SAN FRANCISCO OAKLAND BAY BRIDGE WEST CROSSING - SAN FRANCISCO BAY NORTH CHANNEL
General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes
Silverado Contractors, Inc. will be conducting wharf demolition operations at Pier 90 in San Francisco from August 12 to September 30, 2026. Operations will occur at approximately 37-44.83N 122-23.02W. The Crane Barge 2 (Call Sign: CB2), Zaccor I (Call Sign: Zaccor 1), and Zaccor VII (Call Sign: Zaccor 7) will be involved in the operations. On-scene vessels will monitor VHF-FM Channels 13 and 14 when near deep-draft traffic, and Channel 16 otherwise. Mariners are requested to use caution when transiting near the demolition site. For more details or comments, contact Matt Bramlett at (925) 818-2324 or [email protected]. All mariners are advised to transit the area with caution.
USCG Southwest District Local Notice to Mariners 39/2026