UPPER CHESAPEAKE CHANNEL - GUNPOWDER RIVER General / Marine Construction (Excluding Bridges) / Dredging Location: 39-24.62N 076-21.48W 39-24.39N 076-21.12W 39-24.20N 076-21.17W 39-23.75N 076-21.01W 39-23.66N 076-20.85W 39-23.44N 076-20.84W 39-22.99N 076-20.43W Cianelli Construction will be performing maintenance dredging of Gunpowder River and Taylor Creek in Joppatowne, MD inside the Gunpowder River Train Bridge towards Mariner Point Park. Dredging begins 12/13/2026 with an estimated completion date of 2/14/2027. Working hours will be at 0600-2100, 7 days a week. The project will utilize a 58-ft DSC conventional dredge with a 30' pushboat tender, a 22-ft and 18-ft aluminum skiffs along with 12" HDPE pipe. Dredge and pipeline to be lighted and marked with lights and floats per US Coast Guard regulations. Tender and skiffs marked per Coast Guard and State regulations. Dredge to be spudded and anchored in place of dredging operations. Pipeline to be anchored periodically along the dredging channel locations. Pipeline will be floating and submerged during dredging operations. Names of vessels on scene: Dredge - Pipe Down, Tender - Carmen Ann, 22' Skiff - Layla Grace, 18' Skiff - Gianna Rose. All vessels associated with the project will monitor VHF channel 16, and cell phone 443-686-1190. Signage will be posted at Mariner Point Park Boat Ramp. Project Supervisor: Lou Cianelli (443) 686-1190. All vessels are requested to transit the area with caution. MSI #59038. Valid 2026-12-13 to 2027-02-19. USCG East District Local Notice to Mariners 47/2026
Beta look