jersey, or directly loading material into trucks for over-the-road transport to an offsite disposal facility. The work is planned for the Gowanus Canal approximately 100 feet south of the 659 Smith Street property, across the channel from the New York City Department of Sanitation facility. Operations are scheduled to begin August 31, 2026, and continue through November 15, 2027, with work hours from 0700 to 1800, Monday through Friday. Equipment expected on scene includes one 40-by-140-foot excavator deck barge, one 37-by-150-foot material barge, one 30-by-60-foot hopper barge, and one 600-horsepower tugboat. Vessels may be contacted on VHF channels 13 and 16. The applicant states that passing arrangements can be made within approximately 30 minutes and that the barges will have a full-time tender available to move them on demand to avoid impeding navigation. The form identifies NOAA Chart US5NYCDG/12334 for the area and includes a site layout showing the temporary dock, containment boom, hopper barges, transloader, spill tarp, gangway, and water treatment system Valid 2026-08-18 to 2026-11-16. USCG Northeast District Local Notice to Mariners 45/2026 SHREWSBURY RIVER - NAVESINK RIVER General / Bridges / Maintenance Location: 40-19.50N 074-05.93W Garden State Parkway Structures (109.3SO, 109.3NO, 109.3NI) Southbound Outer and Northbound Outer and Inner Structures On April 20, 2026 through November 23, 2026, between 6:00 a.m. and 3:00p.m. Monday through Friday, temporary walkways attached to the GSP structures and a hydro-platform will be operated from the Garden State Pkway Structures under the Swimming River, located 3 miles from the confluence of the Navesink River, in Tinton Falls, Monmouth County, New Jersey. Mariners requiring full vertical and horizontal clearances can contact the contractor via marine radio VHF-FM Ch. 13/16 or call (646) 267-5285 or (908) 421-9718. Mariners are requested to exercise caution when transiting the area. Valid 2026-04-17 to 2026-11-24. USCG Northeast District Local Notice to Mariners 45/2026 SHREWSBURY RIVER - NAVESINK RIVER General / Hazards To Navigation / Shoaling Reported Location: 40-23.17N 073-58.75W 40-23.13N 073-58.70W 40-22.88N 073-58.95W 40-22.83N 073-59.43W 40-22.93N 073-59.73W 40-22.91N 074-00.71W 40-22.78N 074-01.01W 40-21.99N 074-03.29W 40-21.90N 074-03.39W 40-21.39N 074-03.82W 40-21.40N 074-03.85W 40-21.98N 074-03.38W 40-22.77N 074-01.42W 40-22.82N 074-01.01W 40-22.94N 074-00.75W 40-22.97N 073-59.64W 40-22.88N 073-59.38W 40-22.94N 073-58.98W 40-23.17N 073-58.75W NJ-NAVESINK RIVER Recent surveys have shown significant shoaling in the Navesink River. Shoaling exists across the entire reach beginning at the entrance to the Navesink River to Navesink River Buoy 24. Least depths of 2.3 feet to 5.8 feet extending into channel and throughout the waterway. Navigation of the area requires extreme caution due to the encroaching nature of the shoal. Valid 2024-09-13 to 2039-12-21. USCG Northeast District Local Notice to Mariners 45/2026 SHREWSBURY RIVER - NAVESINK RIVER General / Hazards To Navigation / Shoaling Reported THE COAST GUARD HAS RECIEVED REPORT OF A SHIFT IN SHOALING IN THE NAVESINK RIVER. SHOALING HAS BEEN REPORTED AS 1-2 FEET AT LOW TIDE BETWEEN NAVESINK RIVER BUOY 8 AND 14 PRESENTING HAZARDOUS CONDITIONS IN THE AREA . MARINERS ARE ADVISED TO USE CAUTION WHILE TRANSITING THE AREA. Valid 2026-04-02 to 2027-08-15. USCG Northeast District Local Notice to Mariners 45/2026 NEW BEDFORD CHANNEL - NEW BEDFORD HARBOR CHANNEL General / Hazards To Navigation / Wrecks An uncharted wreck has been identified during recent survey work with the following details: length: @13m, Width:@10m Height off seafloor:@4.9m Least Depth:@4.9m in position 41-38.62N 070-55.13W Position 41-38.58N 070-55.12W USCG Northeast District Local Notice to Mariners 45/2026 NEW BEDFORD CHANNEL - NEW BEDFORD HARBOR CHANNEL General / Marine Construction (Excluding Bridges) / Dredging DW White Construction Inc. will conduct intermittent disposal of material into CAD Cell 3 in the Acushnet River, at approximate position 41°37'27.37"N, 070°54'52.10"W, from October 23, 2026, through July 8, 2027. Operations will occur Monday through Friday, 6:00 a.m. to 11:00 p.m. Equipment on scene may include the push boats SHEELAGH M and ERIN ASHLEY; spud barges KS1502 and POSEIDON SECTIONAL; barges LITTLE JEFF and 61B; and a Caterpillar 390 excavator. Work at Shuster Wharf will be conducted without a silt curtain to avoid impeding channel navigation. Work within CAD Cell 3 will occur inside a silt curtain. Mariners are requested to use caution, maintain a safe speed and distance, and contact project vessels on VHF-FM Channels 13, 16, or 71 for passing arrangements. Valid 2026-10-21 to 2027-07-09. Position 41-37.45N 070-54.87W USCG Northeast District Local Notice to Mariners 45/2026 NEW BEDFORD CHANNEL - NEW BEDFORD HARBOR CHANNEL General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes US Army Corps of Engineers (USACE) will be conducting work on the hurricane barrier sector gate leading edge steel repair Available width of the 150’ navigation opening will be reduced by up to 20’ at times during the project from a partial gate closure, a work skiff, and a floating work platform. Tug and tows or large vessels that require the full 150’ horizontal clearance should contact the barrier one hour before transit on Channel 13 VHF to coordinate vessel movement USCG Northeast District Local Notice to Mariners 45/2026 SECTOR NORTHERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - NEW BRUNSWICK GRAND MANAN CHANNEL NORTHERN PART General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 44-54.93N 066-59.07W Fuller Marine Services, Inc. submitted a Local Notice to Mariners (LNM) Information Form to the U.S. Coast Guard First District regarding the planned replacement of the Clark Ledge Daybeacon (LLNR 925) in the St. Croix River, Maine. The project involves replacing the aid in its entirety, with operations scheduled to begin on June 15, 2026, and continue until completion. Work will be conducted daily from 7:00 AM to 6:00 PM, utilizing the vessels Enzo Charles and Mary Louisa II. Vessels on-site will monitor VHF-FM Channels 16 and 13 for navigational safety and passing arrangements, with secondary contact available on Channel 09 or USCG working channel 22A. The crew will maintain a clear fairway for all traffic and will reposition within 30 minutes if additional channel breadth is required, subject to weather and safety conditions. Valid 2026-06-15 to 2027-06-02. USCG Northeast District Local Notice to Mariners 45/2026 LONG ISLAND SOUND EASTERN PART - NEW HAVEN HARBOR General / Marine Construction (Excluding Bridges) / Dredging Location: 41-17.36N 072-54.50W Mariners are advised that maintenance dredging will occur at 30 Waterfront Street in New Haven Harbor, Connecticut. The work will remove approximately 10,300 cubic yards of material from an approximately 77,450-square-foot area to a design depth of -35 feet mean low water, with up to two feet of allowable overdepth. Dredges, barges, scows, and support vessels may be operating in the area during the in-water work window of October 1 through January 31. Mariners should use caution, maintain a safe distance from project equipment, and comply with directions from the dredging contractor, harbor authorities, and the U.S. Coast Guard. Valid 2026-10-19 to 2027-01-31. USCG Northeast District Local Notice to Mariners 45/2026 LONG ISLAND SOUND EASTERN PART - NEW HAVEN HARBOR General / Marine Construction (Excluding Bridges) / Dredging Great Lakes Dredge and Dock Co. LLC will conduct improvement dredging for the New Haven Harbor Federal Navigation Project in New Haven Harbor, New Haven, CT, from October 2026 through March 2027. Work will occur 24 hours per day, 7 days per week, in the New Haven Harbor Main Ship Channel and Turning Basin, with dredged material placement at the Shellfish Habitat Disposal Area, Morris Cove Borrow Pit Disposal Area, West River Borrow Pit Disposal Area, and Long Island Sound Disposal Site. Equipment on scene will include Dredge 54, Dredge 58, Tug SMITH PRIVATEER, Tug SMITH PREDATOR, Tug LARRY J HEBERT, multiple scows, support vessels, and associated equipment. Mariners are requested to contact the dredges and support vessels on VHF-FM channels 13 or 16 to make passing arrangements. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. For additional information, contact Johan VanBladel at 630-235-9612 or [email protected]. Valid 2026-09-17 to 2027-03-31. USCG Northeast District Local Notice to Mariners 45/2026 LONG ISLAND SOUND EASTERN PART - NEW HAVEN HARBOR General / MSIB Location: 41-16.93N 072-54.93W SUMMARY: The U.S. Anny Corps of Engineers (USACE). New England District, will be conducting dredging operations in support of the New Haven Harbor Improvement Project in New Haven, Connecticut. Mariners are advised to use caution, maintain a proper lookout. and communicate early with the dredging vessel when operating in or near the project area. SITUATION: The New Haven Harbor Improvement Project will modernize approximately 5.5 miles of the federal navigation channel serving the deep-water terminals of New Haven. Great Lakes Dock and Dredge Company, under contract with USACE, is expected to conduct work over two dredging cycles. The first one beginning in October 2026 and continuing through March 2027, and the second cycle beginning in October 2027 and continuing through March 2028. Operations are planned to take place 24 hours a clay, 7 days a week. Planned improvements include deepening the entrance channel, main channel, maneuvering area, and turning basin from 35 feet to 40 feet; widening the entrance channel from 500 feet to 600 feet outside the breakwaters; widening the channel bend between the breakwaters from 560 feet to 800 feet; widening the main channel inside the harbor from 400 feet to 500 feet; and optimizing the turning basin for larger vessels. Dredging operations may affect normal vessel movement, maneuvering, and transit within New Haven Harbor. Mariners should anticipate the presence of dredging equipment and associated support vessels within the federal navigation channel and surrounding work areas. Vessels looking to transit the area are urged to contact the dredge early to arrange safe passage and to maintain a proper lookout when navigating near operations. COMMUNICATIONS: For urgent safety-of-life matters, please contact the Sector Long Island Sound Command Center on VHF-FM Channel 16 or call (866) 299-8031. Working Vessels will monitor channels 13, 16, and 79. Additionally, please check USCG Navigation Center oflen for updates to the public from the US Coast Guard. Questions regarding this bulletin may be directed to Lieutenant Joel Chapman. ChiefofWaterways Management Division at (475) 355-5336 or email [email protected]. Valid 2026-10-26 to 2027-04-01. USCG Northeast District Local Notice to Mariners 45/2026 GEORGES BANK AND NANTUCKET SHOALS - NEW INLET General / Hazards To Navigation / Shoaling Reported MA-MARSHFIELD-NEW INLET Shoaling has been reported from the North River junction buoy towards the #2 buoy South River. This area is reported as approx. 3.0 feet during the low tide. Mariners should use caution while transiting the area, especially during astronomical low tides. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - NEW JERSEY PIERHEAD General / Hazards To Navigation / Shoaling Reported Claremont Terminal Channel Shoaling – The Harbor Safety, Operations and Navigation Committee of the Port of NY and NJ – Deep Draft Working Group: The need to immediately restrict the deep draft of vessels transiting Claremont Terminal Channel has come to our attention. Based on the latest available surveys conducted by the Army Corps of Engineers, November 4, 2024, shoaling has occurred in the channel. The shoaling has minimized the available depth of water to 15 feet near the centerline of the channel. Based on this data, vessels will be restricted to a draft of 13 feet, plus the rise in tide, with a maximum draft of 18 feet. On 11/04/2024, the shoal area was bound by the following approximate coordinates: 40° 41’11”N, 074° 04’ 41”W; thence to 40° 41’ 17”N, 074° 04’ 33”W; thence to 40° 40’ 14”N, 074° 03’ 06”W; thence to 40° 40’ 10”N, 074° 03’ 13”W. Valid 2025-02-13 to 2027-02-28. USCG Northeast District Local Notice to Mariners 45/2026 LONG ISLAND SOUND EASTERN PART - NEW LONDON HARBOR General / Marine Construction (Excluding Bridges) / Dredging To: 2030-06-30 Marine construction and dredging operations are scheduled to occur on or about November 1, 2026, through June 9, 2030, in New London Harbor on the Thames River adjacent to the General Dynamics Electric Boat Facility in Groton, CT, between Graving Dock #2 and Graving Dock #3. Operations will include wet berth pier construction, dredging, and associated marine support activities, with barges, dredging equipment, tugboats, survey vessels, and other support equipment operating in the area. A mooring may be established in New London Harbor Anchorage A and/or Anchorage B for staging barges. Mariners are advised to transit the area at the slowest safe speed, minimize wake, and proceed with caution. Project vessels will monitor VHF-FM Channels 16 and 13, with a designated working channel to be established. Passing arrangements should be coordinated via VHF radio, or in advance by telephone when necessary, and approximately 30 minutes may be required to clear the navigation area for vessel passage depending on operational and environmental conditions. Valid 2026-11-01 until further notice. USCG Northeast District Local Notice to Mariners 45/2026 NEW ROCHELLE HARBOR NORTH APPROACH General / Bridges Location: 40-53.34N 073-46.95W Bridge Name: Glen Island Bridge The Coast Guard has issued a temporary deviation for the Glen Island Temporary Bridge. Under this temporary deviation, the Glen Island Temporary Bridge will not open for marine traffic from November 16, 2026 through November 18, 2026. Mariners that can pass without a bridge opening may do so and are advised to exercise caution when transiting the area. Valid 2026-11-10 to 2026-11-19. USCG Northeast District Local Notice to Mariners 45/2026 KILL VAN KULL - NEWARK BAY General / Bridges / Construction Construction will commence on June 1, 2026, to replace NJ Turnpike Authority’s Newark Bay Bridge over Newark Bay at mile 3.8 between Newark and Bayonne NJ. From June 1, 2026, to April 1, 2027, contractors will be constructing a work trestle from the Bayonne shore of Newark Bay to the navigable channel. This work will not impede the navigable channel. Work hours will be 6:00 a.m. to 4:00 p.m. Monday through Friday. For construction details please contact Jed Fritz at 267-907-5932 or on-scene work vessels via marine radio VHF-FM 13/16. Mariners are advised to exercise caution when transiting the area. Position 40-41.72N 074-07.07W USCG Northeast District Local Notice to Mariners 45/2026 KILL VAN KULL - NEWARK BAY General / Bridges / Construction Construction has commenced to replace NJ Turnpike Authority’s Newark Bay Bridge over Newark Bay at mile 3.8 between Newark and Bayonne NJ. From August 17, 2026, through November 30, 2027, contractors will be constructing a work trestle from the Newark shore of Newark Bay to the navigable channel. This work will not impede the navigable channel. Work hours will be 5:00 a.m. to 6:00 p.m. Monday through Saturday. For construction details please contact the project superintendent at 731-614-7153 or on-scene work vessels via marine radio VHF-FM 13/16. Mariners are advised to exercise caution when transiting the area. Position 40-41.72N 074-07.07W USCG Northeast District Local Notice to Mariners 45/2026 EAST PASSAGE - NEWPORT HARBOR General / Marine Events / Regatta (Race) RI – NARRAGANSETT BAY– MITCHELL REGATTA SPRING EDITION – RACE/REGATTA Mariners are advised that the Mitchell Regatta Spring Edition is scheduled to be held from west of Goat Island and south of Rose Island, RI to New Harbor, Block Island, RI. The event will take place on Saturday May 23, 2026, from 9:00 a.m. to 6:00 p.m. Expect up to 20 sailing vessels, 20-60 ft in length. Mariners are advised to transit the area with extreme caution. Mariners may contact the person in charge on VHF channel 72 or by phone at (401) 529-5699. USCG Northeast District Local Notice to Mariners 45/2026 BEACH CHANNEL - NORTH CHANNEL General / Bridges / Inspection Location: 40-38.52N 073-50.07W Bridge Name: Cross Bay Blvd Bridge NEW YORK – JAMAICA BAY - Bridge Inspections – From July 28, 2026 to November 30, 2026, a barge will be performing underdeck bridge inspections at the Cross Bay Blvd Bridge across Jamaica Bay at mile 10.0. Mariners requiring full vertical and horizontal clearance can contact the contractor via marine radio VHF-FM Ch 13/16 or call Luis Monroe at (646) 460-3880 or Minas Lyristis at (863) 326-3750. Mariners are advised to exercise caution and reduce wake when transiting the area. Valid 2026-07-16 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 BEACH CHANNEL - NORTH CHANNEL General / Bridges / Inspection Location: 40-37.33N 073-53.79W Bridge Name: Belt Pkwy Bridge From August 24, 2026, to December 30, 2026, between 9:00 am to 3:00 pm, a barge with manlift and tug boat #NY8360GY will be utilized to inspect the Belt Parkway Bridge across Paerdegat Basin at mile 0.2, in Brooklyn, NY. Mariners requiring full horizontal clearance can contact the contractor via marine radio VHF-FM Ch 13/16 or by calling (917) 306-0152. Mariners are advised to exercise caution and reduce wake when transiting the area. Valid 2026-08-24 to 2027-01-01. USCG Northeast District Local Notice to Mariners 45/2026 NORTH CHANNEL General / Bridges Location: 40-38.31N 073-52.71W Bridge Name: Belt Pkwy Bridge From October 19, 2026 through December 30, 2026, between 9:00 a.m. and 3:00 p.m., contractors will be utilizing a barge with a 60’ manlift under the Belt Parkway Bridge over Fresh Creek at mile 0.4 to perform bridge inspection. The barge will be moved out of the navigable channel after work hours or when not in use. Mariners requiring full clearance can contact the contractor via marine radio VHF-FM Ch. 13/16 or call Rajesh Subedi at (929) 471-3140. Mariners are advised to exercise caution when transiting the area. Valid 2026-10-13 to 2026-12-31. USCG Northeast District Local Notice to Mariners 45/2026 LONG ISLAND SOUND EASTERN PART - NORTH CHANNEL SAYBROOK TO NEW HAVEN General / Marine Construction (Excluding Bridges) / Dredging Location: 41-15.88N 072-45.95W Mariners are advised that, in compliance with Department of the Army Permit No. NAE-2021-03025, Tilcon Connecticut, Inc. plans to conduct maintenance dredging at 1 Forest Road, Branford, Connecticut, within Long Island Sound. The work is expected to commence and be completed in October 2026, within the regulatory dredging window of October 1 through December 31. Operations will involve mechanical maintenance dredging of approximately 65,600 cubic yards of material over an area of approximately 21 acres. Dredging will be conducted to a depth of minus 15.5 feet mean low water, with 1 foot of allowable overdepth, in the Barge Basin, and to a depth of minus 17 feet mean low water, with 1 foot of allowable overdepth, in the Access Channel. Dredged