LOWER MISSISSIPPI RIVER - ILLINOIS RIVER
General / Bridges / Construction
Pekin Railroad Drawbridge: Continuing until November 4, 2026, ICC Group Inc., is conducting construction operations from 7:00 a.m. until 5:00 p.m., daily. Mariners are requested to contact Tim Weitzel at (815) 712-7107, 30-minutes prior to transiting the bridge. Mariners are urged to transit the area with caution.
Position 40-33.27N 089-40.53W
USCG Heartland (MRS) District Local Notice to Mariners 44/2026