Warning text

Positions open on the map
GOLDEN GATE BRIDGE - SAN FRANCISCO BAY General / Marine Construction (Excluding Bridges) / Dredging Curtin Maritime (CMC) will conduct maintenance dredging within the existing West Harbor Marina from on or about October 13, 2026, through on or about October 22, 2026. Operations will be conducted seven days a week from 0700 to 1900. Dredging will begin in the entrance channel adjacent to the jetty, progress south, and then proceed inbound to I Dock. Mechanical dredging will be performed by DB Ironbound (150 feet x 54 feet x 9 feet), with material loaded into scows Arrow Point and Long Point, each with a 1,450-cubic-yard capacity, and transported to SF-8 at approximately 37-45.47N 122-34.38W. Support tugs Emma C, Seanna C, Navy Bean, and Gretchen C will be involved. A mooring will be established at approximately 37-48.61N 122-26.49W, approximately 1,500 feet northwest of the West Harbor Marina entrance channel, where equipment will be manned and staged outside work hours. Equipment will remain lit during hours of darkness. Mariners are advised that aids to navigation at the West Harbor Marina Entrance Channel will be temporarily removed while work is ongoing. All manned equipment will monitor VHF-FM channels 13, 14, and 16. For more information, contact Project Manager Alexandro Rodriguez at (562) 241-2350. Mariners are urged to proceed with caution after passing arrangements have been made. All mariners are advised to transit the area with caution. USCG Southwest District Local Notice to Mariners 40/2026

Keywordsmarine construction

Beta look