material will be disposed of at the Central Long Island Sound Disposal Site. The approximate central coordinates of the work are 41-15.88N 072-45.95W. The activity is not located in the vicinity of a federal navigation channel, and no temporary buoys, lights, ranges, or markers are proposed to be established, moved, or discontinued in association with the project. Mariners transiting the area are requested to exercise caution and avoid interfering with dredging operations. For questions or additional information, contact William Heiple at [email protected] or 203-631-7563. Valid 2026-10-01 to 2026-12-31. USCG Northeast District Local Notice to Mariners 45/2026 GREAT SOUTH BAY - NORTH SIDE General / Hazards To Navigation / Shoaling Reported NY-SAYVILLE-BROWNS CREEK Mariners be advised, dangerous shoaling conditions exist east of Browns Creek and vicinity which cause dangerous conditions when transiting the channel. Mariners should exercise extreme caution when navigating the channel. Valid 2024-09-13 to 2039-11-12. USCG Northeast District Local Notice to Mariners 45/2026 NORWALK EAST APPROACH - NORWALK CHANNEL General / Bridges / Construction Location: 41-06.03N 073-24.93W Bridge Name: Walk Bridge CONNECTICUT – NORWALK RIVER - General Construction – Connecticut Department of Transportation will continue work of the new Walk Bridge over the Norwalk River at mile 0.1 beginning May 1, 2026 through December 31, 2030. The contractor will utilize work boats & barges in one channel (either East or West) at a time leaving the unoccupied side available for mariners to transit with assistance of Norwalk Marine Police. Message signs will be installed along the North Side or South Side of Walk Bridge to direct marine traffic accordingly to the open channel. Contractors will be transiting barges to and from Manresa Island frequently throughout the project. Mariners are advised to exercise caution and reduce wake when transiting the area as barges may move between the channels at times throughout the day. Mariners with questions or concerns can contact the contractor via marine radio VHF-FM Ch 13/16 or call Matthew Damore (978)-621-7937 or Jason Rourke (860) 250-1020. Valid 2026-04-29 to 2031-01-01. USCG Northeast District Local Notice to Mariners 45/2026 HACKENSACK RIVER - PASSAIC RIVER General / Bridges / Rehabilitation Location: 40-44.52N 074-07.36W Bridge Name: NJ Tpke Bridges Rehabilitation at the New Jersey Turnpike (Laderman) Bridge across Passaic River at mile 2.7 will commence on May 1, 2025. A safe span will be installed under the bridge across the entire span which will reduce the vertical clearance by approximate 3ft. Please contact Frank Duba of Ferreira Construction at 908-331-4630 or via marine radio VHF-FM CH 13/16 for bridge construction. This project will be completed by December 31, 2027. Mariners are advised to exercise caution when transiting the area. Valid 2025-05-01 to 2027-12-31. USCG Northeast District Local Notice to Mariners 45/2026 HACKENSACK RIVER - PASSAIC RIVER General / Bridges / Maintenance Location: 40-43.94N 074-07.06W Bridge Name: Route 1 and 9 -Lincoln Hwy Bridge Repairs to the Route 1 and 9 Lincoln Highway Bridge across the Passaic River at mile 1.8 will commence on March 2, 2026, through November 27, 2026. Hours of operation are from 7 a.m. to 3:30 p.m. EST Monday through Friday. A barge may perform work on the bridge piers from within the navigable channel adjacent to the fender. However, at no time will the work area constitute more than 50% of the channel width. Should a vessel need to transit an area of the channel where work is occurring the barge will be moved out of the channel with proper notification (four hours). Channels 13/16 will be monitored on VHF-FM radios. Mariners requiring full vertical clearance and can contact Sean Milachouski – Project Manager 201-675-1553 or Conor Teesdale – Director of Operations 609-694-5938. This project will be completed by November 27, 2026. Mariners are advised to use caution and reduce wake when transiting the area. Valid 2026-03-02 to 2026-11-27. USCG Northeast District Local Notice to Mariners 45/2026 HACKENSACK RIVER - PASSAIC RIVER General / Bridges / Public Notice Location: 40-44.71N 074-09.94W Bridge Name: Bridge St Bridge Essex County Department of Public Works (ECDPW) proposes to replace the Bridge Street Bridge across the Passaic River, between the City of Newark and Township of Harrison, Essex and Hudson Counties, New Jersey. The Public Notice solicits public comment on the proposed vertical and horizontal clearances. Interested parties are requested to provide input to the Coast Guard on the impacts to navigation of the proposed clearances. Comments may be submitted to Commander (dpb), First Coast Guard District Bridge Branch at the address on the Public Notice, or by email to [email protected] through December 5, 2026. Valid 2026-10-15 to 2026-12-05. USCG Northeast District Local Notice to Mariners 45/2026 HACKENSACK RIVER - PASSAIC RIVER General / Hazards To Navigation / Shoaling Reported Shoaling has been reported, 5 to 10 ft water depths (MLLW), within the area of the old center pier fender system of the Point-No-Point Bridge (mile 2.6) over the Passaic River, within the area bound by the following approx. coordinates: 40°44'29.34"N, 074°7'13.42"W 40°44'29.24"N, 074°7'13.92"W 40°44'29.93"N, 074°7'15.95"W 40°44'30.32"N, 074°7'15.66"W 40°44'29.59"N, 074°7'13.65"W. Valid 2026-05-26 to 2031-04-30. USCG Northeast District Local Notice to Mariners 45/2026 PORTSMOUTH TO CAPE ANN - PLUM ISLAND SOUND General / Hazards To Navigation / Shoaling Reported Shoaling exists in Plum Island Sound between Plum Island Sound Entrance buoy 4 (LLNR 9310) and Plum Island Sound Entrance buoy 6 (LLNR 9320), aids are not properly marking best water. Mariners are advised to use caution while navigating this area. All of Plum Island is particularly susceptible to shoaling, the area between 4 and 6 being the worst at the mouth of the channel. Last year the unit partnered with the harbor Master moving the aids to mark the best water. Even though the aids are in the best possible locations that water is still shallow at low tide and mariners should use caution while navigating in this area USCG Northeast District Local Notice to Mariners 45/2026 PORTSMOUTH TO CAPE ANN - PLUM ISLAND SOUND General / Hazards To Navigation / Shoaling Reported Newburyport Harbor and Plum Island Sound – Plum Island Sound Entrance has experienced an increase in shoaling between Plum Island Sound Entrance Buoy 6 and 8. The shoaling was observed in approx. position 42-41.365N /070-45.169W and extends 100 yards west following the channel. Mariners are advised that at MLLW depths of 3' could be seen. Mariners without local knowledge are advised to transit with extreme caution and monitor tidal stations prior to transiting. USCG Northeast District Local Notice to Mariners 45/2026 WEST PASSAGE - POINT JUDITH HARBOR OF REFUGE General / Hazards To Navigation / Obstructions Blue Acres Aquaculture will conduct seaweed aquaculture operations in the Harbor of Refuge, Point Judith, Narragansett, Rhode Island, from November 1, 2026, through May 1, 2027. The aquaculture site is bounded by the following approximate positions: 41°21'33.95" N, 071°30'29.95" W; 41°21'24.95" N, 071°30'34.67" W; 41°21'32.23" N, 071°30'25.88" W; and 41°21'23.14" N, 071°30'30.46" W. Mariners are advised of anchors, buoys, and lines associated with the operation and are urged to exercise caution when transiting the area Valid 2026-11-04 to 2027-05-03. USCG Northeast District Local Notice to Mariners 45/2026 WEST PASSAGE - POINT JUDITH HARBOR OF REFUGE ATON / Proposed Notice of Change Location: 41-21.62N 071-29.84W Action: RENAME Change Aid Name from Point Judith Harbor of Refuge East Entrance Lighted Buoy 3 LLNR: 19491 to Point Judith Harbor of Refuge East Entrance Lighted Buoy 3E LLNR: 19491 Valid 2026-09-30 to 2027-03-29. USCG Northeast District Local Notice to Mariners 45/2026 POINT JUDITH HARBOR OF REFUGE - POINT JUDITH POND General / Hazards To Navigation / Shoaling Reported RI-BLOCK ISLAND SOUND AND APPROACHES (CHART 13205)-POINT JUDITH POND Shoaling has been observed within the channel to a least depth of 4.0 feet MLW in approximate position 41 22'48"N, 071 33'55"W between Point Judith Pond Channel Buoy 2 (LLNR 19555) and Point Judith Pond Channel Buoy 4 (LLNR 19560). Shoal is encroaching from the East side of the channel and protruding west. Shoaling has also been identified in several other areas north of buoy 2, below charted depth, extending into the upper pond. Mariners without local knowledge are advised to transit with extreme caution, paying particular attention to tidal range. Mariners are urged to use caution while transiting the area. Valid 2024-09-12 to 2039-10-11. USCG Northeast District Local Notice to Mariners 45/2026 MAIN CHANNEL - PORT JERSEY CHANNEL General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 40-00.15N 074-04.50W Trevcon Construction Company, LLC. Will be conducting installation of Steel Pile Piles & Steel Beams / Structural Concrete Work / Concrete Pile Repair Work & Underdeck Concrete Repairs at the Port Liberty Container Terminal, in position 40-40.15N 074-04.51W, from March 1, 2026, to February 28, 2027, between 5:00am to 7:00pm. Equipment on scene will be Two Barge (180’ x 60’), Two Barges (140’ x 50’), One Barge (90’ x 30’), All moving of vessels to occur by tugboat; vessels will be moved at all times of day and night. Valid 2026-01-29 to 2027-03-01. USCG Northeast District Local Notice to Mariners 45/2026 NEWARK BAY - PORT NEWARK PIERHEAD CHANNEL General / Marine Construction (Excluding Bridges) / Boring and Core Samples Aqua Survey, Inc. will conduct sediment sampling in the Newark Bay Federal Navigation Channel, Newark, NJ, from November 9 through November 25, 2026. Operations will occur Monday through Friday, from 8 a.m. to 4 p.m. Vessels R/V TESLA and R/V PRATTIS will be on scene and monitoring VHF-FM Channels 13 and 16. The vessels can move on demand to avoid impeding navigation. Mariners are requested to exercise caution when transiting the area. Valid 2026-11-14 to 2027-01-16. USCG Northeast District Local Notice to Mariners 45/2026 PORTLAND HARBOR APPROACH - PORTLAND HARBOR General / Hazards To Navigation / Shoaling Reported Shoaling has been reported in the inner harbor of Casco Bay’s federal channel. Shoaling could impede the approach to the Gulf Oil Terminal in South Portland, and significantly reduces the available channel where large passenger ships regularly maneuver on and off berths in Portland. Deep draft vessels are advised to use caution when transiting the area. Valid 2024-08-30 to 2030-02-26. USCG Northeast District Local Notice to Mariners 45/2026 PORTLAND HARBOR APPROACH - PORTLAND HARBOR General / Marine Events / Regatta (Race) ME – CASCO BAY/GULF OF MAINE – FALMOUTH – Sailboat Race Mariners are advised that the Monhegan Island Race and Seguin Sprint is scheduled to start South of Clapboard Island and finish outside Portland Headlight. The longer Monhegan Course (150 nm) will start Friday at 3:00 pm and the shorter Seguin Island Race (55 nm) will start on Saturday at 1:00 pm. Both fleets are estimated to finish between Saturday night 8:00 pm and Sunday 10:00 pm. Approximately thirty-five 24’-60’ sailboats participating. The event will take place in Casco Bay, Maine. Chart number: 13288. For event information: Greg Carville, (207) 272-2300. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR NORTHERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - PORTLAND HARBOR APPROACH General / Hazards To Navigation / Hazards Location: 43-37.05N 070-04.38W An unexploded ordnance has been identified at position 43°37'03.180" N, 070°04'22.800" W, in approximately 36 meters of water. Mariners are advised to exercise extreme caution when transiting the vicinity and to refrain from anchoring, bottom trawling, ground fishing, or otherwise disturbing the seabed within the area. Valid 2026-11-02 to 2027-05-01. USCG Northeast District Local Notice to Mariners 45/2026 PORTLAND TO MEREPOINT - PORTLAND TO YARMOUTH General / Marine Events / Regatta (Race) ME –PYC Pilot Regatta – Falmouth – Regatta Mariners are advised that the PYC Regatta is scheduled to be held around Casco bay and Clapboard Island near the vicinity of Falmouth, ME. The event will be held from 12:00 p.m. to 06:00 p.m. on July 11-12, 2026. Chart number: 13260. For event information contact: Bill Conners (207)841-8534. USCG Northeast District Local Notice to Mariners 45/2026 BOSTON NORTH CHANNEL - PRESIDENT ROADS General / Bridges / Repairs, Painting, Or Fender Replacement Location: 42-22.10N 071-04.43W MASSACHUSETTS – BOSTON INNER HARBOR – LOWER CHARLES RIVER –BROAD CANAL DRAWBRIDGE – Bridge Repairs Mariners are advised that SPS New England Inc will be conducting bridge repairs and structural steel replacement on the Broad Canal Bridge in the Lower Charles River basin. Bridge repair operations will commence on May 11, 2026, and continue through December 1, 2026. Work Hours will be Monday through Friday for 8 hours per day varying between day and night shifts subject to Mass DOT approval. On scene equipment will consist of a push boat and a 20' x 50' Barge. The equipment will be staged in the navigable channel during work hours, reducing the horizontal clearance of the channel to 20 feet. Vessels requiring the entire 40-foot navigable channel are asked to provide 24-hour advanced notification to the on-scene contractor. All support vessels and work barges will be staged outside the navigable channel during non-working hours. For more information, mariners may contact SPS New England Marine Manager Mr. Greg Bashaw at (978) 360-0262 or the project manager Mr. Andrew Chamberland at (508) 328-8828. On-scene support vessel will be monitoring VHF-FM Ch 13. Mariners are advised to use caution and transit at slow speed to minimize wake when transiting the area. Valid 2026-05-11 to 2026-12-01. USCG Northeast District Local Notice to Mariners 45/2026 BOSTON NORTH CHANNEL - PRESIDENT ROADS General / Bridges / Repairs, Painting, Or Fender Replacement Location: 42-22.80N 071-03.11W Bridge Name: Chelsea St Bridge MA - BOSTON INNER HARBOR – LITTLE MYSTIC – CHELSEA STREET BRIDGE- Bridge Painting and Repairs Mariners are advised that SPS New England will be conducting Bridge painting and maintenance to the Chelsea Street Bridge mile 0.2 across thew Little Mystic channel. Work will commence on Monday September 14, 2026, and continue through Saturday November 21,2026. Work hours will be from 7:00 a.m. to 7:00 p.m. Monday through Saturday. All work will be conducted from a suspended work platform beneath the bridge which will remain in place outside of working hours reducing the advertised vertical and horizontal clearances. Half of the navigational channel will be maintained for vessel passage. On-scene safety vessel will be monitoring VHF-FM Ch 13. POC Mr. Rick Williams (978) 417-9806 Questions may be directed to the City of Boston Public Works at (617) 635-2220 or Mr. Spencer Kresge (508) 932-7254. Mariners are advised to use caution and plan their transits accordingly. Valid 2026-11-04 to 2026-11-22. USCG Northeast District Local Notice to Mariners 45/2026 BOSTON NORTH CHANNEL - PRESIDENT ROADS General / Marine Construction (Excluding Bridges) / Boring and Core Samples Location: 42-20.77N 071-01.38W 42-20.73N 071-01.38W 42-20.72N 071-01.51W 42-20.74N 071-01.51W 42-20.77N 071-01.38W MASSACHUSETTS – BOSTON – BOSTON INNER HARBOR – NORTH JETTY- Jetty Boring Operations Mariners are advised that Childs Engineering and Ocean Surveys Inc will be conducting core sampling in the vicinity of the North Jetty from November 3, 2026, through November 13, 2026. Work hours will be from 6:30 a.m. to 4:30 p.m. daily. On scene equipment will consist of a 40’ x 10’ pontoon barge anchored over core sampling sites. Questions may be directed to Childs Engineering at (617) 549-5629. On scene vessel will be monitoring VHF-FM CH 69. Mariners are advised to proceed with caution at slowest speed possible to minimize wake. Valid 2026-11-06 to 2026-11-14. USCG Northeast District Local Notice to Mariners 45/2026 BOSTON NORTH CHANNEL - PRESIDENT ROADS General / Marine Events / Regatta (Race) MA – BOSTON – BOSTON INNER HARBOR – BOSTON SAILING CENTER SATURDAY FROSTBITE RACING SERIES – REGATTA – The Boston Sailing Center is hosting the Boston Sailing Center Saturday Frostbite Racing Series every Saturday, from 12:00 PM to 3:00 PM from November 7, 2026, to March 20, 2027, in and around the vicinity of Fan Pier, Boston Inner Harbor. The event will consist of approximately 14 sailing vessels 24’ in length with 1 support craft. The person responsible for on-scene safety can be reached on VHF CH 13 by hailing the BSC Race Committee Boat. Races will not run on the following Saturdays; November 28, 2026, December 26, 2026, January 2, 2027 and February 13, 2027. For more information, please contact Dave Bryan at 617-227-4198. Chart 13272 USCG Northeast District Local Notice to Mariners 45/2026 BOSTON NORTH CHANNEL - PRESIDENT ROADS General / Marine Events / Fireworks MA - BOSTON – BOSTON INNER HARBOR - BOSTON CELEBRATION NEW YEARS EVE FIREWORKS – FIREWORKS – Pyrotecnico is hosting the Boston Celebration New Years Eve Fireworks on December 31, 2026, from 11:55 PM to 00:15 AM on January 01, 2027. There is a 350’ yard safety around a fireworks barge off Long Wharf in approximate position 420 21.7.’N 0710 02.6’W. The person responsible for on scene safety can be reached at 603-494-2318. For more information, please contact Tara Hughgill at 603-235-4656. USCG Northeast District Local Notice to Mariners 45/2026 PROVIDENCE RIVER APPROACH - PROVIDENCE RIVER General / Bridges / Inspection Location: 41-49.08N 071-24.22W Bridge Name: Point St Bridge From November 16, 2026, to November 20, 2026, between 8:00 am to 4:00 pm, a 28’ aqualift CAT (CT0790BL) will be utilized to inspect Point Street Bridge across Providence River at mile 7.5, in Providence, RI. Mariners requiring full horizontal clearance can contact the contractor via marine radio VHF-FM Ch 13/16 or by calling (410) 294-6092 or (207) 356-0242. Mariners are advised to exercise caution and reduce wake when transiting the area. Valid 2026-11-16 to 2026-11-21. USCG Northeast District Local Notice to Mariners 45/2026 PROVIDENCE RIVER APPROACH - PROVIDENCE RIVER General / Marine Events / Regatta (Race) RI – PROVIDENCE RIVER – RIYC 2026 GASPEE REGATTA – RACE/REGATTA Mariners are advised that the RIYC 2026 Gaspee Regatta is scheduled to be held in multiple areas to include Providence River, Rhode Island Yacht Club, Rumstick Neck Reach, Rumstick Point. The event will take place on Sunday June 14, 2026 from 1:00 p.m. to 4:00 p.m. Expect up to 15 sailing vessels, 25-42 ft in length. Mariners are advised to transit the area with extreme caution. Mariners may contact the person in charge by phone at (401) 474-4769. USCG Northeast District Local Notice to Mariners 45/2026 SHINNECOCK BAY - QUANTUCK CANAL General / Bridges / Rehabilitation Location: 40-48.74N 072-38.05W Bridge Name: Turkey Bridge Suffolk County Department of Public Works will perform rehabilitation on the Turkey Bridge across Aspatuck Creek at mile 0.2, between Westhampton Beach and Quogue, NY. Contractor, Posillico, will be conducting this work beginning October 12, 2026 through September 20, 2027, between 7am and 3:30pm. Contractors will be utilizing barges that will reduce the horizontal clearance to 37’. Mariners requiring full horizontal clearance can contact the contractor with 24-hour notice via marine radio VHF-FM CH 13/16 or call Michael DiNapoli at (516) 982-3845. Mariners are advised to exercise caution when transiting the area. Valid 2026-09-29 to 2027-09-30. USCG Northeast District Local Notice to Mariners 45/2026 SWASH CHANNEL - RARITAN BAY General / Marine Construction (Excluding Bridges) / Survey Operations Location: 40-30.62N 073-56.97W 40-29.87N 073-56.97W 40-29.87N 073-58.44W 40-30.62N 073-58.44W 40-30.62N 073-56.97W Mariners are advised that S. T. Hudson Engineers, Inc. will conduct geotechnical surveys from approximately November 4 through 25, 2026, in Raritan Bay outside the limits of Ambrose Channel, in the vicinity of buoys Green 7, Red 8, Green 9, and Red 10. Operations will occur 24 hours a day, seven days a week. The liftboat NORTHSTAR VOYAGER, a 145-foot jack-up vessel equipped with a coring rig, will be spudded down at fixed boring locations and unable to maneuver. The crew boat NORTHSTAR INTERCEPTOR will support operations. Mariners are urged to use caution, maintain a safe distance, reduce speed, and contact the vessels on VHF Channels 13, 14, or 16 for passing arrangements. Valid 2026-10-15 to 2026-11-06. USCG Northeast District Local Notice to Mariners 45/2026 SWASH CHANNEL - RARITAN BAY General / Marine Events / Regatta (Race) NY/NJ– LOWER NY BAY – RARITAN BAY – Sailing Regatta Mariners are advised that regattas are scheduled to be held on Raritan Bay. Races will take place every Wednesday, Friday, most Saturdays, some Sundays and Holidays from May 5, 2026 through January 7, 2027 at various times stipulated in the table below. Approximately 30 sailboats 12-45 feet in length will participate in short-distance courses. Interested mariners may contact the Principal Race Officer on marine band radio channel 9 or 71 VHF-FM or via telephone at 203-509-1469. Valid 2026-05-06 to 2026-11-02. USCG Northeast District Local Notice to Mariners 45/2026 SWASH CHANNEL - RARITAN BAY General / Marine Events / Regatta (Race) General/Marine Events/Regatta (Race) 1. NARRATIVE: THE RARITAN YACHT CLUB WILL HOLD REGATTAS IN THE RARITAN BAY FROM MAY 6, 2026 AND CONTINUING UNTIL JANUARY 7, 2026. THESE REGATTAS WILL INCLUDE APPROXIMATELY 30 SAILBOATS 15-45 FEET IN LENGTH. 