HomeMapSky mapAlpha
More
Account
Loading…
Language: English

LNM08G-A27262

SÉCURITÉ
Received: 4 Nov 2026, 00:00Updated: 4 Nov 2026, 18:21
Subscribe
Show on map
Search

Keywords

  • Operationsmarine construction
Message content
SECTOR CORPUS CHRISTI, SUBMERGED LAND ACT (SLA) - BRAZOS SANTIAGO PASS General / Marine Construction (Excluding Bridges) / Dredging Brazos Santiago Entrance Channel – Dredge Operation --- --- The Dredge GLENN EDWARDS will be working in the Brazos Santiago Entrance Channel, pumping spoils to the discharge site along the beach at Andy Bowie Park on South Padre Island. Operations will be conducted 24-hours a day, 7-days a week. Waterside staging areas for vessels, equipment, and pipeline, will be located in the Port Isabel turning basin and Barracuda Cove. On-scene vessels will include the M/V MAMCY M, Crew Boat COLONEL, and T/Vs CAPT CJ, JACK K, and CAPT BOUDREAUX. Mariners are urged to transit near the dredge at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. VHF-FM Channels: 13, 16, 66 and 67 Valid 2026-11-13 to 2026-11-30. USCG Heartland (Gulf) District Local Notice to Mariners 44/2026
Beta look