LNM05-83F69E
SÉCURITÉReceived 26 Oct 2026, 00:00 UTC
Warning text
Positions open on the mapSUSQUEHANNA RIVER - NORTHEAST RIVER
General / Marine Construction (Excluding Bridges) / Dredging
Location: 39-35.76N 075-56.70W 39-35.75N 075-56.65W 39-33.13N 075-58.49W 39-33.13N 075-58.49W Dredging operations are being conducted as part of the FY26 Northeast River Maintenance Dredging project. M/V Lady Diana is scheduled to arrive on Monday, October 19, 2026, and operations are anticipated to begin October 26 and continue through February 14, 2027. Utilizing a 40 x 40 foot barge, dredging will be conducted within the Northeast River federal navigation channel in three separate dredge areas from Northeast River Lighted Buoy 7 to North East Creek. Dredged material will be placed in the Stony Run Dredged Material Placement (DMP) Site, an upland site off MD Route 7 in Cecil County. Floating/submerged pipeline routed from the dredge along the channel to the shoreline and overland to the Stony Run DMP; pipeline will be submerged where crossing the navigation channel. All pipeline and floating plant will be marked with yellow flashing lights and buoys. The dredge will monitor and operate on VHF-FM Channel 22 (working channel) and Channels 13 and 16 at all times. AIS transponders will be active on all floating plant throughout operations. The dredge will swing to the side of the channel as necessary to allow safe passage of commercial and recreational vessels. Mariners are to proceed with caution, reduce wake and speed in dredging areas. MSI #55899.
Valid 2026-10-26 to 2027-02-17.
USCG East District Local Notice to Mariners 43/2026
Location map
Open in the full mapLoading map…