2. NEW JERSEY - RARITAN BAY - A REGATTA WILL TAKE PLACE EVERY WEDNESDAY, FRIDAY, MOST SATURDAYS, SOME SUNDAYS AND HOLIDAYS FROM JUNE 10, 2026 THROUGH DECEMBER 26, 2026 APPROXIMATELY 30 SAILING VESSELS 15-45 FEET IN LENGTH WILL PARTICIPATE IN RACES THROUGHOUT THE RARITAN BAY. VARIOUS MOTORIZED VESSELS WILL BE ASSISTING WITH THE EVENT. INTERESTED MARINERS MAY CONTACT THE PRINCIPAL RACE OFFICER ON CHANNEL 9 OR 71 VHF-FM OR VIA TELEPHONE AT 203-509-1469. 3. SECNY BROADCAST WITH REGULARLY SCHEDULE BROADCAST DURING THE DATES OF EVENT: A. 10 - JUNE - 26 FROM 6:15 P.M. TO 7:30 P.M. B. 12 - JUNE - 26 FROM 6:00 P.M. TO SUNSET C. 14 - JUNE - 26 FROM 6:15 P.M. TO 7:30 P.M. D. 17 - JUNE - 26 FROM 6:00 P.M. TO SUNSET E. 19 - JUNE - 26 FROM 2:30 P.M. TO 4:30 P.M. F. 20 - JUNE - 26 FROM 6:15 P.M. TO 7:30 P.M. G. 20 - JUNE - 26 FROM 6:00 P.M. TO SUNSET H. 24 - JUNE - 26 FROM 3:00 P.M. TO 5:00 P.M. I. 26 - JUNE - 26 FROM 3:00 P.M. TO 5:00 P.M. J. 28 - JUNE - 26 FROM 6:15 P.M. TO 7:30 P.M. K. 01 - JULY - 26 FROM 6:00 P.M. TO SUNSET L. 03 - JULY - 26 FROM 2:00 P.M. TO 4:00 P.M. M. 04 - JULY - 26 FROM 1:00 P.M. TO 3:00 P.M. N. 08 - JULY - 26 FROM 6:00 P.M. TO SUNSET O. 10 - JULY - 26 FROM 6:15 P.M. TO 7:30 P.M. P. 11 - JULY - 26 FROM 10:00 A.M. TO 12:00 P.M. Q. 12 - JULY - 26 FROM 6:00 P.M. TO SUNSET R. 15 - JULY - 26 FROM 11:00 A.M. TO 5:00 P.M. T. 17 - JULY - 26 FROM 11:00 A.M. TO 5:00 P.M. U. 18 - JULY - 26 FROM 6:15 P.M. TO 7:30 P.M. V. 19 - JULY - 26 FROM 6:00 P.M. TO SUNSET W. 19 - JULY - 26 FROM 3:00 P.M. TO 5:00 P.M. X. 22 - JULY - 26 FROM 3:00 P.M. TO 5:00 P.M. Y. 24 - JULY - 26 FROM 6:15 P.M. TO 7:30 P.M. Z. 25 - JULY - 26 FROM 6:00 P.M. TO SUNSET AA. 29 - JULY - 26 FROM 2:00 P.M. TO 4:00 P.M. BB. 31 - JULY - 26 FROM 6:15 P.M. TO 7:30 P.M. CC. 01 - AUGUST - 26 FROM 6:00 P.M. TO SUNSET DD. 02 - AUGUST - 26 FROM 6:15 P.M. TO 7:30 P.M. EE. 05 - AUGUST - 26 FROM 6:00 P.M. TO SUNSET FF. 07 - AUGUST - 26 FROM 6:15 P.M. TO 7:30 P.M. GG. 12 - AUGUST - 26 FROM 6:00 P.M. TO SUNSET HH. 14 - AUGUST - 26 FROM 6:15 P.M. TO 7:30 P.M. II. 19 - AUGUST - 26 FROM 6:00 P.M. TO SUNSET JJ. 21 - AUGUST - 26 FROM 3:00 P.M. TO 5:00 P.M. KK. 22 - AUGUST - 26 FROM 3:00 P.M. TO 5:00 P.M LL. 22 - AUGUST - 26 FROM 6:15 P.M. TO 7:30 P.M. MM. 26 - AUGUST - 26 FROM 6:00 P.M. TO SUNSET NN. 28 - AUGUST - 26 FROM 10:00 A.M. TO 12:00 P.M. OO. 29 - AUGUST - 26 FROM 1:00 P.M. TO 3:00 P.M. PP. 30 - AUGUST - 26 FROM 6:15 P.M. TO 7:30 P.M. QQ. 02 - SEPTEMBER - 26 FROM 6:15 P.M. TO 7:30 P.M. RR. 07 - SEPTEMBER - 26 FROM 11:00 A.M. TO 5:00 P.M. SS. 09 - SEPTEMBER - 26 FROM 11:00 P.M. TO 5:00 P.M. TT. 16 - SEPTEMBER - 26 FROM 6:15 P.M. TO 7:30 P.M. UU. 19 - SEPTEMBER - 26 FROM 6:15 P.M. TO 7:30 P.M. VV. 20 - SEPTEMBER - 26 FROM 6:15 P.M. TO 7:30 P.M. WW. 23 - SEPTEMBER - 26 FROM 6:15 P.M. TO 7:30 P.M. XX. 27 - SEPTEMBER - 26 FROM 10:00 A.M. TO 12:00 P.M. YY. 30 - SEPTEMBER - 26 FROM 6:15 P.M. TO 7:30 P.M. ZZ. 03 - OCTOBER - 26 FROM 6:15 P.M. TO 7:30 P.M. AAA. 07 - NOVEMBER - 26 FROM 11:00 A.M. TO 1:00 P.M. BBB. 14 - NOVEMBER - 26 FROM 11:00 A.M. TO 1:00 P.M. CCC. 21 - NOVEMBER - 26 FROM 11:00 A.M. TO 1:00 P.M. DDD. 28 - NOVEMBER - 26 FROM 11:00 A.M. TO 1:00 P.M. EEE. 05 - DECEMBER - 26 FROM 11:00 A.M. TO 1:00 P.M. FFF. 12 - DECEMBER - 26 FROM 11:00 A.M. TO 1:00 P.M. GGG. 19 - DECEMBER - 26 FROM 11:00 A.M. TO 1:00 P.M. HHH. 26 - DECEMBER - 26 FROM 11:00 A.M. TO 1:00 P.M. USCG Northeast District Local Notice to Mariners 45/2026 RARITAN RIVER CUTOFF CHANNEL - RARITAN RIVER General / Bridges / Construction Construction and demolition operations to replace the Raritan River Railroad Bridge commenced on April 1, 2026, and will continue through January 18, 2030. A channel closure is tentatively scheduled for the week of November 30, 2026. The actual closure date will be weather dependent and communicated with local mariners as the operation gets closer. Operations through December 2026 include counterweight Installation at both piers. A number of barges and support vessels will be moored outside the navigational channel. Due to ongoing construction activities, mariners will be unable to use the south navigational channel. Work hours for this project are 7:00 a.m. to 3:30 p.m. Monday -Friday. Mariners are advised to exercise caution and reduce wake when transiting the area. For more detailed information about the positioning of marine equipment, marker buoys and temporary works contact Project Engineer at 718 702-7238. Position 40-29.78N 074-16.82W USCG Northeast District Local Notice to Mariners 45/2026 RARITAN RIVER CUTOFF CHANNEL - RARITAN RIVER General / Bridges / Public Notice The TIR published in the Federal Register at https://www.govinfo.gov/content/pkg/FR-2026-05-05/pdf/2026-08733.pdf. Comments and related material must be received by the Coast Guard on or before August 3, 2026. This establishes a RNA from 12:01 a.m. on April 15, 2026, until 11:59 p.m. on June 30, 2030. ADDRESSES: You may submit comments at https://www.regulations.gov. See the ‘‘Public Participation and Request for Comments’’ portion of the SUPPLEMENTARY INFORMATION section for further instructions on submitting comments. To view available documents go to https://www.regulations.gov and search for USCG–2026–0149. --165.T01-0149 Regulated Navigation Area (RNA); (a)Location. See MSI LNM Layer. (c) In addition to the general RNA regs in § 165.13, the following regs apply to the RNA. (1) Nothing in this regulation relieves any vessel, owner, operator, charterer, master, or person directing the movement of a vessel, from the consequences of any neglect to comply with this part or any other applicable law or regulation (i.e. the International Regulations for Prevention of Collisions at Sea, 1972 (72 COLREGS) or 33 CFR part 84-Subchapter E, Inland Navigation Rules) or of the neglect of any precaution which may be required by the ordinary practice of seamen, or by the special circumstances of the case. (2) Entry and movement within the RNA is subject to a “Slow-No Wake” speed limit. All vessels may not produce a wake and may not attain speeds greater than five (5) knots unless a higher minimum speed is necessary to maintain bare steerageway. (3) No vessel is permitted to transit through the south span navigational channel of the bridge(s) at any given time. (4) Any vessel transiting through the RNA must make a direct passage. No vessel may stop, fish, moor, anchor, or loiter within the RNA at any time. (5) Vessels may not pass (overtake) another vessel within the RNA. (6) Only one vessel is permitted to pass through the north span navigational channel of the bridge(s) at any given time. (7) Except when transiting through the north span navigation channel, no vessel or craft may operate within 20 feet of the bridge(s). (8) The operator of any vessel transiting in the RNA must comply with all lawful directions given to them by the COTP or the COTP's on-scene representative. (9) When a full enforcement period of the regulated area is activated, only vessel authorized by COTP may enter or remain within the RNA. (d) Enforcement. The following enforcement periods and requirements apply to this RNA. (1) This section enforced from 12:01 a.m. on 15Apr2026, to 11:59 p.m. on 30Jun2030. (2) The “Slow-No Wake” speed limit, south channel closure, and other restrictions-except for the limited full enforcement period prohibiting vessels from entering the regulated area-will be enforced throughout the entire enforcement period. (3) Full enforcement periods of the regulated area, prohibiting all vessel entry, will be enforced only during hazardous construction operations involving multiple tugs and large barges maneuvering in and obstructing the navigable channel for heavy lift, construction, or demolition activities. The USCG will issue information on full enforcement periods through LNMs, the CG Navigation Center at https://www.navcen.uscg.gov/msi, and BNMs via VHF CH 16 as soon as practicable. (4) Persons or vessels seeking to deviate from the restrictions described in section (c) of this section or to enter the regulated area during a full enforcement period must request authorization from the COTP or COTP’s on-scene designated representative on VHF-16 or via (718) 354-4353. Enforcement periods prohibiting vessels from entering the RNA planned during the following approx. dates (subject to change): Jul-Aug2026, two separate 1-day full-chnl closures Jul2027-Jun2028, three, 7-day full chnl closures Jan-Sep2028, one 30-day full chnl closure Jul-Sep2029, one 14-day full chnl closure Dates/times provided when available. USCG Northeast District Local Notice to Mariners 45/2026 RARITAN RIVER CUTOFF CHANNEL - RARITAN RIVER General / Marine Construction (Excluding Bridges) / Boring and Core Samples Location: 40-30.01N 074-16.98W Mariners are advised that from November 2 through November 23, 2026, marine construction and environmental sampling operations will be conducted on the Raritan River near Perth Amboy, New Jersey, in approximate position 40-30.008N, 074-16.980W. Operations will involve a spud barge equipped with a GeoProbe 5400 rig, or a workboat with a smaller support vessel, conducting well point testing and installation, retrieval, and testing of sediment bed samplers. Work will occur daily from 7 a.m. to 5 p.m. Vessels will operate near the edge of the navigation channel and can generally move upon request; however, mariners should anticipate a 30- to 60-minute delay during certain sampling activities. Mariners are requested to exercise caution and contact on-scene vessels on VHF Channels 13 or 16. Valid 2026-11-02 to 2026-11-24. USCG Northeast District Local Notice to Mariners 45/2026 RARITAN RIVER CUTOFF CHANNEL - RARITAN RIVER General / Marine Construction (Excluding Bridges) / Boring and Core Samples Mariners are advised that Aqua Survey, Inc. will conduct sediment-sampling operations in the vicinity of Ward Point Bend, Raritan Bay, Staten Island, NY, from November 2 through November 20, 2026. Operations will occur Monday through Friday from 8 a.m. to 4 p.m. using the vessels R/V Tesla and R/V Prattis. The vessels will monitor VHF Channels 13 and 16 and can move on demand to avoid impeding navigation. Mariners should use caution, proceed at a safe speed, and provide adequate clearance when transiting the area. Valid 2026-11-02 to 2026-11-14. USCG Northeast District Local Notice to Mariners 45/2026 REYNOLDS CHANNEL General / Bridges / Maintenance General/Bridges/Maintenance NEW YORK – HENDRIX CREEK - Bridge Maintenance – From July 10, 2026 to July 25, 2027, NYSDOT will be performing bridge maintenance and repairs at the Belt Parkway across Hendrix Creek at mile 0.1. During this time work platforms will be installed decreasing the vertical clearance to 20’-7”. Mariners with any questions or concerns may contact Antonio Donato at (646) 703-2644. Position 40-38.80N 073-52.42W USCG Northeast District Local Notice to Mariners 45/2026 SECTOR NORTHERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - SACO RIVER General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 43-27.60N 070-22.43W North Jetty Spur Construction project by Mohawk Northeast, scheduled to take place in Saco, Maine in position 43-27.88N 070-22.43W, from June 2026 through August 2027. The project involves construction activities at Saco Bay and Saco River, with a haul route extending to Portland Harbor. Operations will occur Monday through Friday, with ten-hour workdays. The onsite equipment will include two tug boats, one push boat, one work skiff, two work barges, and two material barges. Vessel communications will be managed via VHF channels 13 and 16, with security calls made prior to vessel movements to ensure safe navigation and coordination with passing vessels. Valid 2026-06-03 to 2027-08-31. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR NORTHERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - SACO RIVER General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 43-27.78N 070-22.44W Mariners are advised that Mohawk Northeast, Inc. will conduct North Jetty Spur construction work in Saco, Maine, from June 2026 through August 2027. Work will take place in the Saco Bay and Saco River area, primarily on the north side of the North Jetty, near 43-27.78N 070-22.44W. Marine construction equipment will be operating in and around the work area, including tugboats, a push boat, a work skiff, work barges, and material barges. Equipment and materials may also transit between the project site and Portland Harbor using designated haul routes through Saco Bay and nearby coastal waters. The haul routes are expected to be approximately 100 feet wide, but may vary depending on weather and operating conditions. Work is expected to occur Monday through Friday, during 10-hour workdays. Mariners should use caution when transiting near the construction area, reduce speed as appropriate, and remain alert for slow-moving or restricted-maneuverability vessels and barges. Project vessels will monitor VHF-FM channels 13 and 16. Vessel masters will make security calls before vessel movements and will coordinate passing arrangements with approaching traffic as needed. Mariners are requested to contact project vessels on VHF channels 13 or 16 before passing or operating near the work area. Valid 2026-09-03 to 2027-08-31. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - SAKONNET RIVER General / Autonomous Vessel Operations Mariners are advised that VATN Systems will conduct a two-week Maritime Execution Team event on the Sakonnet River, Rhode Island, from Island Park to McCorrie Point, from November 2 through November 13, 2026. Operations will take place on the west side of the river, Monday through Friday, from 8 a.m. to 5 p.m. Equipment includes multiple uncrewed surface vessels, a 74-foot workboat, a 48-foot RHIB, and a 24-foot RHIB. Mariners are requested to use caution when transiting the area and contact vessels on VHF-FM Channels 10 or 16. Valid 2026-10-26 to 2027-04-24. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - SAKONNET RIVER General / Marine Events / Fireworks RI – SAKONETT RIVER – TOWN OF GOSNOLD FIREWORKS DISPLAY – FIREWORKS Mariners are advised that the Town of Tiverton Fireworks Display is scheduled to be held from a barge in the vicinity of Sakonett River and Grinnell Beach, Tiverton, RI. The event will take place on Saturday May 23, 2026 from 8:45 p.m. to 9:30 p.m. Mariners are requested to maintain a minimum distance of 190 yards from the fireworks launching platform. Mariners may contact the person in charge by phone at (603) 235-4656. (Rain Date: May 26) USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - SAKONNET RIVER General / Miscellaneous VATN Systems will be conducting AUV testing in the Sakonnet River, from Island Park to Third Beach, from February 2, 2026, to December 31, 2026, between 8:00am to 5:00pm. Equipment on scene will be a support vessel, AUV with a boat in tow, monitoring VHF-FM CH 16. Valid 2026-02-03 to 2027-01-01. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR BOSTON, SUBMERGED LAND ACT (SLA) - SALEM CHANNEL General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 42-31.83N 070-51.72W Marine construction operations will be conducted in Salem Harbor, MA, in the vicinity of Abbott Rock Daybeacon from approximately September 28, 2026, through November 15, 2026. AGM Marine Contractors, Inc. will remove the Abbott Rock Daybeacon for the U.S. Coast Guard using the dredge PRONCKAI, deck barge THING, and tug SITKA. Work is expected to occur during a single daylight shift, approximately 6:00 a.m. to 8:00 p.m., seven days per week, weather permitting. Mariners are advised to transit the area with caution, reduce wake as necessary, and remain alert for construction vessels and equipment operating on scene. The dredge and tug will monitor VHF-FM Channels 13 and 16 and will use Channel 68 as the working channel. Valid 2026-28-21 to 2026-11-16. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR BOSTON, SUBMERGED LAND ACT (SLA) - SALEM CHANNEL General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 42-32.42N 070-48.71W Marine construction operations will be conducted in Salem Sound, MA, in the vicinity of Bowditch Ledge Daybeacon from approximately September 28, 2026, through November 15, 2026. AGM Marine Contractors, Inc. will remove the Bowditch Ledge Daybeacon for the U.S. Coast Guard using the dredge PRONCKAI, deck barge THING, and tug SITKA. Work is expected to occur during a single daylight shift, approximately 6:00 a.m. to 8:00 p.m., seven days per week, weather permitting. Mariners are advised to transit the area with caution, reduce wake as necessary, and remain alert for construction vessels and equipment operating on scene. The dredge and tug will monitor VHF-FM Channels 13 and 16 and will use Channel 68 as the working channel. Valid 2026-09-28 to 2026-11-16. