HomeMapSky mapAlpha
More
Account
Loading…
Language: English

LNM07-4ECC83

SÉCURITÉ
Received: 23 Sept 2026, 00:00Updated: 11 Nov 2026, 18:59
Subscribe
Show on map
Search

Keywords

  • Operationssurvey operations, dredging operations, marine construction
Message content
SECTOR MIAMI, SUBMERGED LAND ACT (SLA) - PORT EVERGLADES General / Marine Construction (Excluding Bridges) / Dredging General/Marine Construction (Excluding Bridges)/Dredging 27918 Great Lakes Dredge and Dock Company, LLC will begin mobilizing for a dredge project on or about September 22, 2025. Vessels and equipment being used are DREDGE 54 (Mechanical Clamshell Dredge), DREDGE NEW YORK (Backhoe Bucket Dredge),Tug BERING DAWN, Tug AMY E. HEBERT, Tug LARRY J. HEBERT and Tug LIZ ALMA, SURVEY BOAT PEARL RIVER, CREW BOAT COOPER RIVER, Scows GL501, GL502, GL701, GL702. Vessels will be monitoring VHF-FM channels 07 and 12/16 The purpose of the Port Everglades Sand Bypass project is to create infrastructure on the north side of the Port Everglades Inlet in Broward County, Florida. Work to be completed under this contract consists of dredging a sand trap and a portion of the rubble spoil shoal and disposal of the dredge material in the Port Everglades Harbor Ocean Dredged Material Disposal Site (ODMDS). Dredging operations are anticipated to commence on October 22, 2025, and will take place 24 hours a day, 7 days a week. With an estimated completion date of July 18, 2027. The DREDGE 54, along with DREDGE NEW YORK which will start on or about December 18, 2025, are planned to collectively dredge more than 400,000 CY of material from the north side of the Port Everglades entrance channel, immediately seaward of the north jetty and beach north of the inlet. The dredges would appreciate slow bell passing. While approaching the jetty dredging work area location. The material will be placed into scows and towed to the Port Everglades Harbor ODMDS, which is located approximately 3.1 nautical miles northeast of the entrance to Port Everglades Channel, outside of State Waters. There is a project tow route between Red Buoy 2 and the ODMDS CenterPoint. Fishermen and trawlers should be aware of limited mobility for tug and scow transits. Small-Vessel Captains should take caution to avoid passing between the scow and towing tug while under transit. While not always visible at a distance, there is a large steel-tow cable that passes between the bow of the scow and the stern of the towing tug. The survey vessel, Pearl River, will conduct survey operations of the ODMDS disposal area and work area corridors (during daylight hours/7 days per week). A crew transfer vessel, the Cooper River, will transfer crew between the shoreside boarding location at Bahia Mar Yachting Center and the dredging equipment. Disposal Location: 26-07.89N 080-02.00W 26-07.89N 080-01.83W 26-07.27N 080-01.83W 26-07.27N 080-02.00W Dredging Location: 26-05.66N 080-06.36W 26-05.67N 080-06.34W 26-05.69N 080-06.32W 26-05.69N 080-06.30W 26-05.69N 080-06.28W 26-05.69N 080-06.27W 26-05.70N 080-06.27W 26-05.72N 080-06.25W 26-05.73N 080-06.24W 26-05.82N 080-06.23W 26-05.82N 080-06.24W 26-05.86N 080-06.24W 26-05.86N 080-06.08W 26-05.77N 080-06.08W 26-05.77N 080-06.12W 26-05.75N 080-06.13W 26-05.72N 080-06.14W 26-05.70N 080-06.15W 26-05.70N 080-06.17W 26-05.66N 080-06.17W 26-05.66N 080-06.32W USCG Southeast District Local Notice to Mariners 45/2026
Beta look