JAMES RIVER - ELIZABETH RIVER
General / Marine Construction (Excluding Bridges) / Dredging
Location: Lambert's Point Pier 6 - Elizabeth River Mechanical dredging operations on behalf of Norfolk Southern will commence on or about October 21, 2026, at Lamberts Point Pier 6 in Norfolk on the Elizabeth River. Loaded scows will be towed from the work area at Pier 6 to the Unloader barge located at Shirley’s Plantation (Weanack Island). The Dredge KOKO V will perform the dredging with the assistance of towing tugs and scows. Vessels and crew will monitor VHF channel 13 during the project execution. Dredging and unloading operations will continue until the estimated completion date of December 31, 2026. MSI #53466.
Valid 2026-10-09 to 2027-01-04.
USCG East District Local Notice to Mariners 45/2026