HomeMapSky mapAlpha
More
Account
Loading…
Language: English

LNM01-62105E

Archived
Received: 23 Sept 2026, 00:00Archived: 7 Oct 2026, 16:09Updated: 4 Nov 2026, 18:11
Subscribe
Show on map
Search

Keywords

  • Geometry refscircle_radius
  • Geometry phraseswithin
Message content
SECTOR SOUTHEASTERN NEW ENGLAND, EXCLUSIVE ECONOMIC ZONE (EEZ) - SECTOR SOUTHEASTERN NEW ENGLAND, TERRITORIAL SEA General / LAA / RNA / COTP Restriction A 500-meter Safety Zone may be enforced around Ørsted Northeast Program operations from 8:00am, September 23, 2026, to 8:00am, September 30, 2026, Mariners are to avoid transiting within 500-meters of the following positions: Revolution Wind Lease Area 486 Offshore Substations (OSS): AF08: 41-12.60N 071-07.70W, AL11: 41-07.69N 071-03.54W. Sunrise Wind Lease Area 487 Offshore Converter Station (OCS): AU08: 40-59.60N 071-07.28W. Sunrise Wind Lease Area 487 Wind Turbine Generator (WTG) AU02: 40-59.45N 071-15.19W, AU04: 40-59.50N 071-12.55W, AU03: 40-59.47N 071-13.95W, AU05: 40-59.53N 071-11.24W, AW01: 40-57.43N 071-16.45W, AT18: 41-00.83N 070-54.10W Northeast Program SCYLLA and supporting vessels are installing wind turbine generators (WTGs). Components are stored in New London, CT. Barge 455-8 and tugs SAM and OCEAN SUN transport one complete WTG per roundtrip. LEVIATHAN is stationed at AU08 for offshore converter station commissioning. BOKA OCEAN is installing these cables. NDEAVOR is trenching behind BOKA OCEAN. There may be areas of exposed cable. Please contact Safety Vessels on scene before conducting bottom-contacting activities. Valid 2026-09-23 to 2026-10-01. USCG Northeast District Local Notice to Mariners 39/2026
Beta look