HomeMapSky mapAlpha
More
Account
Loading…
Language: English

LNM01-5DC8CE

Received: 4 Nov 2026, 00:00Updated: 4 Nov 2026, 18:11
Subscribe
Show on map
Search

Keywords

  • Geometry refscircle_radius
  • Geometry phraseswithin
Message content
SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) - SECTOR SOUTHEASTERN NEW ENGLAND, TERRITORIAL SEA General / LAA / RNA / Safety Zone A 500-meter Safety Zone may be enforced around Ørsted Northeast Program operations from 8:00am, November 04, 2026, to 8:00am, November 11, 2026, Mariners are to avoid transiting within 500-meters of the following positions: Revolution Wind Lease Area 486 Offshore Substations (OSS): AF08: 41-12.60N 071-07.70W, AL11: 41-07.69N 071-03.54W. Sunrise Wind Lease Area 487 Offshore Converter Station (OCS): AU08: 40-59.60N 071-07.28W. Sunrise Wind Lease Area 487 Wind Turbine Generator (WTG) AV06: 40-58.55N 071-09.88W, AW05: 40-57.52N 071-11.17W, AW06: 40-57.54N 071-09.86W, AW07: 40-57.57N 071-08.53W, AW08: 40-57.56N 071-07.21W Northeast Program SCYLLA and supporting vessels are installing wind turbine generators (WTGs). Components are stored in New London, CT. Barge 455-8 and tugs SAM and OCEAN SUN transport one complete WTG per roundtrip. LEVIATHAN is stationed at AU08 for offshore converter station commissioning. BOKA OCEAN is installing these cables. NDEAVOR is trenching behind BOKA OCEAN. There may be areas of exposed cable. Please contact Safety Vessels on scene before conducting bottom-contacting activities. ARCADIA is installing scour protections at SRW foundation locations. ARIES RAM XII is conducting maintenance at Block Island Wind Farm. Valid 2026-11-04 to 2026-11-12. USCG Northeast District Local Notice to Mariners 44/2026
Beta look