SANDY POINT TO SUSQUEHANNA RIVER (CHART 12273) - PATAPSCO RIVER
General / Marine Construction (Excluding Bridges) / Dredging
Location: 39-10.37N 076-25.54W 39-08.71N 076-24.36W 39-08.58N 076-24.67W 39-10.20N 076-25.93W 39-10.37N 076-25.54W Curtin Maritime (CMC) will be conducting dredging activities at Craighill Upper Range commencing on or about December 1, 2026, and conclude on or about March 1, 2027. During this time, CMC will be operating 24 hours per day / 7 days per week (Monday through Sunday). Maintenance dredging within the existing channels and turning basins will occur, and material will be loaded into scows and disposed by an off-loader barge at two sites (Cox Creek Placement Site and Poplar Island). The operation will consist of a 255-ft mechanical dredge (DB Avalon), two 200-255-ft barges, four Split Hull Scows, five Tugs (Alice C, Kimberly C, John Joseph, Patricia Jean and David Winslow). All manned equipment will be monitoring VHF-FM Channels 13 and 16. Project Manager, Mr. Robert Collaro can be reached at (772) 643-0784. Mariners are urged to proceed with caution after passing arrangements have been made. MSI #58538.
Valid 2026-12-01 to 2027-03-05.
USCG East District Local Notice to Mariners 47/2026