HomeMapWorld mapAlphaLearnNew
More
Account
Loading…
Language: English

US Coast Guard LNM - East District (D5) LNM05-430C23

SÉCURITÉ
Received: Source checked:
Subscribe
Show on map
Search

Keywords

  • Operationsmarine construction
Message content
SANDY POINT TO SUSQUEHANNA RIVER (CHART 12273) - PATAPSCO RIVER General / Marine Construction (Excluding Bridges) / Dredging Location: 39-12.57N 076-31.02W 39-12.02N 076-30.08W 39-11.84N 076-30.18W 39-12.00N 076-30.82W 39-12.43N 076-31.27W 39-12.57N 076-31.02W Curtin Maritime (CMC) will be conducting dredging activities at Brewerton Angle commencing on or about December 1, 2026, and conclude on or about March 1, 2027. During this time, CMC will be operating 24 hours per day / 7 days per week (Monday through Sunday). Maintenance dredging within the existing channels and turning basins will occur, and material will be loaded into scows and disposed by an off-loader barge at two sites (Cox Creek Placement Site and Poplar Island). The operation will consist of a 255-ft mechanical dredge (DB Avalon), two 200-255-ft barges, four Split Hull Scows, five Tugs (Alice C, Kimberly C, John Joseph, Patricia Jean and David Winslow). All manned equipment will be monitoring VHF-FM Channels 13 and 16. Project Manager, Mr. Robert Collaro can be reached at (772) 643-0784. Mariners are urged to proceed with caution after passing arrangements have been made. MSI #58528. Valid 2026-12-01 to 2027-03-05. USCG East District Local Notice to Mariners 47/2026
Beta look