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR NEW YORK, SUBMERGED LANDS ACT (SLA) - SANDY HOOK CHANNEL General / Marine Construction (Excluding Bridges) / Dredging Mariners are advised that Great Lakes Dredge and Dock Company, LLC will conduct channel maintenance dredging in New York Harbor, Sandy Hook Channel, Monmouth County, New Jersey, under USACE Contract W912DS-26-C-0022, from early October 2026 through mid-November 2026. Operations will occur 24 hours per day, 7 days per week. Equipment on scene will include GLDD Mechanical Dredge 54, two tugboats, two scow barges, and one survey/crew boat. Dredged material will be transported approximately 5 nautical miles for placement at the Sandy Hook Sea Bright Offshore Borrow Area. Mariners are requested to transit the area with caution, proceed at minimum safe speed to reduce wake, and avoid interfering with dredging, towing, and placement operations. Vessels may contact the dredge and support vessels on VHF-FM Channels 13 and 16 for passing arrangements. Valid 2026-09-22 to 2026-11-21. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR NEW YORK, SUBMERGED LANDS ACT (SLA) - SANDY HOOK CHANNEL General / Marine Construction (Excluding Bridges) / Dredging Mariners are advised that Great Lakes Dredge and Dock Company, LLC will conduct channel maintenance dredging in Sandy Hook Channel, New York Harbor, NJ, from October 4, 2026, through approximately mid-November 2026. Operations will occur 24 hours a day, seven days a week, under U.S. Army Corps of Engineers Contract W912DS-26-C-0022. Project vessels will include the mechanical dredge Dredge 54, tugboats Charles James and Larry J. Hebert, scow barges 501 and 502, and the survey/crew boat Calcasieu River. Dredged material will be transported to the Sea Bright Offshore Borrow Area placement site. Project vessels will monitor VHF Channels 13 and 16. Mariners are urged to exercise caution, proceed at a safe speed, maintain a safe distance from dredging and towing operations, and contact project vessels on VHF Channel 13 or 16 to arrange safe passage. Valid 2026-10-05 to 2026-11-21. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - SAQUATUCKET HARBOR ATON / Advanced Notice of Change Location: 41-39.40N 070-03.60W Aid Name: Saquatucket Harbor Buoy 1 LLNR: 14030 Action: CHANGE Action Type Change Light System Primary The U.S. Coast Guard will be making the following change to Aids to Navigation: CHANGE Saquatucket Harbor Buoy 1 (LLNR 14030) from an unlighted buoy to Saquatucket Harbor Lighted Buoy 1 (LLNR 14030) Quick Flashing Green Add to the remarks section of Light List Vol 1 Aid removed when endangered by ice. Light removed from Nov 15 to May 1. Valid 2026-09-02 to 2027-03-01. USCG Northeast District Local Notice to Mariners 45/2026 LONG ISLAND SOUND WESTERN PART - SAUGATUCK RIVER General / Bridges / Closure (Scheduled Or Emergency) Due to a mechanical failure, the Metro-North Railroad Bridge across the Saugatuck River at mile 1.1 in Westport CT is inoperable and unable to open for vessel traffic until further notice. Updates regarding the status of repairs will be provided when available. Mariners are advised to exercise caution when transiting the area. Position 41-07.17N 073-22.10W USCG Northeast District Local Notice to Mariners 45/2026 NAHANT HARBOR - SAUGUS RIVER APPROACH CHANNEL ATON / ATON Changes Location: 42-26.50N 070-57.51W Aid Name: Saugus River Approach Channel Buoy 7 LLNR: 10665 Action: RELOCATE TO: 42-26.50N 070-57.51W. Valid 2026-10-29 to 2026-12-28. USCG Northeast District Local Notice to Mariners 45/2026 NAHANT HARBOR - SAUGUS RIVER APPROACH CHANNEL General / Hazards To Navigation / Shoaling Reported MA-SALEM AND LYNN HARBORS (Chart 13275)-SAUGUS RIVER APPROACH CHANNEL Severe shoaling has been reported in the Saugus River in the vicinity of Saugus River Approach Channel Lighted Buoy 5 (LLNR 10655). Mariners should proceed with caution while transiting the area. USCG Northeast District Local Notice to Mariners 45/2026 NAHANT HARBOR - SAUGUS RIVER APPROACH CHANNEL General / Marine Construction (Excluding Bridges) / Boring and Core Samples Location: 42-26.74N 070-57.94W 42-26.73N 070-57.91W 42-26.54N 070-57.99W 42-26.54N 070-58.02W 42-26.74N 070-57.94W MASSACHUSETTS – LYNN/REVERE - SAUGUS RIVER – GENERAL EDWARDS BRIDGE – Boring Operations Mariners are advised that New England Boring Contractors will be conducting boring operations in the vicinity of the General Edwards Bridge Rt 1A Lynn/Revere. Operations will commenced on Monday August 24, 2026, and are being extended to Friday November 27, 2026. Hours of operations are 7:00 a.m. to 3:00 p.m. for the duration of the operations. On scene equipment will consist of the 18’x35’ jack-up barge Seismic Princess #7. All proposed boring locations are located outside of the navigable channel. For more information mariners may contact New England Boring Representative at (603) 828-6115 or (774) 259-2978. On scene vessel will be monitoring VHF-FM Ch 13/16. Mariners are advised to use caution and transit at slow speed to minimize wake when transiting the area. Valid 2026-10-27 to 2026-11-27. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR BOSTON, EXCLUSIVE ECONOMIC ZONE (EEZ) General / Hazards To Navigation / Obstructions Location: 42-51.98N 070-03.81W Mariners are advised that four passive acoustic bottom landers are deployed in the Gulf of Maine at the following approximate positions: 43-48.13N 067-40.78W; 42-51.98N 070-03.81W; 42-37.30N 068-08.87W; and 42-19.21N 067-19.80W. The landers were deployed between September 15 and 29, 2026, and are scheduled for recovery in September 2027. Each lander extends approximately 1.75 meters above the seafloor and has no surface expression. Mariners are advised to use caution when transiting the vicinity of these positions. Valid 2026-10-06 to 2027-09-30. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR BOSTON, EXCLUSIVE ECONOMIC ZONE (EEZ) General / Hazards To Navigation / Obstructions Location: 42-37.30N 068-08.87W Mariners are advised that four passive acoustic bottom landers are deployed in the Gulf of Maine at the following approximate positions: 43-48.13N 067-40.78W; 42-51.98N 070-03.81W; 42-37.30N 068-08.87W; and 42-19.21N 067-19.80W. The landers were deployed between September 15 and 29, 2026, and are scheduled for recovery in September 2027. Each lander extends approximately 1.75 meters above the seafloor and has no surface expression. Mariners are advised to use caution when transiting the vicinity of these positions. Valid 2026-10-06 to 2027-09-30. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR BOSTON, EXCLUSIVE ECONOMIC ZONE (EEZ) General / Hazards To Navigation / Obstructions Location: 42-19.21N 067-19.80W Mariners are advised that four passive acoustic bottom landers are deployed in the Gulf of Maine at the following approximate positions: 43-48.13N 067-40.78W; 42-51.98N 070-03.81W; 42-37.30N 068-08.87W; and 42-19.21N 067-19.80W. The landers were deployed between September 15 and 29, 2026, and are scheduled for recovery in September 2027. Each lander extends approximately 1.75 meters above the seafloor and has no surface expression. Mariners are advised to use caution when transiting the vicinity of these positions. Valid 2026-10-06 to 2027-09-30. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR BOSTON, EXCLUSIVE ECONOMIC ZONE (EEZ) General / Marine Construction (Excluding Bridges) / Survey Operations SAILDRONE INC. intends to conduct operations with up to ten Uncrewed Surface Vehicles (USVs), contracted by the United States Coast Guard District Northeast from 01 April through 31 December 2026. The SAILDRONE VOYAGER is 33 feet in length, 19 feet tall, gray in color with an orange wing, and has a tricolor light on the top wing and is marked “SAILDRONE.” These vehicles will be operating in waters predominantly offshore of Maine in the New England Grey Zone area, down to 300NM off the coast of Connecticut and New York. Mariners are requested to maintain 500m CPA from the vehicle. The plan for Saildrone USVs is to transit from Portland, Maine Valid 2026-04-01 to 2026-12-31. USCG Northeast District Local Notice to Mariners 45/2026 General / Marine Construction (Excluding Bridges) / Survey Operations SAILDRONE INC. intends to conduct operations with up to ten Uncrewed Surface Vehicles (USVs), contracted by the United States Coast Guard District Northeast from 01 April through 31 December 2026. The SAILDRONE VOYAGER is 33 feet in length, 19 feet tall, gray in color with an orange wing, and has a tricolor light on the top wing and is marked “SAILDRONE.” These vehicles will be operating in waters predominantly offshore of Maine in the New England Grey Zone area, down to 300NM off the coast of Connecticut and New York. Mariners are requested to maintain 500m CPA from the vehicle. The plan for Saildrone USVs is to transit from Portland, Maine Valid 2026-04-01 to 2026-12-31. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR NEW YORK, SUBMERGED LANDS ACT (SLA) General / LAA / RNA / Safety Zone A 500-meter Safety Zone will be enforced around Empire Wind operations from 8:00am, November 04, 2026, to 8:00am, November 11, 2026, Mariners are to avoid transiting within 500 meters of the following positions: C09: 40°20′25.307N, 073°26′50.160W; E08: 40°18′57.671N, 73°27′43.888W; B07: 40°21′25.983N, 73°28′32.271W; B19: 40°19′25.511N, 73°18′14.273W; D17: 40°18′24.335N, 73°19′59.229W; D19: 40°18′04.195N, 73°18′16.307W; B20: 40°19′15.431N, 73°17′22.802W; C19: 40°18′44.853N, 73°18′15.290W; C10: 40°20′15.2898N, 73°25′58.653W. Offshore vessels include: ECO LIBERTY, C PIONEER, CROSSWAY EAGLE, PERSISTENCE LAB, ACADIA and PATRIOT LEADER. Local fishing vessels will also support this work to promote communication and safety on the waterway. Potential vessels include: PAMELA ANN, GABRIELLE ELIZABETH, TRIUNFO, BARBARA ANN, ITALIAN PRINCESS, REDEMPTION, ENFORCER, FLEET KING, FLEET QUEEN, OCEAN QUEEN, NEW HORIZON, OCEAN PRIDE, MISTER MARCO, MADISON KATE and JO ANN V. Valid 2026-11-04 to 2026-11-12. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR NEW YORK, SUBMERGED LANDS ACT (SLA) General / LAA / RNA / Safety Zone A 500-meter Safety Zone will be enforced around Empire Wind operations from 8:00am, November 11, 2026, to 8:00am, November 18, 2026, Mariners are to avoid transiting within 500 meters of the following positions: C09: 40°20′25.307N, 073°26′50.160W; E08: 40°18′57.671N, 73°27′43.888W; D10: 40°19′34.629N, 73°25′59.594W; B05: 40°21′45.973N, 73°30′15.333W; D17: 40°18′24.335N, 73°19′59.229W; D19: 40°18′04.195N, 73°18′16.307W; B20: 40°19′15.431N, 73°17′22.802W; C19: 40°18′44.853N, 73°18′15.290W; C13: 40°19′45.200N, 73°23′24.159W; C18: 40°18′54.926N, 73°19′06.757W; C10: 40°20′15.2898N, 73°25′58.653W; D11: 40°19′24.606N, 73°25′08.100W. Offshore vessels include: ECO LIBERTY, C PIONEER, CROSSWAY EAGLE, PERSISTENCE LAB, ACADIA and PATRIOT LEADER. Local fishing vessels will also support this work to promote communication and safety on the waterway. Potential vessels include: PAMELA ANN, GABRIELLE ELIZABETH, TRIUNFO, BARBARA ANN, ITALIAN PRINCESS, REDEMPTION, ENFORCER, FLEET KING, FLEET QUEEN, OCEAN QUEEN, NEW HORIZON, OCEAN PRIDE, MISTER MARCO, MADISON KATE and JO ANN V. Valid 2026-11-11 to 2026-11-19. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR NEW YORK, SUBMERGED LANDS ACT (SLA) General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 40-18.19N 073-58.56W J.T. Cleary Inc. will be conducting pile driving operations in Long Branch, NJ, in position 40-18.19N 073-58.56W, from May 1, 2026, to April 30, 2027, Monday through Friday, between 5:00am to 6:00pm. Equipment on scene will be an offshore trestle extending 200 feet from shore, monitoring VHF-FM CH 16. Valid 2026-05-01 to 2027-04-30. USCG Northeast District Local Notice to Mariners 45/2026 General / Marine Construction (Excluding Bridges) / Dredging North American Aggregates, LLC, will be conducting maintenance dredging for the purpose of sand mining At the eastern end of Ambrose Federal Navigation Channel, bounded by the following positions: Southeast Corner: 40o28’38.09N, 073o53’40.95W; Northeast Corner: 40o28.56.01N, 073o53’29.99W; Northwest Corner: 40o30’03.63N, 073o56’23.56W; Southwest Corner: 40o29’53.98N, 073o56’55.75W. Work Start & Stop dates and Hours of Operation: 24/7 365-days per year (weather dependent) Equipment of scene: Dredge Eleanor & Associated Notched Tug the vessel is able to move on demand for traffic And will be monitoring VHF Radio Channel Monitored: 13, 14, 65. Disposal Site/Alternative Use Determination North American Aggregates, LLC, 1250 State Street, Perth Amboy, New Jersey 08861. Valid 2025-12-10 to 2030-09-30. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR NORTHERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) General / Hazards To Navigation / Obstructions Location: 42-59.43N 070-37.27W Mariners are advised that the University of New Hampshire will deploy and maintain a small instrumented stationary oceanographic mooring west of Appledore Island, Maine, from October 2, 2026, through June 1, 2027. The mooring, funded through a NOAA research project, will be located near 42°59'25.98"N, 070°37'16.44"W, in approximately 18 meters of water. The seafloor-mounted equipment measures approximately 3 meters high by 3 meters by 3 meters and will remain in place continuously. Mariners are urged to exercise caution and avoid interfering with the deployed research equipment. Valid 2026-10-05 to 2027-06-02. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR NORTHERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) General / Hazards To Navigation / Obstructions Location: 43-48.13N 067-40.78W Mariners are advised that four passive acoustic bottom landers are deployed in the Gulf of Maine at the following approximate positions: 43-48.13N 067-40.78W; 42-51.98N 070-03.81W; 42-37.30N 068-08.87W; and 42-19.21N 067-19.80W. The landers were deployed between September 15 and 29, 2026, and are scheduled for recovery in September 2027. Each lander extends approximately 1.75 meters above the seafloor and has no surface expression. Mariners are advised to use caution when transiting the vicinity of these positions. Valid 2026-10-06 to 2027-09-30. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR NORTHERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) General / Hazards To Navigation / Obstructions Location: 43-00.25N 070-41.68W NEW HAMPSHIRE - PISCATAQUA RIVER APPROACH - SCIENTIFIC EQUIPMENT DEPLOYMENT. The University of New Hampshire will deploy a small instrumented oceanographic lander on the seafloor approximately 2.4 NM southeast of Odiorne Point, at approximate position 43°00'15.12"N, 070°41'40.58"W. The lander is approximately 3 meters high and 3 meters by 3 meters in footprint, located in approximately 24 meters of water. Deployment will remain in place from 19 October 2026 through 19 April 2027. Mariners are advised to use caution when transiting the area. Valid 2026-10-19 to 2027-04-20. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR NORTHERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) General / Marine Construction (Excluding Bridges) / Survey Operations SAILDRONE INC. intends to conduct operations with up to ten Uncrewed Surface Vehicles (USVs), contracted by the United States Coast Guard District Northeast from 01 April through 31 December 2026. The SAILDRONE VOYAGER is 33 feet in length, 19 feet tall, gray in color with an orange wing, and has a tricolor light on the top wing and is marked “SAILDRONE.” These vehicles will be operating in waters predominantly offshore of Maine in the New England Grey Zone area, down to 300NM off the coast of Connecticut and New York. Mariners are requested to maintain 500m CPA from the vehicle. The plan for Saildrone USVs is to transit from Portland, Maine Valid 2026-04-01 to 2026-12-31. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR NORTHERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes The attached Local Notice to Mariners (LNM) Information Form announces upcoming maintenance on Emms Rock Light 9 (LLNR 1305) in Englishman Bay, Maine, located at latitude 44.52899°N and longitude -67.56581°W. Fuller Marine Services Inc., represented by Chuck and Sam Fuller, will replace the steel structure and concrete cap, stabilize the stone foundation, and remove the lights. The project is scheduled to begin on July 20, 2026, and will continue until completion, with daily operations from 7:00 AM to 6:00 PM. The vessel Enzo Charles will be on site, monitoring VHF-FM Channels 16 and 13 for navigational safety, with additional contact available on Channels 09 and 22A. The Enzo Charles will ensure a clear fairway for marine traffic and will reposition as needed within 30 minutes of notification, weather and safety permitting. Mariners should coordinate passing arrangements via VHF Channel 13. Valid 2026-07-20 to 2027-07-07. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) ATON / ATON Changes Location: 41-13.68N 071-03.76W Aid Name: Revolution Wind WTG AE11 LLNR: 602.02 Action: ESTABLISH MRASS The Marine Radio Activated Sound Signal (MRASS) will be activated by keying VHF radio channel 83A 5 times within 10 seconds. The MRASS will sound every 30 seconds (4 seconds on 26 seconds off) for 45 minutes from last VHF activation. Valid 2026-10-30 to 2027-04-28. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) ATON / ATON Changes Location: 41-09.45N 071-15.53W Aid Name: Revolution Wind WTG AJ02 LLNR: 602.08 Action: ESTABLISH MRASS The Marine Radio Activated Sound Signal (MRASS) will be activated by keying VHF radio channel 83A 5 times within 10 seconds. The MRASS will sound every 30 seconds (4 seconds on 26 seconds off) for 45 minutes from last VHF activation. Valid 2026-10-30 to 2027-04-28. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) ATON / ATON Changes Location: 41-13.55N 071-10.37W Aid Name: Revolution Wind WTG AE06 LLNR: 602.06 Action: ESTABLISH MRASS The Marine Radio Activated Sound Signal (MRASS) will be activated by keying VHF radio channel 83A 5 times within 10 seconds. The MRASS will sound every 30 seconds (4 seconds on 26 seconds off) for 45 minutes from last VHF activation. Valid 2026-10-30 to 2027-04-28. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) ATON / ATON Changes Location: 41-07.89N 070-50.39W Aid Name: Revolution Wind WTG AL21 LLNR: 602.1 Action: ESTABLISH MRASS The Marine Radio Activated Sound Signal (MRASS) will be activated by keying VHF radio channel 83A 5 times within 10 seconds. The MRASS will sound every 30 seconds (4 seconds on 26 seconds off) for 45 minutes from last VHF activation. Valid 2026-10-30 to 2027-04-28. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) ATON / ATON Changes Location: 41-06.90N 070-50.33W Aid Name: Revolution Wind WTG AM21 LLNR: 602.11 Action: ESTABLISH MRASS The Marine Radio Activated Sound Signal (MRASS) will be activated by keying VHF radio channel 83A 5 times within 10 seconds. The MRASS will sound every 30 seconds (4 seconds on 26 seconds off) for 45 minutes from last VHF activation. Valid 2026-10-30 to 2027-04-28. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) ATON / ATON Changes Location: 41-04.73N 071-00.87W Aid Name: Revolution Wind WTG AP13 LLNR: 602.12 Action: ESTABLISH MRASS The Marine Radio Activated Sound Signal (MRASS) will be activated by keying VHF radio channel 83A 5 times within 10 seconds. The MRASS will sound every 30 seconds (4 seconds on 26 seconds off) for 45 minutes from last VHF activation. Valid 2026-10-30 to 2027-04-28. