SACRAMENTO RIVER DEEP WATER SHIP CHANNEL - SACRAMENTO RIVER
General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes
CAL-NEVA Construction Services will conduct marine operations to install the Bio-Acoustic Fish Fence (BAFF) at position 38-14.37N 121-31.10W from October 5, 2026, through October 9, 2026. Operations will be conducted using the derrick barge “DB Steadfast” along with an accompanying flat barge. The barges will be either spudded down or anchored using a four-point mooring system marked with 5-foot crown buoys, which will be lighted at night with flashing white strobes. Mariners are requested to transit the area with caution. All vessels and equipment on-scene will monitor VHF-FM channels 8, 13, and 14. For more details or comments, contact Mohammed (Shahid) Anwar at 916-288-2129.
USCG Southwest District Local Notice to Mariners 40/2026