HomeMapWorld mapAlphaLearnNew
More
Account
Loading…
Language: English

US Coast Guard LNM - East District (D5) LNM05-D5A27A

SÉCURITÉ
Received: Source checked:
Subscribe
Show on map
Search

Keywords

  • Operationsmarine construction
Message content
UPPER CHESAPEAKE CHANNEL - BREWERTON CHANNEL EASTERN EXTENSION General / Marine Construction (Excluding Bridges) / Dredging Location: 39-08.62N 076-24.24W 39-07.83N 076-23.71W 39-07.73N 076-24.18W 39-08.48N 076-24.56W 39-08.62N 076-24.24W Curtin Maritime (CMC) will be conducting dredging activities at Craighill Angle commencing on or about December 1, 2026, and conclude on or about March 1, 2027. During this time, CMC will be operating 24 hours per day / 7 days per week (Monday through Sunday). Maintenance dredging within the existing channels and turning basins will occur, and material will be loaded into scows and disposed by an off-loader barge at two sites (Cox Creek Placement Site and Poplar Island). The operation will consist of a 255-ft mechanical dredge (DB Avalon), two 200-255-ft barges, four Split Hull Scows, five Tugs (Alice C, Kimberly C, John Joseph, Patricia Jean and David Winslow). All manned equipment will be monitoring VHF-FM Channels 13 and 16. Project Manager, Mr. Robert Collaro can be reached at (772) 643-0784. Mariners are urged to proceed with caution after passing arrangements have been made. MSI#58539. Valid 2026-12-01 to 2027-03-05. USCG East District Local Notice to Mariners 47/2026
Beta look