SECTOR CORPUS CHRISTI, TERRITORIAL SEA - SECTOR CORPUS CHRISTI, SUBMERGED LAND ACT (SLA)
General / Marine Construction (Excluding Bridges) / Dredging
Gulf of America - Subline Operations --- --- Subline will be placed perpendicular to the beach on South Padre Island for the Brazos Santiago Pass dredge project. Subline will be installed between October 19, 2026 and October 25, 2026, but will remain in the are through the end of the dredge project. The subline will extend from shore to approximately 1 nm offshore, between approximate positions 26-08.04N 097-10.06W and 26-08.20N 097-08.98W. Assembled sections of subline will be towed from staging areas inshore to the subline area in the Gulf. On-scene vessels will include the M/V CJ, JACK K, and CAPT BOUDREAUX and the Crew Boats COLONEL and NANCY M. Mariners are urged to avoid the subline area and are requested to provide a wide berth to vessels towing subline. VHF-FM Channels: 13, 16, 66 and 67
Valid 2026-10-19 to 2026-11-30.
USCG Heartland (Gulf) District Local Notice to Mariners 43/2026