SAN FRANCISCO OAKLAND BAY BRIDGE WEST CROSSING - SAN FRANCISCO BAY NORTH CHANNEL
General / Marine Construction (Excluding Bridges) / Dredging
Dredging operations will be conducted at the Chevron Long Wharf, Richmond, beginning on or about July 1, 2026, and ending before November 30, 2026. The clamshell dredge “DB 24” will carry out dredging operations, and a fleet of three split hull scows with capacities of 2,000 CY and 3,000 CY will be utilized for all disposal operations to SF-10, SF-11, or MWRP. The tow tug “Sarah Reed” will serve as the tow tug during disposal operations, with support from the tender tug “Phyllis T.” All equipment will monitor VHF channels 13, 14, and 80A. Operations will be conducted 24 hours a day, 7 days a week, between the Richmond Long Wharf Dredge Sites located at approximately 37-55.31N 122-24.67W and disposal sites. For more information, contact Operations Manager Dennis Salyers at (415) 497-5289. Mariners are advised to use extreme caution while transiting the dredge area. All mariners are advised to transit the area with caution.
USCG Southwest District Local Notice to Mariners 45/2026