HomeMapSky mapAlpha
More
Account
Loading…
Language: English

Hong Kong full text

Hong Kong · 127 in force · 140 archived · updated 14 Nov 2026, 12:50 UTC

Warnings one by one
Export
ECDIS user charts
SubscribeSearch
MARINE DEPARTMENT NOTICE NO. 219/2026 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment, Repeal and Changes of Anchorages, Traffic Separation Schemes (TSSs) and Other Port Facilities Owners, operators, masters, coxswains and persons-in-charge of vessels are advised that the following changes to anchorages, traffic separation schemes and other port facilities in Hong Kong waters will come into effect on 27 November 2026. 2. Seven new anchorages will be established, namely: (a) East Lamma Anchorage; (b) Ha Mei Wan Anchorage; (c) Hei Ling Chau Dangerous Goods Anchorage; (d) Kellett Dangerous Goods Anchorage No. 1; (e) Kellett Dangerous Goods Anchorage No. 2; (f) South-east Lamma Dangerous Goods Anchorage; and (g) South Lamma Anchorage. 3. The boundaries of the Kellett Anchorages No. 1 to 3, South-west Lamma Anchorage, South Cheung Chau Anchorage, Western Quarantine & Immigration Anchorage and Western Dangerous Goods Anchorage will be adjusted. The existing South-east Lamma Anchorage, South Lamma Dangerous Goods Anchorage and Tsuen Wan Dangerous Goods Anchorage will be repealed. 4. The Mirs Bay Dangerous Goods Anchorage and Rocky Harbour Dangerous Goods Anchorage will be converted into multi-purpose anchorages and renamed as the Mirs Bay Anchorage and Rocky Harbour Anchorage respectively. The Urmston Road Anchorage will also be converted into a multi- purpose anchorage. 5. The existing Yau Ma Tei Anchorage will be rearranged to form the Yau Ma Tei Anchorage No. 1, Yau Ma Tei Anchorage No. 2 and a private mooring area south-east of Stonecutters Island. Except with the permission of the Director of Marine, vessels exceeding 100 metres in length overall must not anchor in the Yau Ma Tei Anchorage No. 1, and vessels exceeding 50 metres in length overall must not anchor in the Yau Ma Tei Anchorage No. 2. The Cheung Sha Wan Designated Bunkering Area will be repealed and the South-east Stonecutters Island Designated Bunkering Area will be established. 6. The existing Recommended Adamasta Traffic Separation Scheme and Recommended Fan Lau Traffic Separation Scheme will become local statutory traffic separation schemes (TSSs). 7. Masters, coxswains and persons-in-charge of vessels are reminded to strictly comply with Rule 10 (Traffic Separation Schemes) of the International Regulations for Preventing Collisions at Sea, 1972 when navigating within the boundaries of all local statutory TSSs in the waters of Hong Kong. 8. Owners, operators, masters, coxswains and persons-in-charge of vessels should refer to the relevant legislation and the latest nautical charts and publications for the applicable boundaries and operational requirements, and take account of the revised arrangements when planning and conducting vessel movements. Details of the Amendment Regulation can be found the following link: https://www.elegislation.gov.hk/hk/2026/ln102!en https://www.elegislation.gov.hk/hk/2026/ln103!en https://www.elegislation.gov.hk/hk/2026/ln104!en https://www.elegislation.gov.hk/hk/2026/ln105!en https://www.elegislation.gov.hk/hk/2026/ln106!en https://www.elegislation.gov.hk/hk/2026/ln107!en 9. For the coordinates and boundaries of the revised anchorages, please refer to the appendix of this notice. Information on the changes to anchorages, port facilities and traffic separation schemes is also available at the Marine Department website: https://www.mardep.gov.hk/en/materials-and-publications/publicity-materials/ index.html Mr. Q. SHI Director of Marine (Acting) Marine Department Government of the HKSAR Date: 13 November 2026 Action File Ref.: L/M. No. 14/26 in MD-PD&PS-F01-075-01A-044-P002 Appendix Kellett Bank Area (1) Coordinates and boundaries of the Kellett Anchorage No. 1 The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude (i) 22°18.507´N 114°06.610´E (ii) 22°18.719´N 114°06.486´E (iii) 22°18.719´N 114°06.123´E (iv) 22°18.325´N 114°05.914´E (v) 22°17.825´N 114°05.964´E (vi) 22°17.617´N 114°06.086´E (vii) 22°17.617´N 114°06.763´E (2) Coordinates and boundaries of the Kellett Anchorage No. 2 The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude (i) 22°17.923´N 114°07.114´E (ii) 22°17.617´N 114°07.309´E (iii) 22°17.788´N 114°08.148´E (iv) 22°18.550´N 114°07.477´E (3) Coordinates and boundaries of the Kellett Anchorage No. 3 The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude (i) 22°17.788´N 