ELK RIVER CHANNEL - SUMMIT BRIDGE TO BULL MINNOW POINT
General / Marine Construction (Excluding Bridges) / Dredging
Location: Chesapeake and Delaware Canal Channel to Poole's Island Curtin Maritime (CMC) will be conducting maintenance dredging activities from 26 October to 17 December. The operation will consist of a 255-ft mechanical dredge, several 200 ft barges and multiple tugs. They will be operating 24 hours per day, 7 days per week. Maintenance Dredging operations will take place within the Chesapeake and Delaware Canal Channel from Reedy Point to Poole’s Island areas. Dredged material will be loaded into scows and disposed upland by an off-loader barge at the Pearce Creek Disposal Area and the Reedy Island Disposal Area. Support tugs will be monitoring VHF-FM Channels 13 and 16. Mariners are urged to proceed with caution after passing arrangements have been made. Project Managers are Robert Collaro (772) 643-0784 and Taylor Fortier (401) 692-2235. MSI #56684.
Valid 2026-10-26 to 2026-12-24.
USCG East District Local Notice to Mariners 43/2026