HomeMapSky mapAlpha
More
Account
Loading…
Language: English

LNM01-952FD4

SÉCURITÉ
Received 04 Nov 2026, 00:00 UTC

Warning text

Positions open on the map
RARITAN RIVER CUTOFF CHANNEL - ARTHUR KILL General / Marine Construction (Excluding Bridges) / Dredging Bird Construction will conduct dredging operations in Smith Creek Inlet from November 14, 2026, through January 15, 2027, between 7 a.m. and 5 p.m., daily. Multiple deck scow barges, a dredge barge, towing tug, a 60-foot by 125-foot crane barge, and a 37-foot by 150-foot hopper barge will be operating in and near the navigable channel in the vicinity of 40°32'43.7" N, 074°15'12.7" W. No vessel passage will be permitted north of 40°33'16.8" N, 074°15'20.9" W. Mariners requiring passage through Smith Creek Inlet should contact the project vessels on VHF-FM Channel 13 at least 20 to 30 minutes in advance. Mariners are urged to use caution and transit at their slowest safe speed to minimize wake. Valid 2026-11-14 to 2027-01-16. USCG Northeast District Local Notice to Mariners 44/2026

Keywordsdredging operationsmarine construction

Beta look