114°08.148´E (ii) 22°18.550´N 114°07.477´E (iii) 22°18.773´N 114°07.606´E (iv) 22°18.722´N 114°07.707´E (v) 22°17.845´N 114°08.425´E (4) Coordinates and boundaries of the Kellett Dangerous Goods Anchorage No.1 The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude (i) 22°18.858´N 114°06.197´E (ii) 22°19.185´N 114°06.798´E (iii) 22°18.932´N 114°07.295´E (iv) 22°18.318´N 114°06.642´E (v) 22°18.507´N 114°06.610´E (vi) 22°18.719´N 114°06.486´E (vii) 22°18.719´N 114°06.123´E (5) Coordinates and boundaries of the Kellett Dangerous Goods Anchorage No.2 The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude (i) 22°17.617´N 114°06.763´E (ii) 22°17.617´N 114°06.937´E (iii) 22°18.408´N 114°07.395´E (iv) 22°18.625´N 114°06.968´E (v) 22°18.318´N 114°06.642´E (6) Coordinates and boundaries of the Western Dangerous Goods Anchorage The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude (i) 22°18.932´N 114°07.295´E (ii) 22°18.773´N 114°07.606´E (iii) 22°18.408´N 114°07.395´E (iv) 22°18.625´N 114°06.968´E (7) Coordinates and boundaries of the Western Quarantine & Immigration Anchorage The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude (i) 22°17.617´N 114°06.937´E (ii) 22°17.923´N 114°07.114´E (iii) 22°17.617´N 114°07.309´E Lamma Island Area (8) Coordinates and boundaries of the East Lamma Anchorage The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude (i) 22°11.776´N 114°09.792´E (ii) 22°11.776´N 114°10.196´E (iii) 22°11.131´N 114°10.537´E (iv) 22°11.131´N 114°09.240´E (9) Coordinates and boundaries of the South-east Lamma Dangerous Goods Anchorage The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude (i) 22°10.308´N 114°08.872´E (ii) 22°10.308´N 114°10.146´E (iii) 22°10.046´N 114°10.780´E (iv) 22°09.408´N 114°11.117´E (v) 22°09.408´N 114°08.872´E (10) Coordinates and boundaries of the South Lamma Anchorage The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude (i) 22°10.308´N 114°06.747´E (ii) 22°10.308´N 114°08.672´E (iii) 22°09.408´N 114°08.672´E (iv) 22°09.408´N 114°07.069´E (v) 22°09.568´N 114°06.747´E (11) Coordinates and boundaries of the South-west Lamma Anchorage The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude (i) 22°10.308´N 114°04.095´E (ii) 22°10.308´N 114°05.551´E (iii) 22°09.521´N 114°05.551´E (iv) 22°10.058´N 114°04.095´E (12) Coordinates and boundaries of the Ha Mei Wan Anchorage The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude (i) 22°12.027´N 114°06.549´E (ii) 22°12.080´N 114°06.896´E (iii) 22°11.722´N 114°06.958´E (iv) 22°11.426´N 114°06.654´E (13) Coordinates and boundaries of the South Cheung Chau Anchorage The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude (i) 22°10.060´N 114°02.325´E (ii) 22°10.060´N 114°03.747´E (iii) 22°09.771´N 114°04.534´E (iv) 22°09.291´N 114°04.534´E (v) 22°09.291´N 114°02.325´E Yau Ma Tei Area (14) Coordinates and boundaries of the Yau Ma Tei Anchorage No. 1 The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude (i) 22°18.329´N 114°08.747´E (ii) 22°18.329´N 114°09.064´E (iii) 22°18.044´N 114°09.064´E (iv) 22°17.934´N 114°08.943´E (v) 22°18.027´N 114°08.600´E (15) Coordinates and boundaries of the Yau Ma Tei Anchorage No. 2 The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude (i) 22°18.992´N 114°08.747´E (ii) 22°19.108´N 114°08.864´E (iii) 22°19.092´N 114°09.064´E (iv) 22°18.798´N 114°09.064´E (v) 22°18.798´N 114°08.747´E (16) Coordinates and boundaries of the South-east Stonecutters Island Designated Bunkering Area The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude (i) 22°18.765´N 114°08.747´E (ii) 22°18.765´N 114°08.852´E (iii) 22°18.716´N 114°08.852´E (iv) 22°18.716´N 114°08.747´E Other Area (17) Coordinates and boundaries of the Hei Ling Chau Dangerous Goods Anchorage The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude (i) 22°14.058´N 114°02.964´E (ii) 22°14.838´N 114°03.862´E (iii) 22°14.533´N 114°04.427´E (iv) 22°13.520´N 114°03.980´E MARINE DEPARTMENT NOTICE NO. 214/2026 (Navigation Warnings & Related Information) Cross Harbour Swimming Races and Closure of Landing Steps NOTICE IS HEREBY GIVEN that swimming races across the Central Harbour from Wan Chai, Hong Kong Island to Tsim Sha Tsui, Kowloon will take place from 0700 hours to 1100 hours on 15 November 2026. About 4,000 swimmers, under the escort of guard boats, are expected to participate in the races. 2. Launches of the Marine Department and Marine Police will be stationed or patrolling in the Central Harbour before and during the event. 