SECTOR CORPUS CHRISTI, SUBMERGED LAND ACT (SLA) - BRAZOS SANTIAGO PASS
General / Marine Construction (Excluding Bridges) / Dredging
Brazos Santiago Entrance Channel - Barracuda Bay – Staging Area --- --- A staging area for assembled dredge subline and dredging equipment will be located south of the Brazos Santiago Entrance Channel in approximate position 26-03.76N 097-09.50W. Project vessels will move assembled subline from the staging area to the offshore subline area. Additional dredge equipment may be in the area throughout the Brazos Santiago Entrance Channel dredge project. On-scene vessels will include the M/V CJ, JACK K, and CAPT BOUDREAUX, and the Crew Boats COLONEL and NANCY M. Mariners are requested to transit the area at their slowest safe speed to minimize wake and should provide a wide berth to vessels towing subline. VHF-FM Channels: 13, 16, 66 and 67
Valid 2026-10-19 to 2026-11-30.
Position 26-03.77N 097-09.50W
USCG Heartland (Gulf) District Local Notice to Mariners 43/2026