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) ATON / ATON Changes Location: 41-04.79N 070-56.86W Aid Name: Revolution Wind WTG AP16 LLNR: 602.15 Action: ESTABLISH MRASS The Marine Radio Activated Sound Signal (MRASS) will be activated by keying VHF radio channel 83A 5 times within 10 seconds. The MRASS will sound every 30 seconds (4 seconds on 26 seconds off) for 45 minutes from last VHF activation. Valid 2026-10-30 to 2027-04-28. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) ATON / ATON Changes Location: 41-09.64N 071-04.95W Aid Name: Revolution Wind WTG AJ10 LLNR: 602.16 Action: ESTABLISH MRASS The Marine Radio Activated Sound Signal (MRASS) will be activated by keying VHF radio channel 83A 5 times within 10 seconds. The MRASS will sound every 30 seconds (4 seconds on 26 seconds off) for 45 minutes from last VHF activation. Valid 2026-10-30 to 2027-04-28. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) ATON / ATON Changes Location: 41-09.70N 071-02.30W Aid Name: Revolution Wind WTG AJ12 LLNR: 602.17 Action: ESTABLISH MRASS The Marine Radio Activated Sound Signal (MRASS) will be activated by keying VHF radio channel 83A 5 times within 10 seconds. The MRASS will sound every 30 seconds (4 seconds on 26 seconds off) for 45 minutes from last VHF activation. Valid 2026-10-30 to 2027-04-28. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) ATON / ATON Changes Location: 41-13.63N 071-06.40W Aid Name: Revolution Wind WTG AE09 LLNR: 602.21 Action: ESTABLISH MRASS The Marine Radio Activated Sound Signal (MRASS) will be activated by keying VHF radio channel 83A 5 times within 10 seconds. The MRASS will sound every 30 seconds (4 seconds on 26 seconds off) for 45 minutes from last VHF activation. Valid 2026-10-30 to 2027-04-28. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) ATON / ATON Changes Location: 41-06.80N 070-55.61W Aid Name: Revolution Wind WTG AM17 LLNR: 602.26 Action: ESTABLISH MRASS The Marine Radio Activated Sound Signal (MRASS) will be activated by keying VHF radio channel 83A 5 times within 10 seconds. The MRASS will sound every 30 seconds (4 seconds on 26 seconds off) for 45 minutes from last VHF activation. Valid 2026-10-30 to 2027-04-28. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) ATON / ATON Changes Location: 41-09.58N 071-08.92W Aid Name: Revolution Wind WTG AJ07 LLNR: 602.35 Action: ESTABLISH MRASS The Marine Radio Activated Sound Signal (MRASS) will be activated by keying VHF radio channel 83A 5 times within 10 seconds. The MRASS will sound every 30 seconds (4 seconds on 26 seconds off) for 45 minutes from last VHF activation. Valid 2026-10-30 to 2027-04-28. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) ATON / ATON Changes Location: 41-06.71N 070-59.57W Aid Name: Revolution Wind WTG AM14 LLNR: 602.45 Action: ESTABLISH MRASS The Marine Radio Activated Sound Signal (MRASS) will be activated by keying VHF radio channel 83A 5 times within 10 seconds. The MRASS will sound every 30 seconds (4 seconds on 26 seconds off) for 45 minutes from last VHF activation. Valid 2026-10-30 to 2027-04-28. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) ATON / ATON Changes Location: 41-11.50N 071-12.94W Aid Name: Revolution Wind WTG AG04 LLNR: 602.58 Action: ESTABLISH MRASS The Marine Radio Activated Sound Signal (MRASS) will be activated by keying VHF radio channel 83A 5 times within 10 seconds. The MRASS will sound every 30 seconds (4 seconds on 26 seconds off) for 45 minutes from last VHF activation. Valid 2026-10-30 to 2027-04-28. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) ATON / ATON Changes Location: 41-09.50N 071-12.90W Aid Name: Revolution Wind WTG AJ04 LLNR: 602.6 Action: ESTABLISH MRASS The Marine Radio Activated Sound Signal (MRASS) will be activated by keying VHF radio channel 83A 5 times within 10 seconds. The MRASS will sound every 30 seconds (4 seconds on 26 seconds off) for 45 minutes from last VHF activation. Valid 2026-10-30 to 2027-04-28. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) ATON / ATON Changes Location: 41-04.67N 071-03.48W Aid Name: Revolution Wind WTG AP11 LLNR: 602.65 Action: ESTABLISH MRASS The Marine Radio Activated Sound Signal (MRASS) will be activated by keying VHF radio channel 83A 5 times within 10 seconds. The MRASS will sound every 30 seconds (4 seconds on 26 seconds off) for 45 minutes from last VHF activation. Valid 2026-10-30 to 2027-04-28. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) ATON / ATON Changes Location: 40-58.55N 071-09.88W Aid Name: Sunrise Wind WTG AV06 LLNR: 603.51 Action: CHANGE Action Type Change Light Characteristic from QY to Fl Y 6s. Valid 2026-11-02 to 2027-01-01. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) General / Hazards To Navigation / Hazards Location: 40-58.14N 071-07.42W Valid 2026-08-20 to 2026-12-31. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) General / Hazards To Navigation / Hazards Location: 40-51.06N 069-54.67W The Coast Guard has received a report of a submerged dredge tied to a red ball buoy located IVO Nantucket Shoal in position 40-51.062N 069-54.671W, All mariners are requested to use caution while transiting the area. Valid 2026-10-13 to 2027-04-11. USCG Northeast District Local Notice to Mariners 45/2026 APPROACHES TO NEW YORK NANTUCKET SHOALS TO FIVE FATHOM BANK General / Hazards To Navigation / Hazards NY-NJ-ATLANTIC OCEAN-NEW YORK BIGHT-Updated 3/4/2024 Two unexploded ordnances have been located via survey approximately 25 miles east of Sandy Hook, NJ in positions, 40-22.26N 073-33.83W and 40-20.63N 073-31.19W in approximately depth of 26 meters (see chartlet). Mariners are urged to avoid the ordnance and transit the area with caution. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) General / Miscellaneous Location: 41-15.89N 070-18.85W 40-50.42N 070-18.77W 40-49.48N 071-38.36W 41-07.96N 071-38.03W 41-08.08N 071-28.14W 41-15.77N 071-27.90W 41-15.89N 070-18.85W EXAILS's DriX 18 will be conducting fish stock surveys in and around • Block Island wind farm • South Fork wind • Revolution wind • Vineyard wind 1 • Sunrise wind The DriX 18 remote operations center can be contacted at (401) 256-1561 This number can be reached 24 hours a day and 7 days a week during the survey. Valid 2026-10-13 to 2026-11-14. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) General / Bridges From October 15, 2026, to April 30, 2027, contractors will be conducting structural repairs and painting of the Oyster Harbors (West Bay) Bridge across West Bay at mile 1.2 in Osterville, MA. From October 15, 2026, to December 14, 2026, work will be conducted from platforms suspended from the low structural steel of each approach span. Vertical clearance beneath each approach span will be maintained at 10 feet above Mean High Water. From December 15, 2026, through April 30, 2027. Work platforms will be deployed from the low structural steel of the moveable span above the navigation channel. Vertical clearance beneath the moveable span will be maintained above 10 feet at Mean High Water. During this time frame, the moveable span will remain in the closed position and will not open for marine traffic. Vessels capable of transiting under the moveable span in the closed position may continue to do so. Mariners can obtain information about specific information about this project by contacting the on-site contractor at (857) 829-1047. Mariners are advised to exercise caution when transiting the area. Position 41-37.40N 070-23.80W USCG Northeast District Local Notice to Mariners 45/2026 GEORGES BANK AND NANTUCKET SHOALS - CHATHAM HARBOR APPROACH General / Hazards To Navigation / Shoaling Reported Location: Shoaling has been reported in Old Harbor between buoys 6 and 8. Mariners are advised to use extreme caution while transiting the area. Valid 2024-08-30 to 2039-12-31. USCG Northeast District Local Notice to Mariners 45/2026 GEORGES BANK AND NANTUCKET SHOALS - POLLOCK RIP CHANNEL General / Hazards To Navigation / Shoaling Reported MA-NANTUCKET SOUND AND APPROACHES (Chart 13237)-POLLOCK RIP CHANNEL The entrance to Pollock Rip Channel from the East continues to have SEVERE shoaling East of Pollock Rip Lighted Buoy 4 (LLNR 13535). Mariners should not attempt to transit the area without local knowledge of the shoals and use the channel at their own risk. If transiting the channel, Mariners are urged to transit at their slowest safe speed and proceed with extreme caution. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, TERRITORIAL SEA - SECTOR SOUTHEASTERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) General / Hazards To Navigation / Shoaling Reported Location: 41-39.30N 070-06.95W 41-39.30N 070-06.94W 41-39.24N 070-06.95W 41-39.24N 070-06.96W 41-39.30N 070-06.95W Shoaling has been report in Allen Harbor. The Allen Harbor entrance channel is less than 30 feet wide due to severe shoaling in the vicinity of the west jetty. Water depths have been reported less than 3 feet in the across the channel. Valid 2026-05-18 to 2027-09-30. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, TERRITORIAL SEA - SECTOR SOUTHEASTERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) General / Marine Construction (Excluding Bridges) / Dredging AGM Marine Contractors, Inc. is currently working on the removal of Collier Ledge and Southwest Rock rock pile rubble in Nantucket Sound, Massachusetts, in position 41° 35' 44.4" N, 70°21' 08.2" W and 41°36' 26.6" N, 70° 19' 10.8" W, for the U.S. Coast Guard. The operation is scheduled to take place between June 16, 2026 and May 2027, utilizing the dredge "PRONCKAI," deck barge "THING 2," and tug "SITKA." Work will occur daily from 6 AM to 8 PM, weather permitting. The rock pile rubble will be deposited in the Yarmouth Offshore Reef Site in position 41-36.41N 070-11.12W. All vessels will be monitoring VHF channels 13/16 and operating on channel 68. No passing arrangements are required. Valid 2026-05-19 to 2027-05-18. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) - SECTOR SOUTHEASTERN NEW ENGLAND, TERRITORIAL SEA ATON / ATON Changes Location: 41-12.68N 071-03.74W Aid Name: Revolution Wind WTG AF11 LLNR: 602.41 Action: ESTABLISH MRASS The Marine Radio Activated Sound Signal (MRASS) will be activated by keying VHF radio channel 83A 5 times within 10 seconds. The MRASS will sound every 30 seconds (4 seconds on 26 seconds off) for 45 minutes from last VHF activation. Valid 2026-10-30 to 2027-04-28. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) - SECTOR SOUTHEASTERN NEW ENGLAND, TERRITORIAL SEA ATON / ATON Changes Location: 41-07.83N 070-54.30W Aid Name: Revolution Wind WTG AL18 LLNR: 602.54 Action: ESTABLISH MRASS The Marine Radio Activated Sound Signal (MRASS) will be activated by keying VHF radio channel 83A 5 times within 10 seconds. The MRASS will sound every 30 seconds (4 seconds on 26 seconds off) for 45 minutes from last VHF activation. Valid 2026-10-30 to 2027-04-28. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) - SECTOR SOUTHEASTERN NEW ENGLAND, TERRITORIAL SEA ATON / ATON Changes Location: 41-09.76N 070-58.37W Aid Name: Revolution Wind WTG AJ15 LLNR: 602.64 Action: ESTABLISH MRASS The Marine Radio Activated Sound Signal (MRASS) will be activated by keying VHF radio channel 83A 5 times within 10 seconds. The MRASS will sound every 30 seconds (4 seconds on 26 seconds off) for 45 minutes from last VHF activation. Valid 2026-10-30 to 2027-04-28. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) - SECTOR SOUTHEASTERN NEW ENGLAND, TERRITORIAL SEA General / Hazards To Navigation / Obstructions Location: 41.07463/-71.5385 RIDEM is deploying acoustic monitoring units with fixed structures on the seafloor. The fixed structures will remain in place on the seafloor and are roughly 40 inches wide by 14 inches in height. All mariners are advised to exercise caution if trawling or fishing along the seafloor in this area. Valid 2026-04-20 to 2029-04-19. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) - SECTOR SOUTHEASTERN NEW ENGLAND, TERRITORIAL SEA General / Hazards To Navigation / Obstructions Location: 41.13795/-71.3519 RIDEM is deploying acoustic monitoring units with fixed structures on the seafloor. The fixed structures will remain in place on the seafloor and are roughly 40 inches wide by 14 inches in height. All mariners are advised to exercise caution if trawling or fishing along the seafloor in this area. Valid 2026-04-20 to 2029-04-19. USCG Northeast District Local Notice to Mariners 45/2026 APPROACHES TO NEW YORK NANTUCKET SHOALS TO FIVE FATHOM BANK - BLOCK ISLAND General / Hazards To Navigation / Shoaling Reported RI-BLOCK ISLAND-OLD HARBOR Shoaling has been reported in the entrance to Old Harbor, Block Island. Mariners are advised to proceed with caution while transiting the area. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) - SECTOR SOUTHEASTERN NEW ENGLAND, TERRITORIAL SEA General / LAA / RNA / Safety Zone A 500-meter Safety Zone may be enforced around Ørsted Northeast Program operations from 8:00am, November 04, 2026, to 8:00am, November 11, 2026, Mariners are to avoid transiting within 500-meters of the following positions: Revolution Wind Lease Area 486 Offshore Substations (OSS): AF08: 41-12.60N 071-07.70W, AL11: 41-07.69N 071-03.54W. Sunrise Wind Lease Area 487 Offshore Converter Station (OCS): AU08: 40-59.60N 071-07.28W. Sunrise Wind Lease Area 487 Wind Turbine Generator (WTG) AV06: 40-58.55N 071-09.88W, AW05: 40-57.52N 071-11.17W, AW06: 40-57.54N 071-09.86W, AW07: 40-57.57N 071-08.53W, AW08: 40-57.56N 071-07.21W Northeast Program SCYLLA and supporting vessels are installing wind turbine generators (WTGs). Components are stored in New London, CT. Barge 455-8 and tugs SAM and OCEAN SUN transport one complete WTG per roundtrip. LEVIATHAN is stationed at AU08 for offshore converter station commissioning. BOKA OCEAN is installing these cables. NDEAVOR is trenching behind BOKA OCEAN. There may be areas of exposed cable. Please contact Safety Vessels on scene before conducting bottom-contacting activities. ARCADIA is installing scour protections at SRW foundation locations. ARIES RAM XII is conducting maintenance at Block Island Wind Farm. Valid 2026-11-04 to 2026-11-12. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) - SECTOR SOUTHEASTERN NEW ENGLAND, TERRITORIAL SEA General / LAA / RNA / Safety Zone A 500-meter Safety Zone may be enforced around Ørsted Northeast Program operations from 8:00am, November 11, 2026, to 8:00am, November 18, 2026, Mariners are to avoid transiting within 500-meters of the following positions: Revolution Wind Lease Area 486 Offshore Substations (OSS): AF08: 41-12.60N 071-07.70W, AL11: 41-07.69N 071-03.54W. Sunrise Wind Lease Area 487 Offshore Converter Station (OCS): AU08: 40-59.60N 071-07.28W. Sunrise Wind Lease Area 487 Wind Turbine Generator (WTG) AW05: 40-57.52N 071-11.17W, AW06: 40-57.54N 071-09.86W, AW07: 40-57.57N 071-08.53W, AW08: 40-57.56N 071-07.21W, AV11: 40-58.67N 071-03.29W Northeast Program SCYLLA and supporting vessels are installing wind turbine generators (WTGs). Components are stored in New London, CT. Barge 455-8 and tugs SAM and OCEAN SUN transport one complete WTG per roundtrip. LEVIATHAN is stationed at AU08 for offshore converter station commissioning. BOKA OCEAN is installing these cables. NDEAVOR is trenching behind BOKA OCEAN. There may be areas of exposed cable. Please contact Safety Vessels on scene before conducting bottom-contacting activities. ARCADIA is installing scour protections at SRW foundation locations. ARIES RAM XII is conducting maintenance at Block Island Wind Farm. Valid 2026-11-11 to 2026-11-19. USCG Northeast District Local Notice to Mariners 45/2026 PROVIDENCE RIVER - SEEKONK RIVER General / Bridges / Construction RHODE ISLAND- WASHINGTON BRIDGE (RIDOT BRIDGE NO. 700) – SEEKONK RIVER- General Construction – Rhode Island Department of Transportation (RIDOT) will begin preliminary construction work for the new Washington Bridge. From May 18, 2026, to June 29, 2029, there will be ongoing bridge construction operations Monday-Friday from 7:00 a.m.-4:30 p.m. Construction equipment and barges will be positioned outside of the navigation channel. For the next three months, there will be no reduction to the bridge horizontal or vertical clearances and no closures to the navigation channel. Mariners are advised to exercise caution and reduce wake when transiting the area. Mariners with questions or concerns can contact the contractor via marine radio VHF-FM Ch 16 or call Andy Kerr, General Superintendent at (860) 912-7299. Position 41-49.15N 071-23.22W USCG Northeast District Local Notice to Mariners 45/2026 NEW LONDON HARBOR - SHAW COVE ENTRANCE General / LAA / RNA / Safety Zone Location: 41-21.02N 072-05.70W The Coast Guard is establishing a temporary safety zone on September 12, 2026 from 8:15 p.m. through 9:30 p.m. The safety zone will cover all navigable waters of the Thames River encompassing a 600-foot radius at approximate position 41° 21' 01" N, 72° 05' 42" W, in the vicinity of New London Waterfront Park in New London, CT. No vessel or person will be permitted to enter the safety zone without obtaining permission from the COTP or a designated representative. Mariners can contact the person in charge of the Drone Show Jeff Ward during the event at (516) 369-2107 Valid 2026-09-11 to 2027-03-13. USCG Northeast District Local Notice to Mariners 45/2026 ROCKAWAY INLET - SHEEPSHEAD BAY General / Hazards To Navigation / Shoaling Reported Location: 40-34.68N 073-55.82W 40-34.68N 073-55.66W 40-34.49N 073-55.68W 40-34.50N 073-55.84W 40-34.68N 073-55.82W Valid 2024-09-13 to 2039-12-21. USCG Northeast District Local Notice to Mariners 45/2026 ROCKAWAY INLET - SHEEPSHEAD BAY General / Hazards To Navigation / Shoaling Reported Location: 40-34.63N 073-55.67W 40-34.51N 073-55.64W 40-34.50N 073-55.71W 40-34.62N 073-55.75W 40-34.63N 073-55.67W Shoaling has been reported in Sheepshead Bay. Mariners report that only two feet of water at low tide and five feet of water at high tide when transiting around the buoys 6 and 7 buoys at the southern entrance to Sheepshead Bay NY. Mariners are advice to transit the area with extreme caution. Valid 2026-05-21 to 2027-10-03. USCG Northeast District Local Notice to Mariners 45/2026 GARDINERS BAY SOUTH ENTRANCE - SHELTER ISLAND SOUND SOUTH CHANNEL General / Hazards To Navigation / Obstructions Location: 40-53.52N 072-17.18W Sound and the Sea, LLC will conduct scientific research focused on marine mammal detection and monitoring in the Atlantic Ocean south of Long Island, New York, off Mecox Bay. Four bottom-mounted passive acoustic monitoring devices will be deployed at specified coordinates: Sensor 1 (40°53'31.499" N, 72°17'10.612" W), Sensor 2 (40°52'33.985" N, 72°18'8.856" W), Sensor 3 (40°52'34.698" N, 72°19'44.666" W), and Sensor 4 (40°51'37.181" N, 72°20'42.911" W). Each device will be moored to the seafloor with a footprint of approximately one square foot and a line floating up to eight feet above the seafloor, at depths between 50 and 60 feet. The monitoring will be continuous, operating 24/7 from June 7, 2026, to May 