3. Masters, coxswains and persons-in-charge of all vessels navigating in the vicinity should proceed with caution and give a wide berth to the swimmers, and follow the directions given by officers on Marine Department and Marine Police launches regulating marine traffic in the vicinity. 4. As the marine traffic in the Central Harbour will be affected by the races, vessel operators are advised to adjust their sailing schedules in order to avoid obstructing the races. 5. To facilitate the event, the following landing steps will be temporarily closed: (i) Public Landings at the starting/finishing points – from 0900 hours on 14 November 2026 to 1300 hours on 15 November 2026; (ii) Kowloon Public Pier No. 1 – from 0900 hours on 14 November 2026 to 1300 hours on 15 November 2026; and (iii) Kowloon Public Pier No. 2 to No. 4 – from 0500 hours to 1300 hours on 15 November 2026. 6. During the aforementioned closure periods, owners and coxswains of vessels are advised to use other landing facilities in the vicinity. 7. A drawing showing the route of the races and the affected landing step is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 10 November 2026 Action File Ref.: L/M 704/26 in MD-HPS-F01-015-045-002 不宜作航行用途 NOT TO BE USED FOR NAVIGATION MARINE DEPARTMENT NOTICE NO. 211/2026 (Navigation Warnings & Related Information) Establishment of a Restricted Area and Closure of Landing Steps off the Wan Chai Basin NOTICE IS HEREBY GIVEN that a Restricted Area will be established on 15 November 2026, from 1700 hours to 2200 hours, at the waters off Wan Chai Basin to facilitate a drone performance. 2. The Restricted Area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (E) and the adjacent shoreline: Latitude Longitude (A) 22〫 16.986’N 114〫 10.638’E (B) 22〫 17.178’N 114〫 10.638’E (C) 22〫 17.178’N 114〫 10.890’E (D) 22〫 17.070’N 114〫 10.890’E (E) 22〫 17.052’N 114〫 10.860’E 3. During the aforementioned period, the landing steps of Wan Chai Bypass Landing No.5 (HP162) and No.6 (HP163) will be temporarily closed. Owners and coxswains of vessels are advised to use other landing facilities in the vicinity during the period of closure. Other than Government launches and permitted vessels engaged in the performance, no vessels will be allowed to enter or remain within the Restricted Area. 4. In the event of inclement weather or emergency, the fallback date would be 16 November 2026. 5. A drawing showing the Restricted Area, drone performance area and the affected landing steps is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 4 November 2026 Action File Ref.: L/M 1037/26 in MD-HPS-F01-015-04B-002 不宜作航行用途 NOT TO BE USED FOR NAVIGATION MARINE DEPARTMENT NOTICE NO. 209/2026 (Navigation Warnings & Related Information) Establishment of a Restricted Area off the New Hung Hom Harbourfront NOTICE IS HEREBY GIVEN that a Restricted Area will be established on 10 November 2026 (rehearsal), 12 and 14 November 2026 (event days), from 1700 hours to 2359 hours, in Victoria Harbour off the New Hung Hom Harbourfront to facilitate a drone performance. 2. The Restricted Area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: Latitude Longitude (A) 22〫 17.860’N 114〫 10.983’E (B) 22〫 17.839’N 114〫 11.003’E (C) 22〫 17.702’N 114〫 10.732’E (D) 22〫 17.796’N 114〫 10.659’E 3. During the aforementioned periods, the landing steps of Tsim Sha Tsui Landing No. 5 (KP029) will be temporarily closed. Owners and coxswains of vessels are advised to use other landing facilities in the vicinity during the periods of closure. Other than Government launches and permitted vessels engaged in the performance, no vessels will be allowed to enter or remain within the Restricted Area. 4. In the event of inclement weather or emergency, the fallback dates would be 13, 15 and 17 November 2026. 5. A drawing showing the Restricted Area and the affected landing steps is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 4 November 2026 Action File Ref.: L/M 1166/26 in MD-HPS-F01-015-04B-002 MARINE DEPARTMENT NOTICE NO. 207/2026 (Marine Works) Submarine Outfall Inspection Works off Sai Kung With immediate effect and for a period of approximately three months, submarine outfall inspection works will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D): (A) 22-22.27N 114-16.61E (B) 22-22.23N 114-16.66E (C) 22-22.22N 114-16.65E (D) 22-22.26N 114-16.60E 2. The works will be carried out by one work boat. One guard boat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 20 metres around the work boat will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the work boat. 4. The hours of work will be from 0800 to 1800 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will not stay in the works area outside the hours of work. 5. