HomeMapWorld mapAlphaLearnNew
More
Account
Loading…
Language: English

US Coast Guard LNM - East District (D5) LNM05-D2F76C

SÉCURITÉ
Received: Source checked:
Subscribe
Show on map
Search

Keywords

  • Weather Warningsevere weather
Message content
SECTOR VIRGINIA, EXCLUSIVE ECONOMIC ZONE (EEZ) - SECTOR VIRGINIA, TERRITORIAL SEA General / LAA / RNA / Safety Zone MSIB 103-26 November 24, 2026 SUMMARY: The COTP Sector Virginia will elevate Port Conditions to a MODIFIED ZULU at 2:00 p.m. on Wednesday, November 25, 2026, in response to forecasted severe weather affecting Norfolk Harbor Entrance, Virginia portions of the Chesapeake Bay, and Virginia ocean inlets, in accordance with 33 CFR. § 165.520. During severe weather, vessel movement, port operations, and emergency-response capabilities, including Search and Rescue, may be impacted. AREAS OF CONCERN: Chesapeake Bay from the MD/VA state line through the Virginia Capes and including Thimble Shoal Channel, and all ocean inlets. ACTIONS: Port Condition X-RAY is currently in effect for Sector Virginia. Per regulation, all vessels and facilities must prepare for potential storm impacts. Port condition YANKEE will not be established for this weather event. Sector Virginia COTP will establish a MODIFIED ZULU port condition. MODIFIED ACTIONS: Beginning at 2:00 p.m. on Wednesday, November 25, 2026, Inbound vessels requiring state pilotage must have the state pilot aboard by 2:00 p.m. Outbound vessels requiring state pilotage must disembark the state pilot before 2:00 p.m. During modified Port Condition ZULU, vessels that do not require a state pilot may not transit through the Virginia Capes. Vessel movements west of the Hampton Roads Bridge-Tunnel will be limited to vessels of 500 gross tons or less to support tug movements and assistance. Cargo operations west of the Hampton Roads Bridge-Tunnel may continue as normal. All vessels should follow the recommended precautionary measures for storm preparation. Moored Vessels Moored vessels should have additional mooring lines available to reinforce existing lines as needed. Vessels should also have an outboard anchor ready for use and spare mooring lines or wires readily available. Anchored Vessels Anchored vessels should have a second anchor ready for deployment, remain prepared to get underway within 15 minutes, and use available drag-circle alarm features on installed navigation equipment. Any deviation from the requirements of modified Port Condition ZULU must be approved by the COTP. Marine Broadcasts will announce subsequent Port Condition updates. Resumption of normal Marine Transportation System operations is predicated on actual storm conditions, and any post-storm assessments, during Port Condition RECOVERY. Anticipate channel assessments to be conducted at 3:00p.m. on Thursday November 26, 2026 to determine port reconstitution. COMMUNICATIONS: Direct all inquiries and any emergencies to the 24 / 7 Sector Virginia Command Center via VHF CH 16 or (877) 722-5727. USCG East District Local Notice to Mariners 47/2026
Beta look