1, 2027. Valid 2026-05-28 to 2027-05-01. USCG Northeast District Local Notice to Mariners 45/2026 SHINNECOCK INLET - SHINNECOCK BAY General / Hazards To Navigation / Obstructions Location: 40-52.57N 072-18.15W Sound and the Sea, LLC will conduct scientific research focused on marine mammal detection and monitoring in the Atlantic Ocean south of Long Island, New York, off Mecox Bay. Four bottom-mounted passive acoustic monitoring devices will be deployed at specified coordinates: Sensor 1 (40°53'31.499" N, 72°17'10.612" W), Sensor 2 (40°52'33.985" N, 72°18'8.856" W), Sensor 3 (40°52'34.698" N, 72°19'44.666" W), and Sensor 4 (40°51'37.181" N, 72°20'42.911" W). Each device will be moored to the seafloor with a footprint of approximately one square foot and a line floating up to eight feet above the seafloor, at depths between 50 and 60 feet. The monitoring will be continuous, operating 24/7 from June 7, 2026, to May 1, 2027. Valid 2026-05-28 to 2027-05-01. USCG Northeast District Local Notice to Mariners 45/2026 SHINNECOCK INLET - SHINNECOCK BAY General / Hazards To Navigation / Obstructions Location: 40-52.58N 072-19.74W Sound and the Sea, LLC will conduct scientific research focused on marine mammal detection and monitoring in the Atlantic Ocean south of Long Island, New York, off Mecox Bay. Four bottom-mounted passive acoustic monitoring devices will be deployed at specified coordinates: Sensor 1 (40°53'31.499" N, 72°17'10.612" W), Sensor 2 (40°52'33.985" N, 72°18'8.856" W), Sensor 3 (40°52'34.698" N, 72°19'44.666" W), and Sensor 4 (40°51'37.181" N, 72°20'42.911" W). Each device will be moored to the seafloor with a footprint of approximately one square foot and a line floating up to eight feet above the seafloor, at depths between 50 and 60 feet. The monitoring will be continuous, operating 24/7 from June 7, 2026, to May 1, 2027. Valid 2026-05-28 to 2027-05-01. USCG Northeast District Local Notice to Mariners 45/2026 SHINNECOCK INLET - SHINNECOCK BAY General / Hazards To Navigation / Obstructions Location: 40-51.62N 072-20.71W Sound and the Sea, LLC will conduct scientific research focused on marine mammal detection and monitoring in the Atlantic Ocean south of Long Island, New York, off Mecox Bay. Four bottom-mounted passive acoustic monitoring devices will be deployed at specified coordinates: Sensor 1 (40°53'31.499" N, 72°17'10.612" W), Sensor 2 (40°52'33.985" N, 72°18'8.856" W), Sensor 3 (40°52'34.698" N, 72°19'44.666" W), and Sensor 4 (40°51'37.181" N, 72°20'42.911" W). Each device will be moored to the seafloor with a footprint of approximately one square foot and a line floating up to eight feet above the seafloor, at depths between 50 and 60 feet. The monitoring will be continuous, operating 24/7 from June 7, 2026, to May 1, 2027. Valid 2026-05-28 to 2027-05-01. USCG Northeast District Local Notice to Mariners 45/2026 SHINNECOCK INLET - SHINNECOCK BAY General / Hazards To Navigation / Shoaling Reported NY-SHINNECOCK BAY TO EAST ROCKAWAY INLET-SLOOP CHANNEL Shoaling has been reported in the vicinity of Sloop Channel Beacon 21 (LLNR - 31100). All mariners are requested to use caution when transiting the area. Valid 2024-09-13 to 2039-12-29. USCG Northeast District Local Notice to Mariners 45/2026 RARITAN BAY - SHREWSBURY RIVER General / Hazards To Navigation / Shoaling Reported Location: 40-24.88N 074-00.11W 40-24.81N 074-00.08W 40-24.79N 074-00.16W 40-24.86N 074-00.19W 40-24.88N 074-00.11W NJ-SHREWSBURY RIVER Shoaling has been reported in the vicinity of Shrewsbury River Channel Lighted Buoy 5 (LLNR - 35755). All mariners are requested to use caution when transiting the area. Valid 2024-09-13 to 2039-12-27. USCG Northeast District Local Notice to Mariners 45/2026 SLOOP CHANNEL General / Bridges / Maintenance T00:00:00.000Z To: 2027-02-28T00:00:00.000Z Location: 40-36.27N 073-34.21W Bridge Name: Loop State Pkwy Bridge From November 4, 2026 to February 28, 2027, between 7:00 a.m. and 6:00 p.m., a barge will be operated under Loop Parkway Bridge over Long Creek at mile 0.7 to perform bridge painting. A work platform will be installed at the east bascule leaf leaving it inoperable. The bridge will be under single leaf operations during the project. Mariners with any questions may contact the contractor via marine radio VHF-FM Ch. 13/16 or call Samuel Gomes at (973) 393-5280. The barge will be moved out of the navigable channel after work hours or when not in use. Mariners are advised to exercise caution when transiting the area. Valid 2026-09-01 until further notice. USCG Northeast District Local Notice to Mariners 45/2026 SLOOP CHANNEL General / Bridges Location: 40-35.95N 073-32.59W Bridge Name: Meadowbrook State Parkway Bridge Due to a mechanical failure, the south leaves of the Meadowbrook State Parkway Bridge across Sloop Channel at mile 12.8 are inoperable until further notice. The bridge can still open in accordance with its operating schedule but can only open the north leaves of the bridge, providing open vertical clearance of 37.5’ at the North side of the channel. Updates regarding the status of repairs will be provided when available. Mariners are advised to exercise caution when transiting the area. Valid 2026-11-05 to 2027-05-03. USCG Northeast District Local Notice to Mariners 45/2026 NEW LONDON HARBOR - THAMES RIVER General / Marine Construction (Excluding Bridges) / Dredging Location: 41-24.03N 072-05.78W Cashman Dredging and Marine Contracting Co., LLC plans to begin dredging operations on or about October 1, 2026, for the Naval Submarine Base New London Pier 31 Extension project in Groton, Connecticut. Work will occur in the Thames River adjacent to Naval Submarine Base New London/Pier 31in position 41°24'01.720"N, 72°05'47.050"W and is expected to continue through January 31, 2027, operating 24 hours per day, seven days per week. The project is authorized under U.S. Army Corps of Engineers Permit No. NAE-2023-00668. Equipment may include the dredge Icarus, split-hull dump scows Joe V and Eddie C, a survey boat, tugboats, and other support equipment. Project vessels will monitor VHF Channels 16 and 13, with a working channel to be determined. Mariners transiting the area should proceed with caution, maintain a safe distance from dredging equipment, and coordinate passing arrangements by VHF radio. Dredged material will be transported to the U.S. Navy Confined Aquatic Disposal Cell Center. Mariners requiring passage through the work area are encouraged to provide advance notice when practicable, as clearing the navigation area may take approximately 30 minutes depending on conditions. Valid 2026-10-01 to 2027-01-31. USCG Northeast District Local Notice to Mariners 45/2026 PLYMOUTH BAY - THE NUMMET CHANNEL General / Hazards To Navigation / Shoaling Reported MA-NUMMET CHANNEL (REVISED) The Coast Guard has received a report of shoaling in the vicinity of The Nummet Channel Buoy 7 (LLNR 12760). Mariners are advised to proceed with caution when transiting the area. USCG Northeast District Local Notice to Mariners 45/2026 NORTH CHANNEL - THE RAUNT CHANNEL General / Hazards To Navigation / Shoaling Reported Location: 40-36.13N 073-50.29W 40-36.11N 073-50.23W 40-36.04N 073-50.05W 40-35.99N 073-50.10W 40-36.06N 073-50.26W 40-36.09N 073-50.32W 40-36.13N 073-50.29W NY-RAUNT CHANNEL (Booklet Chart 12350 JAMAICA BAY Recent surveys have shown significant shoaling in the Raunt Channel. Shoaling exists in the vicinity of Buoy 6, in approximate position 40-36.17N 073-50.47W. Depths of less than 5 feet in the middle of the channel. Navigation of the area requires extreme caution due to the encroaching nature of the shoal. Valid 2024-09-13 to 2039-10-20. USCG Northeast District Local Notice to Mariners 45/2026 HUDSON RIVER - TROY DAM General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 42-42.07N 073-41.17W Carteret Marine Services will be conducting marine construction operations at the Troy Locks, Hudson River, in position 42-45.07N 073-41.17W, from May 11, 2026, to November 30, 2026, between 7:00am to 5:00pm. Equipment on scene will be a barge and vessel, monitoring VHF-FM CH 8 & 16. Valid 2026-05-11 to 2026-11-30. USCG Northeast District Local Notice to Mariners 45/2026 KENNEBEC RIVER - UPPER KENNEBEC RIVER General / Marine Events / Fireworks ME –Old Hallowell Day – Hallowell – Fireworks Mariners are advised that the Old Hallowell Day Fireworks are scheduled to be held around the Kennebec River near the vicinity of Hallowell, ME. The event will be held from 09:00 p.m. to 09:30 p.m. on July 18, 2026. Chart number: 13260. For event information contact: Steven Marson, (207)242-9013. Position 44-17.28N 069-47.27W USCG Northeast District Local Notice to Mariners 45/2026 THAMES RIVER - UPPER THAMES RIVER General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 41-26.66N 072-05.07W CT-THAMES RIVER-GALES FERRY Sterling Equipment, Inc, will be storing rental fleet barges in position 41-26.66N 072-05.07W, until May 2027. Equipment on scene will be Spud Barges, Hopper Barge and Deck Barges, which will be outside the navigable channel and will not impede navigation. Point of contact for this operation is Mark Quinn, who can be reached at (617) 984-0022 or at [email protected]. Mariners are requested to give adequate clearance to the equipment and transit at their slowest safe speed to minimize wake. Valid 2024-10-23 to 2027-05-31. USCG Northeast District Local Notice to Mariners 45/2026 GREENWICH BAY - WARWICK COVE General / Hazards To Navigation / Shoaling Reported RI-NARRAGANSETT BAY (CHART 13221)-GREENWICH BAY-WARWICK COVE Shoaling has been observed within the federal navigation channel to a least depth of 3 FT MLW. Shoaling is encroaching from the west and has impacted the western part of the channel, reducing the authorized project width from 150 feet to approx. 90 feet between Warwick Cove Buoy 3 (LLNR 19360) and Warwick Cove Buoy 7 (LLNR 19375). USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - WEST PASSAGE General / Autonomous Vessel Operations Location: 41-36.75N 071-24.45W Mariners are advised that Autonomous Underwater Vehicle (AUV) testing will be conducted dockside at Blue Economy Pier, slips 2 and 3, Quonset, Rhode Island, from 26 October through 13 November 2026, between 6:00 a.m. and 6:00 p.m. daily. The 19-foot AUV will remain stationary at the pier and will not enter the waterway. Mariners are advised to exercise caution when transiting in the vicinity and may contact personnel on VHF Channels 13 or 16. Valid 2026-10-08 to 2026-11-14. USCG Northeast District Local Notice to Mariners 45/2026 APPROACHES TO NEW YORK NANTUCKET SHOALS TO FIVE FATHOM BANK - WEST PASSAGE General / Hazards To Navigation / Hazards RI- NARRANGANSETT BAY - WEST PASSAGE – UNEXPLODED ORDNANCE-UPDATE 9/2/2022 Sixteen (16) unexploded ordnances have been located via survey in Narragansett Bay – West Passage in positions: (1.) 41-27.13N 071-24.59W; (2.) 41-27.43N 071-24.65W; (3.) 41-27.56N 071-24.64W (4.) 41-24.83N 071-22.97W (5.) 41-26.67N 071-24.71W (6.) 41-26.57N 071-24.14W; (7.) 41-26.00N 071-24.51W;(8.) 41-28.02N 071-24.48W; (9.) 41-24-43.74N 071-4.26.40W; (10.) 41-24.94N 071-21.99W; (11.) 41-24.88N 071-23.73W; (12.) 41-27.65N 071-24.12W; (13.) 41-26.07N 071-24.51W; (14.) 41-27-36.236N 071-24-37.026N; (15.) 41-26.75N 071-24.65W; (16.) 41-24.77N 071-21.66W. Mariners are urged to avoid the ordnances and transit the area with caution. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - WEST PASSAGE General / Miscellaneous Sunrise to sunset And further testing dates to be announced. Unmanned remote controlled vehicles will be conducting surface and aerial ground effect testing in the West Passage, Narragansett Bay, with speeds up to 50 knots. The unmanned vehicles will launch from the Port of Davisville. Mariners are advised to transit the area with extreme caution. "REGENT support boat Nautaplane will be standing by on Ch 13/16. Valid 2026-06-16 to 2026-06-19. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR SOUTHEASTERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - WEST PASSAGE General / Miscellaneous Location: 41-26.63N 071-20.63W 41-22.64N 071-18.81W 41-22.72N 071-27.44W 41-26.58N 071-24.95W 41-26.63N 071-20.63W Anduril Industries will conduct autonomous underwater vehicle testing in Rhode Island Sound from October 1, 2026, through December 31, 2026, daily from 0600 to 1800. Operations will involve a 19-foot autonomous underwater vehicle and support vessel F/V VOYAGER. The operating area is bounded by the approximate positions listed above. Mariners are requested to use caution when transiting the area. F/V VOYAGER may be contacted on VHF-FM channels 16 and 13. Once submerged and on mission, the AUV will be restricted in its ability to maneuver until it reaches its preset destination. the underwater vehicle will not operate in marked channels of separation schemes. Valid 2026-10-13 to 2026-12-31. USCG Northeast District Local Notice to Mariners 45/2026 SECTOR NORTHERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - WEST PENOBSCOT BAY General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes The attached Local Notice to Mariners (LNM) Information Form outlines upcoming maintenance work on the Porterfield Ledge Daybeacon (LLNR 4270), located in Rockport Harbor, Maine at latitude 44°09'14.6"N and longitude 69°03'41.3"W. Fuller Marine Services Inc., led by Sam and Chuck Fuller, will conduct activities to replace the steel structure, cap the granite superstructure, and stabilize the stone base. The project is scheduled to begin August 20, 2026, and will continue until completion, with daily operations from 7:00 AM to 6:00 PM. The vessel Enzo Charles will be present, monitoring VHF-FM Channels 16 and 13 for navigational safety, with secondary contact available on Channels 09 and 22A. To ensure safe passage, the Enzo Charles will maintain a clear fairway and reposition as needed within 30 minutes of notification, weather and safety permitting. Mariners should coordinate passing arrangements via VHF Channel 13 Valid 2026-08-20 to 2027-07-07. USCG Northeast District Local Notice to Mariners 45/2026 BUZZARDS BAY MAIN CHANNEL - WESTPORT HARBOR General / Hazards To Navigation / Shoaling Reported Location: Westport Channel has experienced significant shoaling, with considerable narrowing of the federal channel. Aids to navigation have been relocated outside the federal channel, to mark best water. Mariners are advised that shoaling has been identified and is unpredictable outside the federal channel, affecting both commercial and recreational vessels. Mariners without local knowledge are advised to transit with extreme caution and only during plus tides. Mariners are urged to use caution while transiting the area. Valid 2024-08-30 to 2039-12-31. USCG Northeast District Local Notice to Mariners 45/2026 BUZZARDS BAY MAIN CHANNEL - WESTPORT HARBOR General / Hazards To Navigation / Shoaling Reported MA-MARTHA'S VINEYARD TO BLOCK ISLAND (Chart 13218)-WESTPORT HARBOR Shoaling exists in Westport Harbor in the vicinity of Westport Harbor Channel LB 14 (LLNR 17490) and Westport Harbor Channel Buoy 17 (LLNR 17505). There are other areas of shoaling throughout the Westport Harbor Channel reducing the available depth of water. Mariners are advised to use caution while navigating this area USCG Northeast District Local Notice to Mariners 45/2026 BUZZARDS BAY MAIN CHANNEL - WEWEANTIC RIVER General / Bridges / Construction Massachusetts Department of Transportation (MassDOT) will conduct bridge demolition and replacement operations on the Route 6 Bridges over the Weweantic River in Marion and Wareham, MA. Beginning May 1, 2026 through September 10, 2028, multiple work boats, barges, cranes, and support equipment will be operating in the vicinity of the bridges. Construction activities may occur within multiple spans and channels; however, a navigable channel will remain open at all times. Construction equipment, including barges, cofferdams, and work platforms, will be present within and adjacent to the navigable channel. Short-term channel restrictions may occur during active construction operations, including pile driving, sheeting, and erection activities, and will be limited to periods when such operations are in progress. Mariners are advised to exercise caution and reduce wake when transiting the area. Mariners with questions or concerns may contact the contractor via VHF-FM Channels 13/16 or call Don Smith (413) 262-3687 or Jay Krutiak (413) 770-1723. Position 41-44.28N 070-44.80W USCG Northeast District Local Notice to Mariners 45/2026 WINTHROP HARBOR APPROACH - WINTHROP CHANNEL General / Marine Events / Regatta (Race) MA – WINTHROP – WINTHROP HARBOR – WINTHROP FROSTBITE SUNDAY SAILING SERIES – REGATTA – The Cottage Park Yacht Club is hosting the Winthrop Frostbite Sailing Series every Sunday, from 1:00 PM to 3:00 PM from November 8, 2026, to April 1, 2027, in and around the vicinity of Winthrop Harbor. The event will consist of approximately 15 sailing vessels 12’- 14’ in length with 2 support craft. The person responsible for on-scene safety can be reached on VHF CH 72 or by calling 617-784-7404. For more information, please contact Jonathan Bassett at 857-636-8144. Chart 13272 USCG Northeast District Local Notice to Mariners 45/2026 AIDS TO NAVIGATION DISCREPANCIES 368 aids reported with a discrepancy. NAME | LLNR | STATUS | AID TYPE Ambrose Channel Lighted Buoy 12 | 34850 | LT EXT | FD Ambrose Channel Lighted Gong Buoy 17 | 34880 | LT EXT | FD Annisquam River Channel Buoy 6 | 9620 | WATCHING PROPERLY | FD Arthur Kill Channel Lighted Buoy 18 | 36775 | OFF STATION | FD Barrington River Buoy 8 | 18780 | MISSING | PA Bass Harbor Head Gong Buoy WB | 2345 | OFF STATION | FD Beach Channel Lighted Buoy 5 | 34405 | MISSING | FD Bellport Shellfish Regulatory Buoy A | null | MISSING | PA Bellport Shellfish Regulatory Buoy B | null | MISSING | PA Bellport Shellfish Regulatory Buoy C | null | MISSING | PA Bellport Shellfish Regulatory Buoy D | null | MISSING | PA Bellport Shellfish Regulatory Buoy E | null | MISSING | PA Ash Creek Lighted Buoy 5 | 24755 | OFF STA | PA Race Rock Light | 19815 | LT EXT | FD McFarland Island Daybeacon | 5545 | STRUCT DMGD | PA Bristol Harbor East Channel Buoy 9 | 18194.2 | OFF STA/HAZ NAV | PA Bristol Harbor West Channel Buoy 3 | 18196.2 | OFF STA | PA Broadway Buoy 2A | 15767 | DISCONTINUED | FD Burlington Breakwater Light | 39625 | LT EXT | FD Cleveland East Ledge Light | 16080 | SS IMCH | FD West Island Channel Lighted Buoy 1 | 17046 | OFF STATION | PA EOM Lighted Research Buoy A | 16043 | MISSING | PA Mary Ann Rocks Lighted Whistle Buoy 12 | 13035 | MISSING | FD Carvers Harbor Entrance Light 2 | 3715 | DAYMK MISSING | FD Middle Back Rock Daybeacon | 1210 | DAYMK MISSING | FD Cobscook Bay Buoy 5 | 1005 | SINKING | FD ORPC Cobscook Bay Lighted Buoy A | 1013 | MISSING | PA Cohasset Gangway Lighted Bell Buoy 1G | 12220 | OFF STATION | FD Connecticut River Light 25 | 22610 | WATCHING PROPERLY | FD Connecticut River Light 35 | 22880 | WATCHING PROPERLY | FD Hypocrite Ledge Daybeacon H | 5260 | DAYMK DMGD | FD Damariscotta River Buoy 12 | 5350 | MISSING | FD Glidden Ledge Daybeacon 16 | 5370 | STRUCT DMGD | FD Dickerson Channel Buoy 2 | 29420 | MISSING | FD Dickerson Channel Buoy 3 | 29425 | MISSING | FD Dickerson Channel Buoy 4 | 29430 | MISSING | FD Dickerson Channel Buoy 5 | 29435 | MISSING | FD Dickerson Channel Buoy 6 | 29440 | MISSING | FD Pleasure Bay Light | 11235 | LT EXT | PA East Channel Buoy 11 | 29265 | MISSING/TRUB | FD East Channel Buoy 23 | 29297 | Status Unreported | FD Atlantique Entrance Buoy 2 | 29268 | OFF STATION | PA Coddington Cove Breakwater Light 18 | 18005 | DAYMK MISSING | FD East River Regulatory Light E | 27246.4 | OFF STA/HAZ NAV | PA East River Regulatory Light C | 27246.2 | STRUCT DEST | PA Erie Basin Entrance Light 2 | 36895 | LT EXT | FD Essex Bay Entrance Lighted Bell Buoy 1 | 9480 | RBN IMCH/BUOY DMGD | FD Falmouth Lighted Bell Buoy 16 | 15105 | LT EXT | FD Fire Island Inlet Lighted Whistle Buoy FI | 29110 | OFF STATION | FD Fire Island Inlet Lighted Buoy 3 | 29130 | LT EXT | FD Fire Island Inlet Lighted Buoy 8 | 29145 | LT EXT | FD Flanders Bay Lighted Buoy 2 | 28905 | MISSING | FD Flanders Bay Lighted Buoy 4 | 28910 | MISSING | FD Flanders Bay Buoy 5 | 28915 | MISSING | FD Flanders Bay Buoy 7 | 28920 | MISSING | FD Flanders Bay Lighted Buoy 8 | 28925 | MISSING | FD Flanders Bay Lighted Buoy 9 | 28930 | MISSING | FD Peconic River Lighted Buoy 4 | 28980 | LT EXT | PA Red Creek Pond Entrance Buoy 3 | 28895 | ADRIFT | PA Fox Ears Daybeacon 22 | 3955 | STRUCT DEST | FD Egg Rock Light | 1865 | SS IMCH | FD Gardiners Bay South Entrance Buoy 8 | 27755 | MISSING | FD Goodwives River Mid-Channel Buoy A | 25121 | LT EXT | PA Great South Bay Buoy 30 | 29340 | OFF STATION | FD Mud Creek Buoy 4 | 29797 | OFF STA | PA Fox Creek Channel Lighted Buoy 9 | 29640 | OFF STA | PA Barrett Beach Lighted Buoy 4 | 29925 | OFF STA/HAZ NAV | PA Watch Hill Channel Range Front Light | 30050 | MISSING | PA Watch Hill Channel Range Rear Light | 30055 | MISSING | PA Watch Hill Channel Lighted Buoy 6 | 30015 | OFF STATION | PA Greenwich Bay Light 8 | 19415 | LT EXT | PA Patience Island Lighted Bell Buoy 8 | 19340 | OFF STATION | FD West River Entrance Buoy 1W | 23770 | MISSING | PA Hamburg Cove Entrance Buoy 4 | 22710 | OFF STA | PA Hamburg Cove Entrance Buoy 6 | 22720 | OFF STA | PA Hamburg Cove Buoy 15 | 22745 | OFF STA | PA Hamburg Cove Buoy 17 | 22750 | OFF STA | PA Hamburg Cove Buoy 19 | 22755 | OFF STA | PA Hamburg Cove Entrance Buoy 7 | 22723 | SINKING/ADRIFT | PA Hampton Harbor Channel Buoy 7 | 8940 | MISSING | FD Hingham Harbor Approach Buoy 7 | 11995 | SINKING | FD Hog Island Channel Lighted Buoy 19 | 16215 | LT EXT | FD Hog Island Channel Lighted Buoy 19 | 16215 | SINKING | FD Haverstraw Bay North Reach Range Front Light | 37900 | LT EXT | FD Hudson River Lighted Buoy 56 | 38080 | LT IMCH | FD Hudson River Lighted Buoy 74 | 38285 | LT IMCH | FD Hudson River Lighted Buoy 133 | 38585 | OFF STATION | FD Hudson River Buoy 137 | 38595 | BUOY DMGD | FD Hudson River Buoy 173 | 38757 | MISSING | FD Hudson River Light 180 | 38785 | LT EXT | FD Adams Island Obstruction Buoy | 39035 | MISSING | FD Greens Cove Channel Lighted Buoy 1 | 37910 | OFF STA/HAZ NAV | PA Huntington Harbor Channel Lighted Buoy 9 | 26565 | LT EXT | PA The Washers Buoy 2 | 3320 | SINKING/HAZ NAV | FD Isle Au Haut Light | 3360 | LT EXT | FD Sunken Egg Rock Buoy 1 | 2780 | SINKING | FD Long Ledge Daybeacon LL | 2790 | MISSING | FD Roaring Bull Lighted Bell Buoy 2 | 3190 | MISSING | FD Jones Inlet Lighted Buoy 16 | 30975 | MISSING | FD Hicks Ledge Junction Buoy HL | 25735 | OFF STATION | FD Little Narragansett Bay Buoy 7 | 20215 | WATCHING PROPERLY | FD Little Narragansett Bay Buoy 9 | 20220 | WATCHING PROPERLY | FD Corey Creek Entrance Buoy 6 | 28530 | MISSING/HAZ NAV | PA Little River Ledge Buoy 2 | 1085 | HAZ NAV/SINKING/TRLB | FD Logan Airport Security Zone Buoy 16 | 11033 | OFF STATION | PA Logan Airport Security Zone Buoy 13 | 11099 | OFF STATION | PA Logan Airport Security Zone Buoy 9 | 11119 | OFF STATION | PA Logan Airport Security Zone Buoy 10 | 11116 | OFF STATION | PA Mount Sinai Jetty Hazard Daybeacon A | null | LT EXT | PA Mount Sinai Jetty Hazard Daybeacon B | null | LT EXT | PA Mount Sinai Harbor Buoy 10 | 26110 | OFF STATION | PA Nissequogue River Lighted Buoy 4 | 26325 | MISSING | PA Lilco Basin Lighted Buoy 3 | 26385 | MISSING | PA Nobska Point Lighted Bell Buoy 26 | 15555 | MISSING | FD Nobska Point Light | 15560 | LT EXT | FD Watch Hill Lighted Bell Buoy 2 | 20025 | LT EXT | FD Napatree Point Ledge Lighted Bell Buoy 6 | 20045 | LT EXT | FD Napatree Point Ledge Lighted Bell Buoy 6 | 20045 | LT EXT | FD East Clump Buoy 19 | 20100 | SINKING | FD Seaflower Reef Light | 20155 | LT EXT | FD Gowanus Flats Lighted Buoy 32 | 34990 | OFF STATION | FD Pier 9 Northeast Lighted Hazard Buoy | null | MISSING | PA Ellis Island Security Zone Buoy ELSZ1 | 35006 | MISSING | PA Ellis Island Security Zone Buoy ELSZ10 | 35006.9 | MISSING | PA Ellis Island Security Zone Buoy ELSZ7 | 35006.6 | MISSING | PA Ellis Island Security Zone Buoy ELSZ2 | 35006.1 | MISSING | PA Liberty Island Security Zone Buoy LISZ2 | 37247.1 | MISSING | PA Liberty Island Security Zone Buoy LISZ3 | 37247.200000000004 | MISSING | PA Liberty Island Security Zone Buoy LISZ1 | 37247 | OFF STA | PA Mamaroneck Harbor Channel Lighted Buoy 10 | 25620 | MSLD SIG | FD Menemsha Creek Entrance Lighted Bell Buoy 1 | 15950 | OFF STATION | FD Merrimack River Lighted Buoy 8 | 9035 | OFF STATION | FD Missisquoi Bay Lighted Research Buoy | 39347 | MISSING | FD EAST MISSISQUOI BAY LIGHTED RESEARCH BUOY | 39348 | ESTABLISHED | FD Lake Montauk Lighted Buoy 13 | 19975 | MISSING | PA Bay Ledge Buoy 2 | 1275 | SINKING | FD Gilchrist Rock Daybeacon 3 | 1280 | DAYMK MISSING | FD Moosabec Bar Buoy 12 | 1320 | MISSING | FD Moriches Bay Danger Buoy West | 30304 | MISSING | FD Moriches Bay Lighted Buoy 24 | 30330 | OFF STATION | FD Moriches Bay Danger Buoy East | 30333 | MISSING | FD Seatuck Cove Buoy 6 | 30360 | OFF STA | PA Moriches Inlet West Cut Buoy 4W | 29106 | MISSING | FD Moriches Inlet East Cut Rock Lighted Hazard Buoy | 29109 | OFF STA | PA Brayton Point Channel Lighted Buoy 3 | 18910 | HAZ NAV/SINKING/LT EXT | PA Brayton Point Channel Front Range Light | 18915 | LT EXT | PA Garden Island Ledge Daybeacon 9 | 4615 | STRUCT DMGD | FD Moser Ledge Isolated Danger Buoy DM | 4960 | MISSING | FD Roaring Bull Daybeacon 2 | 10495 | DAYMK DMGD | FD ARII Broad Sound Wave Research Lighted Buoy | 10563 | MISSING | PA Nantasket Roads DRC Lighted Hazard Buoy A | 11411 | MISSING | PA National Dock Channel Buoy 3 | 37215 | MISSING | FD NOAA Data Lighted Buoy 44005 (ODAS) | 820 | ADRIFT | FD New Bedford Southeast Approach Bell Buoy 2SE | 16960 | OFF STATION | FD Buzzards Bay Environmental Monitoring Lighted Buoy | 16963 | WATCHING PROPERLY | PA Clark Ledge Light 3 | 925 | LT EXT | FD New Jersey Pierhead South Entrance Lighted Buoy 2 | 37015 | MISSING | FD New Jersey Pierhead South Channel Lighted Buoy P | 37038 | LT EXT | FD Frank Ledge Buoy F | 21840 | OFF STATION/SINKING | FD New London Harbor Buoy 16 | 21943 | MISSING | FD North Channel Light 24 | 33800 | LT EXT | PA Chimney Corner Reef Buoy 20 | 21600 | OFF STATION/SINKING | FD Oak Island Channel Buoy 2 | 31385 | MISSING | FD Oak Island Channel Buoy 3 | 31390 | MISSING | FD Oak Island Channel Buoy 4 | 31395 | MISSING | FD Oak Island Channel Buoy 5 | 31400 | MISSING | FD Oak Island Channel Buoy 6 | 31405 | MISSING | FD Oak Island Channel Buoy 7 | 31410 | MISSING | FD Oak Island Channel Buoy 8 | 31415 | MISSING | FD Oak Island Channel Entrance Lighted Buoy 9 | 31420 | MISSING | FD Emery Island Daybeacon 1 | 4680 | STRUCT DEST | FD Oyster Bay Lighted Buoy 5 | 26885 | BUOY DMGD | FD Oyster Bay Harbor Channel Junction Lighted Buoy B | 26895 | LT EXT | PA Oyster Bay Harbor Alternate Channel Buoy 4A | 27045 | BUOY DMGD | PA Oyster Bay Harbor Inner Channel Lighted Buoy 4B | 27000 | OFF STATION | PA Sandspit Buoy 1 | 29766 | OFF STATION | PA Pawcatuck River Channel Daybeacon 22 | 20365 | STRUCT MISSING | PA Pawcatuck River Channel Daybeacon 22 | 20365 | STRUCT MISSING | PA Phinneys Harbor Light 7 | 16670 | DAYMK MISSING | FD Plum Island Sound Entrance Buoy 6 | 9320 | MISSING | FD Plum Island Sound Entrance Buoy 8A | 9328 | SINKING | FD Bass Rock Daybeacon BR | 9340 | DAYMK MISSING | FD ARII Plymouth Bay Wave Research Lighted Buoy | 12550 | MISSING | PA Plymouth Beach Jetty Daybeacon | 12935 | MISSING | FD Point Judith Harbor of Refuge East Entrance Light 3 | 19490 | STRUCT DEST/STRUCT MISSING | FD Point Judith Harbor of Refuge West Entrance Lighted Buoy 2W | 19501 | STRUCT DEST/STRUCT MISSING | FD Point Judith Harbor of Refuge West Entrance Light 3 | 19505 | DAYMK DMGD | FD Tide Mill Yacht Basin Channel Buoy 1 | 25556.100000000002 | HAZ NAV/SINKING | PA Port Jefferson Harbor Buoy 4 | 26165 | MISSING/TRUB | FD Port Jersey Channel Range Rear Light | null | LT IMCH | PA Broad Cove Rock Buoy 5 | 7525 | OFF STATION | FD South Beacon Shoal Lighted Buoy 11 | 8385 | OFF STATION | FD Boston Main Channel Lighted Buoy 1 | 10865 | OFF STATION | FD New England Aquarium Intake Buoy | 10950 | MISSING | PA Bullock Point Light BP | 18345 | LT EXT | FD Green Jacket Shoal Buoy 2 | 18585 | OFF STATION | FD Green Jacket Shoal Buoy 4 | 18590 | OFF STATION | FD Green Jacket Shoal Buoy 6 | 18595 | OFF STATION | FD Providence River Approach Channel Lighted Buoy 13 | 18295 | MISSING | FD Providence River Approach Channel Lighted Buoy 13 | 18295 | MISSING/TRLB | FD Prudence Island Monitoring Lighted Buoy | 18241 | REDUCED INT | PA Quicks Hole Entrance Lighted Bell Buoy 1 | 15910 | LT EXT | FD Davisville Turning Basin Buoy 18 | 19250 | OFF STATION | PA Raritan Bay Light 58 | 36315 | LT EXT | FD Perth Amboy Port Authority No Wake Lighted Buoy A | 36585 | MISSING | PA Perth Amboy Port Authority No Wake Lighted Buoy B | 36586 | MISSING | PA Perth Amboy Port Authority No Wake Lighted Buoy C | 36587 | MISSING | PA Perth Amboy Port Authority No Wake Lighted Buoy D | 36588 | MISSING | PA Bassetts Island Shoal South Buoy 1 | 16540 | MISSING | FD Reynolds Channel Buoy 14 | 32090 | MISSING | FD Reynolds Channel Buoy 16 | 32305 | MISSING | FD Reynolds Channel Buoy 15 | 32530 | MISSING | FD Reynolds Channel Buoy 21 | 32550 | MISSING | FD Reynolds Channel Lighted Buoy 24 | 32555 | MISSING | FD Robinsons Hole Buoy 10 | 15900 | MISSING | FD Rockland Harbor Bypass Channel Buoy 12 | 4205 | SINKING | FD Elisha Ledge Buoy EL | 17555 | MISSING | FD Bowditch Ledge Daybeacon | 10025 | STRUCT DEST | FD Endeavors Rock Daybeacon | 10152 | DAYMK MISSING | FD Dodge Rock Daybeacon 2 | 9840 | MISSING/HAZ NAV | FD Anchorage Buoy E | 35525 | MISSING | FD Atlantic Highlands Light 4 | 35596.4 | SINKING | PA Sandy Hook Channel Lighted Buoy 5 | 35110 | OFF STATION | FD Saquatucket Harbor Buoy 8 | 14055 | DISCONTINUED FOR DREDGING | FD Sasanoa River Buoy 39 | 5990 | OFF STATION | FD WHOI Traffic Separation Scheme Research Lighted Buoy AB-2 | 466 | MISSING | PA WHOI Traffic Separation Scheme Research Lighted Buoy AB-3 | 467 | MISSING | PA WHOI Traffic Separation Scheme Research Lighted Buoy AB-4 | 468 | MISSING | PA WHOI Traffic Separation Scheme Research Lighted Buoy AB-5 | 471 | MISSING | PA WHOI Traffic Separation Scheme Research Lighted Buoy AB-6 | 472 | MISSING | PA WHOI Traffic Separation Scheme Research Lighted Buoy AB-7 | 473 | MISSING | PA WHOI Traffic Separation Scheme Research Lighted Buoy AB-8 | 496 | MISSING | PA WHOI Traffic Separation Scheme Research Lighted Buoy AB-9 | 497 | Status Unreported | PA WHOI Traffic Separation Scheme Research Lighted Buoy AB-10 | 498 | MISSING | PA WHOI Traffic Separation Scheme Research Lighted Buoy AB-1 | 415 | MISSING | PA Boston Approach Lighted Buoy BG | 385 | OFF STATION | FD Boston Approach Lighted Buoy BG | 385 | OFF STATION | FD The Graves Light | 390 | LT EXT | FD NOAA Data Lighted Buoy 44018 | 560 | LT EXT | FD WHOI Cape Ann Lighted Research Buoy DMON | 366 | OFF STATION | PA Neptune LNG Deepwater Port Lighted Hazard Buoy | 369.5 | MISSING | PA Northeast Gateway Support Vessel Mooring Buoy | 374.1 | MISSING | PA ARII Lighted Research Buoy NI | 12324 | MISSING | PA Highlands Light | 35025 | LT IMCH | PA Empire Offshore Wind WTG C12 | 604.45 | LT EXT | PA Cape Ann Light | 295 | SS INOP | FD Fir Point Ledge Lighted Buoy 3 | 2490 | LT EXT | FD Penobscot Bay Lighted Buoy WP | 3302 | MISSING | FD Three Fathom Ledge Isolated Danger Lighted Buoy DTF | 3307 | MISSING | FD The Breakers Sunken Ledge Buoy 2 | 3750 | OFF STATION | FD Buzzards Bay Entrance Light | 630 | LT EXT | FD USACE Data Lighted Buoy Station 154/NDBC 44097 | 635 | BUOY DMGD | FD Block Island Wind Farm WTG-3 Fog Horn | 654.5 | SS INOP | PA Vineyard Wind 1 WTG AU39 | 600.01 | LT EXT | PA Vineyard Wind 1 WTG AS42 | 600.19 | LT EXT | PA Vineyard Wind 1 WTG AQ40 | 600.28 | LT EXT | PA Revolution Wind WTG AP11 | 602.65 | LT EXT | PA Vineyard Wind 1 WTG AQ39 | 600.16 | LT EXT | PA Vineyard Wind WTG AW38 | 600.0500000000001 | LT EXT | PA Vineyard Wind 1 WTG AP35 | 600.4300000000001 | LT IMCH | PA Vineyard Wind 1 WTG AP38 | 600.02 | LT EXT | PA Vineyard Wind 1 WTG AR38 | 600.1800000000001 | LT EXT | PA Vineyard Wind 1 WTG AN39 | 600.3100000000001 | LT EXT | PA Vineyard Wind Lighted Research Buoy C | 589.8000000000001 | ADRIFT | PA Vineyard Wind 1 WTG AU40 | 600.24 | LT EXT | PA Vineyard Wind 1 WTG AR39 | 600.04 | LT EXT | PA Vineyard Wind 1 WTG AS41 | 600.13 | LT EXT | PA Revolution Wind WTG AE11 | 602.02 | SS INOP | PA Revolution Wind WTG AJ10 | 602.16 | SS INOP | PA Revolution Wind WTG AL21 | 602.1 | SS INOP | PA Revolution Wind WTG AP11 | 602.65 | SS INOP | PA Sunrise Wind WTG AU11 | 603.12 | LT EXT | PA Vineyard Wind 1 WTG AS40 | 600.17 | LT EXT | PA Sunrise Wind WTG AU12 | 603.13 | LT EXT | PA Vineyard Wind 1 WTG AN38 | 600.21 | LT EXT | PA Revolution Wind WTG AM14 | 602.45 | SS INOP | PA Vineyard Wind 1 WTG AN39 | 600.3100000000001 | LT EXT | PA Revolution Wind WTG AJ02 | 602.08 | SS INOP | PA Revolution Wind WTG AJ04 | 602.6 | SS INOP | PA Revolution Wind WTG AM21 | 602.11 | SS INOP | PA Sankaty Head Light | 555 | Status Unreported | FD Pollock Rip Channel Buoy 5 | 13540 | MISSING | FD Pollock Rip Channel Lighted Buoy 8 | 13550 | MISSING | FD Nantucket Harbor Range Rear Light | 15165 | LT IMCH | FD Muskeget Channel Buoy 3 | 15365 | SINKING | FD Oak Bluffs North Breakwater Light 2 | 15460 | TRLB | FD Great Round Shoal Channel Lighted Buoy 2 | 13586 | OFF STATION | FD Great Round Shoal Channel Lighted Buoy 13 | 13640 | OFF STATION | FD Nantucket Sound Channel Lighted Buoy 21A | 13717 | LT EXT | FD Block Island Old Harbor Channel Buoy 5 | 19695 | OFF STATION | FD Block Island Old Harbor Channel Breakwater Light 3 | 19720 | LT IMCH | FD Revolution Wind WTG AJ15 | 602.64 | SS INOP | PA Clough Point Buoy 25 | 5810 | OFF STATION | FD Shelter Island Sound North Channel Lighted Whistle Buoy N | 27960 | OFF STATION | FD Long Beach Bar Light | 27975 | LT EXT | FD Dering Harbor Buoy 7 | 28100 | OFF STATION | PA Stirling Basin Buoy 7 | 28063 | OFF STATION | PA Shinnecock Inlet Breakwater Light 2 | 29042 | REDUCED INT/STRUCT DMGD | FD Shooters Island South Channel Wreck Lighted Buoy WR1 | 37374 | MISSING/HAZ NAV | PA Sloop Channel Light 4 | 31010 | BUOY DMGD/TRUB | FD Sloop Channel Buoy 19 | 31090 | MISSING | FD Gilpatrick Cove Daybeacon 4 | 2190 | DAYMK MISSING | FD Middle Rock Lighted Buoy 5 | 2195 | LT EXT | FD Myrtle Ledge Buoy 6 | 2200 | MISSING | FD Sargents Point Buoy 2SP | 2205 | MISSING | FD South River Buoy 6 | 12365 | OFF STATION | PA Lords Passage Buoy 2L | 20010 | ADRIFT | FD Southport Harbor Light 7 | 24785 | LT EXT | FD Pemaquid Ledge Buoy PL | 5135 | OFF STATION | FD Southwest Approach Buoy 10 | 16780 | MISSING | FD Stage Harbor Lighted Buoy 8 | 13895 | DISCONTINUED FOR DREDGING | FD State Boat Channel Daybeacon 3 | 31120 | DAYMK MISSING | FD State Boat Channel Buoy 5 | 31125 | MISSING | FD State Boat Channel Lighted Buoy 15 | 31175 | MISSING | FD State Boat Channel Buoy 16 | 31180 | MISSING | FD State Boat Channel Lighted Buoy 35 | 31235 | MISSING | FD State Boat Channel Light 42 | 31255 | LT EXT | FD State Boat Channel Buoy 54 | 31295 | MISSING | FD State Boat Channel Buoy 55 | 31300 | MISSING | FD State Boat Channel Buoy 56 | 31305 | MISSING | FD State Boat Channel Buoy 59 | 31320 | MISSING | FD State Boat Channel Buoy 61 | 31325 | MISSING | FD State Boat Channel Lighted Buoy 64 | 31340 | MISSING | FD State Boat Channel Buoy 75 | 31435 | MISSING | FD State Boat Channel Buoy 76 | 31436 | MISSING | FD State Boat Channel Buoy 78 | 31445 | MISSING | FD State Boat Channel Buoy 79 | 31450 | MISSING | FD State Boat Channel Buoy 81 | 31460 | MISSING | FD State Boat Channel Buoy 86 | 31470 | OFF STATION | FD State Boat Channel Lighted Buoy 87 | 31475 | LT EXT | FD State Boat Channel Lighted Buoy 87 | 31475 | MISSING | FD State Boat Channel Lighted Buoy 90 | 31487 | MISSING | FD Allen Point Railroad South Light 2 | 39490 | LT EXT | PA Stonington Outer Breakwater Light 4 | 20170 | LT EXT | FD Romer Shoal Light | 35070 | SS INOP | FD Sandy Hook Light | 35040 | WATCHING PROPERLY | FD Naval Weapon Station Earle Security Zone Lighted Buoy 1 | 35660 | LT EXT | FD Naval Weapon Station Earle Security Zone Lighted Buoy 6 | 35685 | OFF STATION | FD Thames River Buoy 20 | 22080 | OFF STATION | FD Kingston Channel Buoy 42 | 12895 | MISSING | PA Kingston Channel Buoy 40 | 12890 | MISSING | PA The Reach Rock Lighted Buoy 2 | 3765 | OFF STATION | FD Threemile Harbor East Breakwater Light | 27790 | DAYMK MISSING | PA Tiverton Upper Channel Buoy 2 | 18815 | OFF STATION | FD Union River Channel Buoy 2 | 2445 | MISSING | FD Union River Channel Lighted Buoy 6 | 2455 | MISSING | FD Union River Channel Lighted Buoy 6 | 2455 | MISSING | FD Union River Channel Buoy 7 | 2460 | MISSING | FD Union River Channel Buoy 9 | 2465 | MISSING | FD Union River Channel Buoy 11 | 2470 | MISSING | FD Upper Kennebec River Buoy 8 | 6205 | MISSING | FD Massapequa Cove Daybeacon 4 | 34200 | DAYMK DMGD | PA Carman Creek Daybeacon D8 | 34155 | DAYMK MISSING | PA Carman Creek Daybeacon D10 | 34160 | DAYMK MISSING | PA Carman Creek Daybeacon D6 | 34150 | DAYMK MISSING | PA Amity Channel Light 94 | 34075 | LT EXT | PA Billingsgate Shoal Lighted Bell Buoy 1 | 13160 | OFF STATION | FD James Longstreet Isolated Danger Lighted Buoy DJ | 13174 | OFF STATION/TRLB | FD Billingsgate Flat Lighted Buoy 3 | 13180 | MISSING | FD Billingsgate Lighted Buoy 5 | 13185 | SINKING | FD Wellfleet Harbor Channel Buoy 12 | 13210 | OFF STATION | FD Porterfield Ledge Daybeacon | 4270 | DAYMK DMGD | FD Spectacle Island Lighted Hazard Buoy C | 11587 | MISSING | PA Westport Harbor Approach Lighted Bell Buoy 1 | 17445 | LT EXT | FD Wareham River Buoy 13 | 17250 | OFF STATION | FD Wareham Regulatory Buoy A | null | OFF STA | PA Weweantic River Buoy 15 | 17297.5 | Status Unreported | PA Wareham River Buoy 28 | 17295 | DISCONTINUED FOR DREDGING | FD Abbreviations: ADRIFT adrift; DAYMK DMGD daymark damaged; DAYMK MISSING daymark missing; ESTABLISHED established; HAZ NAV hazard to navigation; LT EXT light extinguished; LT IMCH light improper characteristic; MISSING missing; MSLD SIG misleading signal; OFF STA off station; OFF STATION off station; SINKING sinking; STRUCT DEST structure destroyed; STRUCT DMGD structure damaged; STRUCT MISSING structure missing; TRLB temporarily replaced by lighted buoy; TRUB temporarily replaced by unlighted buoy; WATCHING PROPERLY watching properly (corrected). FD federal aid, PA private aid. USCG Northeast District Local Notice to Mariners 45/2026

