HomeMapSky mapAlpha
More
Account
Loading…
Language: English

LNM11-3C6330

SÉCURITÉ
Received 23 Sept 2026, 00:00 UTC

Warning text

Positions open on the map
APPROACHES TO SAN DIEGO BAY - SAN DIEGO BAY General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes The Port of San Diego will be coordinating in-water construction along the south shoreline of Sweetwater Channel in San Diego Bay from August 24, 2026, intermittently through November 25, 2026. Operations are dependent on tidal conditions. The project consists of the removal of existing rock revetment and the installation of interlocking ECOncrete tidepool shoreline units. In-water work will include the use of a floating barge with crane operations and small support vessels at approximately 32-39.00N 117-06.52W. Mariners are urged to transit at their slowest safe speed to minimize wake, and proceed with caution after passing arrangements have been made. For more details or comments, contact Zeke Coleman at the Port of San Diego Engineering Department at 619-942-2966. All mariners are advised to transit the area with caution. USCG Southwest District Local Notice to Mariners 45/2026

Keywordsmarine construction

Beta look