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are diving operations in the area. 6. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 3 November 2026 Action File Ref.: L/M No. 37/26 in MD-PD&PS-F01-075-01A-001A-P103 MARINE DEPARTMENT NOTICE NO. 206/2026 (Marine Works) Submarine Outfall Inspection Works off Ma Liu Shui With immediate effect and for a period of approximately two months, submarine outfall inspection works will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D): (A) 22-25.05N 114-13.12E (B) 22-25.02N 114-13.18E (C) 22-25.01N 114-13.17E (D) 22-25.04N 114-13.12E 2. The works will be carried out by one work boat. One guard boat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 20 metres around the work boat will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the work boat. 4. The hours of work will be from 0800 to 1800 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will not stay in the works area outside the hours of work. 5. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are diving operations in the area. 6. A drawing showing the works area is attached to this Notice. Mr. Q. SHI Director of Marine (Acting) Marine Department Government of the HKSAR Date: 28 October 2026 Action File Ref.: L/M No. 35/26 in MD-PD&PS-F01-075-01A-001A-P102 MARINE DEPARTMENT NOTICE NO. 197/2026 (Navigation Warnings & Related Information) Establishment of a Restricted Area off the New Hung Hom Harbourfront NOTICE IS HEREBY GIVEN that a Restricted Area will be established on 6, 7, 13, 14, 20, 21, 27 and 28 November 2026, from 1700 hours to 2200 hours, in Victoria Harbour off the New Hung Hom Harbourfront to facilitate a drone performance. 2. The Restricted Area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: Latitude Longitude (A) 22〫 17.860’N 114〫 10.983’E (B) 22〫 17.839’N 114〫 11.003’E (C) 22〫 17.727’N 114〫 10.862’E (D) 22〫 17.860’N 114〫 10.736’E 3. During the aforementioned periods, the landing steps of Tsim Sha Tsui Landing No. 5 (KP029) will be temporarily closed. Owners and coxswains of vessels are advised to use other landing facilities in the vicinity during the periods of closure. Other than Government launches and permitted vessels engaged in the performance, no vessels will be allowed to enter or remain within the Restricted Area. 4. In the event of inclement weather or emergency, the fallback dates would be 8, 15, 22 and 29 November 2026. 5. A drawing showing the Restricted Area and the affected landing steps is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 23 October 2026 Action File Ref.: L/M 1141/26 in MD-HPS-F01-015-04B-002 不宜作航行用途 NOT TO BE USED FOR NAVIGATION MARINE DEPARTMENT NOTICE NO. 196/2026 (Navigation Warnings & Related Information) Establishment of a Restricted Area off the Hung Hom Promenade NOTICE IS HEREBY GIVEN that a Restricted Area will be established on 6, 13, 20, 27 November 2026 (rehearsal) and 7, 14, 21, 28 November 2026 (event dates), from 2000 hours to 2230 hours, in Victoria Harbour off Hung Hom Promenade to facilitate a drone performance 2. The Restricted Area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: Latitude Longitude (A) 22〫 18.060’N 114〫 11.383’E (B) 22〫 17.967’N 114〫 11.429’E (C) 22〫 17.905’N 114〫 11.291’E (D) 22〫 18.001’N 114〫 11.241’E 3. During the aforementioned periods, no vessels, other than Government launches and permitted vessels engaged in the performance, will be allowed to enter or remain within the Restricted Area. All vessels navigating in the vicinity should keep away from the Restricted Area. 4. A drawing showing the Restricted Area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 23 October 2026 Action File Ref.: L/M 1142/26 in MD-HPS-F01-015-04B-002 不宜作航行用途 NOT TO BE USED FOR NAVIGATION MARINE DEPARTMENT NOTICE NO. 192/2026 (Marine Works) Valve Installation and Pipe Connection Works in Yau Tong Sewage Pumping Station With immediate effect and for a period of approximately eight months, valve installation and pipe connection works will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-17.64N 114-14.00E (B) 22-17.63N 114-13.96E (C) 22-17.67N 114-13.95E (D) 22-17.68N 114-13.98E 2. The works will be carried out by two work boats. One dumb lighter, one tugboat and two landing pontoons will provide assistance. The number of vessels engaged in the works will change from time to time to suit operational requirements. