HomeMapWorld mapAlphaLearnNew
More
Account
Loading…
Language: English

US Coast Guard LNM - East District (D5) LNM05-58B50F

SÉCURITÉ
Received: Source checked:
Subscribe
Show on map
Search

Keywords

  • Operationsmarine construction
Message content
CHESAPEAKE CHANNEL - SANDY POINT TO SUSQUEHANNA RIVER (CHART 12273) General / Marine Construction (Excluding Bridges) / Dredging Location: 39-04.26N 076-23.48W 39-03.93N 076-23.41W 39-01.02N 076-22.26W 39-00.94N 076-22.59W 39-04.21N 076-23.83W 39-04.26N 076-23.48W Curtin Maritime (CMC) will be conducting dredging activities at Craighill Entrance Channel commencing on or about December 1, 2026, and conclude on or about March 1, 2027. During this time, CMC will be operating 24 hours per day / 7 days per week (Monday through Sunday). Maintenance dredging within the existing channels and turning basins will occur, and material will be loaded into scows and disposed by an off-loader barge at two sites (Cox Creek Placement Site and Poplar Island). The operation will consist of a 255-ft mechanical dredge (DB Avalon), two 200-255-ft barges, four Split Hull Scows, five Tugs (Alice C, Kimberly C, John Joseph, Patricia Jean and David Winslow). All manned equipment will be monitoring VHF-FM Channels 13 and 16. Project Manager, Mr. Robert Collaro can be reached at (772) 643-0784. Mariners are urged to proceed with caution after passing arrangements have been made. MSI #58548. Valid 2026-12-01 to 2027-03-05. USCG East District Local Notice to Mariners 47/2026
Beta look