Recent active messages

  • SECTOR NEW YORK, SUBMERGED LANDS ACT (SLA) General / LAA / RNA / Safety Zone A 500-meter Safety Zone will be enforced around Empire Wind operations from 8:00am, November 11, 2026, to 8:00am, November 18, 2026, Mariners are to avoid transiting within 500 meters of the following positions: C09: 40°20′25.307N, 073°26′50.160W; E08: 40°18′57.671N, 73°27′43.888W; D10: 40°19′34.629N, 73°25′59.594W; B05: 40°21′45.973N, 73°30′15.333W; D17: 40°18′24.335N, 73°19′59.229W; D19: 40°18′04.195N, 73°18′16.307W;

  • MAIN CHANNEL - HUDSON RIVER General / Marine Construction (Excluding Bridges) / Dredging Location: 41-37.37N 073-56.94W Tilcon New York, Inc. will conduct maintenance dredging at the Tilcon Clinton Point Quarry, Sheafe Road, Poughkeepsie, NY 12601, in the Hudson River near latitude 41°37'27.0" N, longitude 73°56'34.1" W. Work is anticipated to occur from November 16 through November 23, 2026, 24 hours a day, seven days a week. Operations will involve a barge-mounted crane equipped with an enviro

  • SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) - SECTOR SOUTHEASTERN NEW ENGLAND, TERRITORIAL SEA General / LAA / RNA / Safety Zone A 500-meter Safety Zone may be enforced around Ørsted Northeast Program operations from 8:00am, November 11, 2026, to 8:00am, November 18, 2026, Mariners are to avoid transiting within 500-meters of the following positions: Revolution Wind Lease Area 486 Offshore Substations (OSS): AF08: 41-12.60N 071-07.70W, AL11: 41-07.69N 071-03.54W. Sunrise Wind

  • BRONX RIVER General / Bridges Location: 40-49.69N 073-56.03W Bridge Name: Macombs Dam Bridge The Coast Guard proposes to temporarily modify the operating regulation that governs the Macombs Dam Bridge across the Harlem River, mile 3.2, between the Boroughs of Manhattan and the Bronx, New York City, New York. The bridge owner, New York City Department of Transportation (NYCDOT), submitted a request on August 31, 2026, to allow the bridge to remain in the closed position from February 1, 2027, thr

  • PRESIDENT ROADS - CHELSEA RIVER General / Bridges / Inspection NDT Corporation has another temporary bridge inspection and testing project planned for this year working for Hardesty and Hanover and for the MassDOT. Below are a few summary bullets for the Andrew McArdle bridge project (Meriden Street over the Chelsea River). • The owners of this bridge are the City of Chelsea and City of Boston. • No work will be conducted in the main channel at this crossing. • Work will be completed on the 12 i

  • WINTHROP HARBOR APPROACH - WINTHROP CHANNEL General / Marine Events / Regatta (Race) MA – WINTHROP – WINTHROP HARBOR – WINTHROP FROSTBITE SUNDAY SAILING SERIES – REGATTA – The Cottage Park Yacht Club is hosting the Winthrop Frostbite Sailing Series every Sunday, from 1:00 PM to 3:00 PM from November 8, 2026, to April 1, 2027, in and around the vicinity of Winthrop Harbor. The event will consist of approximately 15 sailing vessels 12’- 14’ in length with 2 support craft. The person responsible fo

  • MAIN CHANNEL - BAY RIDGE CHANNEL General / Marine Construction (Excluding Bridges) / Dredging Cashman Dredging and Marine Contracting Co., LLC will conduct environmental-remediation dredging operations in the Gowanus Canal, Brooklyn, NY, from the 3rd Street Bridge to the Hamilton Avenue Bridge, between approximately 40°40'33.80" N, 073°59'25.04" W and 40°40'05.39" N, 074°00'02.94" W. Operations are scheduled from November 16, 2026, through November 15, 2027, weekdays from 7:00 a.m. to 6:00 p.m.

  • NEWARK BAY - PORT NEWARK PIERHEAD CHANNEL General / Marine Construction (Excluding Bridges) / Boring and Core Samples Aqua Survey, Inc. will conduct sediment sampling in the Newark Bay Federal Navigation Channel, Newark, NJ, from November 9 through November 25, 2026. Operations will occur Monday through Friday, from 8 a.m. to 4 p.m. Vessels R/V TESLA and R/V PRATTIS will be on scene and monitoring VHF-FM Channels 13 and 16. The vessels can move on demand to avoid impeding navigation. Mariners ar

  • MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Bridges / Inspection On November 14, 2026, and November 17, 2026, between 6:00 a.m. and 2:00 p.m., a bridge traveler will be operated under the Brooklyn Bridge over East River at mile 0.8 to perform a bridge inspection. Mariners requiring full vertical clearance can contact the contractor via marine radio VHF-FM Ch. 13/16 or call 917-295-1856 or 917-471-2257. The traveler platform will be moved out of the navigable channel after work hours or when

  • MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Bridges / Inspection Location: 40-45.42N 073-57.28W Bridge Name: Queensboro Bridge Valid 2026-11-12 to 2026-11-14. USCG Northeast District Local Notice to Mariners 45/2026

  • MAIN CHANNEL - EAST RIVER MAIN CHANNEL General / Bridges / Maintenance Location: 40-45.42N 073-57.28W Bridge Name: Queensboro Bridge On November 13, 2026, between 9:00 a.m. and 2:00 p.m., a bridge traveler will be operated under the Queensboro Bridge over East River at mile 5.5 to perform bridge inspection. Mariners requiring full vertical clearance can contact the contractor via marine radio VHF-FM Ch. 13/16 or call 917-295-1856 or 917-471-2257. The traveler platform will be moved out of the na

  • PROVIDENCE RIVER APPROACH - PROVIDENCE RIVER General / Bridges / Inspection Location: 41-49.08N 071-24.22W Bridge Name: Point St Bridge From November 16, 2026, to November 20, 2026, between 8:00 am to 4:00 pm, a 28’ aqualift CAT (CT0790BL) will be utilized to inspect Point Street Bridge across Providence River at mile 7.5, in Providence, RI. Mariners requiring full horizontal clearance can contact the contractor via marine radio VHF-FM Ch 13/16 or by calling (410) 294-6092 or (207) 356-0242. Mar

  • BUZZARDS BAY MAIN CHANNEL - HOG ISLAND CHANNEL General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 41-44.26N 070-37.51W 41-44.25N 070-37.47W 41-44.24N 070-37.50W 41-44.25N 070-37.53W 41-44.26N 070-37.51W ACK Marine will be conducting dive operations for fender repairs on the Mass Maritime Academy Pier. Request reduced speed when operating in the area. Valid 2026-11-13 to 2026-11-17. USCG Northeast District Local Notice to Mar

  • SECTOR SOUTHEASTERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - BUZZARDS BAY MAIN CHANNEL General / Autonomous Vessel Operations The Woods Hole Oceanographic Institution (WHOI) will deploy the Pyxis AUV in Buzzards Bay (41.574, -70.721) after which it will transit the length of the Bay, turn (41.447, -71.008) and transit due south before returning along the same route 2-4 days later. The Intended track appears below. The autonomous underwater vehicle (AUV) is 9’ long and 12” in diameter. It is yell

  • HUDSON RIVER General / Bridges Location: 42-30.50N 073-46.46W Bridge Name: Alfred Smith Memorial Bridge CSX Railroad Bridge The navigational lights are not active on the CSX Alfred H. Smith Memorial Bridge, AKN Castleton Bridge, across the Hudson River, mile 135.8, between Selkirk and Castleton-on-the-Hudson, New York. CSX is obtaining parts. Estimated repair time is unknown at this time. Mariners are advised to proceed with caution and reduce wake. Valid 2026-11-10 to 2026-11-13. USCG Northeast

  • NEW ROCHELLE HARBOR NORTH APPROACH General / Bridges Location: 40-53.34N 073-46.95W Bridge Name: Glen Island Bridge The Coast Guard has issued a temporary deviation for the Glen Island Temporary Bridge. Under this temporary deviation, the Glen Island Temporary Bridge will not open for marine traffic from November 16, 2026 through November 18, 2026. Mariners that can pass without a bridge opening may do so and are advised to exercise caution when transiting the area. Valid 2026-11-10 to 2026-11-1

  • MAIN CHANNEL - BUTTERMILK CHANNEL General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Location: 40-40.98N 074-01.38W Mariners are advised that marine demolition and construction operations will be conducted at Yankee Pier, Governors Island, near Craig Road South and Half Moon Road, in the vicinity of 40°40'58.8"N, 074°01'22.8"W, from November 10, 2026, through December 6, 2028. Work includes demolition of existing piers and a boat hois

  • EAST RIVER MAIN CHANNEL General / Bridges Location: 40-47.96N 073-47.62W Bridge Name: Throgs Neck Bridge Beginning November 20, 2026 through July 16, 2026, contractor Navillus, will be performing pier rehabilitation at the Throgs Neck Bridge across East River at mile point 15.8. To perform this work contractors will be utilizing a barge, HUGHES 115 (114 ft x 35 ft x 8 ft, light draft 2 ft 6 in). Bridge rehabilitation will take place at pier 42, 44, and 17. Mariners with any questions can contact

  • BOSTON NORTH CHANNEL - PRESIDENT ROADS General / Marine Construction (Excluding Bridges) / Boring and Core Samples Location: 42-20.77N 071-01.38W 42-20.73N 071-01.38W 42-20.72N 071-01.51W 42-20.74N 071-01.51W 42-20.77N 071-01.38W MASSACHUSETTS – BOSTON – BOSTON INNER HARBOR – NORTH JETTY- Jetty Boring Operations Mariners are advised that Childs Engineering and Ocean Surveys Inc will be conducting core sampling in the vicinity of the North Jetty from November 3, 2026, through November 13, 2026. W

  • SLOOP CHANNEL General / Bridges Location: 40-35.95N 073-32.59W Bridge Name: Meadowbrook State Parkway Bridge Due to a mechanical failure, the south leaves of the Meadowbrook State Parkway Bridge across Sloop Channel at mile 12.8 are inoperable until further notice. The bridge can still open in accordance with its operating schedule but can only open the north leaves of the bridge, providing open vertical clearance of 37.5’ at the North side of the channel. Updates regarding the status of repairs

  • RARITAN RIVER CUTOFF CHANNEL - RARITAN RIVER General / Bridges / Construction Construction and demolition operations to replace the Raritan River Railroad Bridge commenced on April 1, 2026, and will continue through January 18, 2030. A channel closure is tentatively scheduled for the week of November 30, 2026. The actual closure date will be weather dependent and communicated with local mariners as the operation gets closer. Operations through December 2026 include counterweight Installation at

  • WEST PASSAGE - POINT JUDITH HARBOR OF REFUGE General / Hazards To Navigation / Obstructions Blue Acres Aquaculture will conduct seaweed aquaculture operations in the Harbor of Refuge, Point Judith, Narragansett, Rhode Island, from November 1, 2026, through May 1, 2027. The aquaculture site is bounded by the following approximate positions: 41°21'33.95" N, 071°30'29.95" W; 41°21'24.95" N, 071°30'34.67" W; 41°21'32.23" N, 071°30'25.88" W; and 41°21'23.14" N, 071°30'30.46" W. Mariners are advised o

  • RARITAN RIVER CUTOFF CHANNEL - ARTHUR KILL General / Marine Construction (Excluding Bridges) / Dredging Bird Construction will conduct dredging operations in Smith Creek Inlet from November 14, 2026, through January 15, 2027, between 7 a.m. and 5 p.m., daily. Multiple deck scow barges, a dredge barge, towing tug, a 60-foot by 125-foot crane barge, and a 37-foot by 150-foot hopper barge will be operating in and near the navigable channel in the vicinity of 40°32'43.7" N, 074°15'12.7" W. No vessel

  • HOG ISLAND CHANNEL - CAPE COD CANAL EASTERN ENTRANCE General / Threatened And Endangered Species Advisory (TESS Advisory) / Marine Wildlife Migration NOAA FISHERIES ANNOUNCES THAT A VOLUNTARY VESSEL SPEED RESTRICTION ZONE UNDER THE RIGHT WHALE SLOW ZONE PROGRAM IS CURRENTLY IN EFFECT IN CAPE COD BAY, MASSACHUSETTS TO PROTECT RIGHT WHALES. THIS RIGHT WHALE SLOW ZONE IS IN EFFECT THROUGH NOVEMBER 17, 2026. NOAA REQUESTS MARINERS TO ROUTE AROUND THIS ZONE OR TRANSIT THROUGH IT AT TEN KNOTS OR LESS.

  • BOSTON NORTH CHANNEL - PRESIDENT ROADS General / Bridges / Repairs, Painting, Or Fender Replacement Location: 42-22.80N 071-03.11W Bridge Name: Chelsea St Bridge MA - BOSTON INNER HARBOR – LITTLE MYSTIC – CHELSEA STREET BRIDGE- Bridge Painting and Repairs Mariners are advised that SPS New England will be conducting Bridge painting and maintenance to the Chelsea Street Bridge mile 0.2 across thew Little Mystic channel. Work will commence on Monday September 14, 2026, and continue through Saturday

Same country

Beta look