LNM07-EA6B14
SÉCURITÉReceived 23 Sept 2026, 00:00 UTC
Warning text
CHARLESTON HARBOR - CHARLESTON HARBOR SOUTH CHANNEL
General / Marine Construction (Excluding Bridges) / Dredging
General/Marine Construction (Excluding Bridges)/Dredging Dredging operations are scheduled to commence in the Lower Charleston Harbor on or around August 27, 2026, and will continue through September 12, 2027. The Derrick Barge (DB) Paula Lee and Crane Barge (CB) Harry S along with 4 bottom dumps scows will perform dig and dump dredging in 14 Reaches: 1. Shoal 1 – Hog Island Reach 2. Shoal 2 – Lower Town Creek Reach 3. Shoal 2A – Customs House Reach 4. Shoal 4 – Town Creek Reach 5. Shoal 4A – Town Creek Turning Basin 6. Shoal 5 – Meyers Bend 7. Shoal 5A – Meyers Bend West 8. Shoal 6 – Drum Island Reach 9. Shoal 7 – Lower Wando Rech 10. Shoal 8 – Wando Turning Basin 11. Shoal 9 – Upper Wando Turning Basin 12. Shoal 11 – Daniel Island Reach 13. Shoal 12 – HLT Turning Basin 14. Shipyard River Dredging will begin in Shoals 8 and 9, Upper Wando and Wando Turning Basins with the DB Paula Lee. The CB Harry S is anticipated to arrive December 1, 2026. For any questions or concerns regarding the dredging operations, please contact the project manager at (415) 717-7214, or the USCG Sector Charleston Command Center at (833) 453-1261.
USCG Southeast District Local Notice to Mariners 45/2026