LNM08G-2275A2
SÉCURITÉReceived 20 Oct 2026, 00:00 UTC
Warning text
SECTOR CORPUS CHRISTI, SUBMERGED LAND ACT (SLA) - BRAZOS SANTIAGO PASS
General / Marine Construction (Excluding Bridges) / Dredging
Brazos Santiago Entrance Channel – Dredge Operation --- --- The Dredge GLENN Edwards will be working in the Brazos Santiago Entrance Channel, pumping spoils to the discharge site along the beach at Andy Bowie Park on South Padre Island. Operations will be conducted 24-hours a day, 7-days a week. Waterside staging areas for vessels, equipment, and pipeline, will be located in the Port Isabel turning basin and Barracuda Cove. On-scene vessels will include the M/V MAMCY M, Crew Boat COLONEL, and T/Vs CAPT CJ, JACK K, and CAPT BOUDREAUX. Mariners are urged to transit near the dredge at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. VHF-FM Channels: 13, 16, 66 and 67
Valid 2026-10-20 to 2026-11-30.
USCG Heartland (Gulf) District Local Notice to Mariners 43/2026
Keywordsmarine construction