HomeMapSky mapAlpha
More
Account
Loading…
Language: English

209/26

Archived
Received: 18 Oct 2026, 00:00Archived: 20 Oct 2026, 20:08Updated: 6 Nov 2026, 00:04
Subscribe
Show on map
Search

analysis

No longer in force

Diving for desalination pipelines off Praia da Falésia, Albufeira, 19-20 Oct 2026

Diving operations for installation of pipelines at the new Algarve desalination plant will take place off Praia da Falésia, Albufeira on 19 and 20 October 2026 during daylight hours. Support vessels Elmar Dos and Omarsub Cuatro will be on site. Vessels must keep a safety distance, proceed at low speed to avoid wake, and maintain a listening watch on VHF Channel 16. Follow instructions from Polícia Marítima or the support vessels.

Keep at least 500 metres from support vessels and the diving zone; proceed at reduced speed to avoid wake; maintain a continuous listening watch on VHF Channel 16 and follow instructions of Polícia Marítima or support vessels.

Type
Offshore operations · severity moderate
Feed
Offshore works, rigs and towingAll warnings of this kind on the map (contributors), or as an API feed: /api/v2/feeds/offshore/
Location
Praia da Falésia - Albufeira (offshore)
Validity
From 19 Oct 2026, 00:00 UTC
Until 20 Oct 2026, 23:59 UTCnos dias 19 e 20 de outubro de 2026, durante o arco diurno
Activity periods
  • ? - ? (19 October 2026 during daylight hours (arco diurno))
  • ? - ? (20 October 2026 during daylight hours (arco diurno))
Hazards
diving operations, installation of pipelines, support vessels on station
Keep clear
0.27 NMManter resguardo de segurança não inferior a 500 metros da embarcação de apoio e da zona de mergulho.

Contacts

  • Canal 16 VHF · General listening and contact channel; follow instructions of Polícia Marítima or support vessel

Vessels involved

  • Elmar Dos · support vessel
    On AISSpainAt anchorseen 12 min ago
  • Omarsub Cuatro · support vessel

Coast stations for this area

  • RCCMRSC HuelvaSpain60 NM from the area
  • RCCMRSC CadizSpain96 NM from the area
  • RCCMRCC AlmeriaSpain259 NM from the area
  • DSCDSC Station HuelvaMRSC HuelvaSpainMMSI 002241023VHF 35range 35 NM53 NM from the area
  • DSCDSC Station ChipionaMRCC TarifaSpainMMSI 002241023MF 150range 150 NM89 NM from the area
  • DSCDSC Station CadizMRSC CadizSpainMMSI 002241023VHF 35range 35 NM101 NM from the area
  • DSCDSC Station TarifaMRCC TarifaSpainMMSI 002241023VHF 35, MF 150range 150 NM141 NM from the area
  • DSCDSC Station Malaga CCRMRCC TarifaSpainMMSI 002241023VHF 35, MFrange 35 NM175 NM from the area

Generated automatically from the warning text on 18 Oct 2026, 19:27 UTC. It can be wrong: the original warning below is the authoritative text.

Message content
Avisa-se toda a navegação que nos dias 19 e 20 de outubro de 2026 , durante o arco diurno, irão realizar-se operações de mergulho, para instalação das tubagens da nova Dessalinizadora do Algarve, situada em frente à Praia da Falésia - Albufeira. ÁREA DAS OPERAÇÕES: Junto aos navios de apoio, que poderão estar numa área compreendida na Praia da Falésia, desde a linha de praia até 1,5 milhas naúticas no mar. MEIOS ENVOLVIDOS: - Elmar Dos (Registo: TE-1-6-14) - Omarsub Cuatro (Registo: 5ª-SE-2-1-20) INSTRUÇÕES À NAVEGAÇÃO: A todas as embarcações que naveguem na proximidade desta área, devem: - Manter resguardo de segurança não inferior a 500 metros da embarcação de apoio e da zona de mergulho. - Navegar com velocidade reduzida , por forma a não criar ondulação que coloque em risco a segurança dos mergulhadores. - Manter escuta permanente no Canal 16 VHF e sigam estritamente as instruções da Policia Maritima ou da embarcação de apoio. POSITION: 37-03.11N 008-11.15W POSITION: 37-05.72N 008-11.15W POSITION: 37-05.72N 008-07.26W POSITION: 37-03.11N 008-07.26W
Beta look