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 10 metres around the work boats will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 4. The hours of work will be round the clock. No works will be carried out on Sundays and public holidays. Vessels employed for the works will not stay in the works area outside the hours of work. 5. Vessels navigating in the vicinity should proceed with caution. 6. A drawing showing the works area is attached to this Notice. This Notice is an extension of Marine Department Notice No. 46/2026. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 16 October 2026 Action File Ref.: L/M No. 45/25 in MD-PD&PS-F01-075-01A-001A-P087 MARINE DEPARTMENT NOTICE NO. 191/2026 (Marine Works) Temporary Establishment of Acoustic Monitors for Marine Mammal Survey at Lamma Island With immediate effect and for a period of approximately 14 months, acoustic monitors will be temporarily established at the following locations (WGS 84 Datum): (A) 22-13.29N 114-08.15E (B) 22-12.59N 114-07.82E (C) 22-10.85N 114-08.91E 2. The acoustic monitors will be laid at the co-ordinates from (A) to (C). The acoustic monitor is an instrument for collecting marine mammal data. It will be fixed to a gravity anchor on the seabed. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the three acoustic monitors. 3. Laying of the monitors will be carried out by a work boat and a working area of approximately 10 metres around the work boat will be established. One guard boat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 4. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will not stay in the works locations outside the hours of work. 5. Diving operations for retrieving data from the monitors will be carried out by the work boat in the above locations from time to time. Vessels navigating in the vicinity should proceed with caution and keep clear of the works locations at slow speed, bearing in mind that there are diving operations in the locations, and the water depths above these acoustic monitors are reduced. 6. A drawing showing the locations of the monitors is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 15 October 2026 Action File Ref.: L/M. No. 33/26 in MD-PD&PS-F01-075-01A-001A-P101 MARINE DEPARTMENT NOTICE NO. 190/2026 (Marine Works) Submarine Outfall Inspection Works off Stonecutters Island and at Western Dangerous Goods Anchorage With immediate effect and for a period of approximately three months, submarine outfall inspection works will be carried out in the following works areas: Works Area 1: This area is bounded by straight lines joining the following coordinates (WGS 84 Datum) from (A) to (D): (A) 22-19.11N 114-07.57E (B) 22-19.09N 114-07.58E (C) 22-19.08N 114-07.56E (D) 22-19.09N 114-07.54E Works Area 2: This area is bounded by straight lines joining the following coordinates (WGS 84 Datum) from (E) to (H): (E) 22-18.93N 114-07.27E (F) 22-18.92N 114-07.28E (G) 22-18.46N 114-06.79E (H) 22-18.47N 114-06.78E 2. The works will be carried out by one work boat. One guard boat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3 A working area of approximately 20 metres around the work boat will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the work boat. 4. The hours of work will be from 0800 to 1800 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will not stay in the works areas outside the hours of work. 5. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works areas at slow speed, bearing in mind that there are diving operations in the areas. 6. A drawing showing the works areas is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 15 October 2026 Action File Ref.: L/M. No. 12/26 in MD-PD&PS-F01-075-01A-002-P027 MARINE DEPARTMENT NOTICE NO. 188/2026 (Marine Works) Improvement Works for the Construction of the North Waterfront Promenade at Mui Wo With immediate effect and for a period of approximately seven months, improvement works for the construction of the North Waterfront Promenade at Mui Wo will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (E) and the adjacent shoreline: (A) 22-15.96N 114-00.06E (B) 22-15.98N 114-00.07E (C) 22-15.97N 114-00.09E (D) 22-15.98N 114-00.11E (E) 22-15.95N 114-00.12E 2. The works will be carried out by one dumb lighter. One tugboat and one work boat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 10 metres around the dumb lighter will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the dumb lighter. 4. Silt curtains which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed will be established within the works area. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 5. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 6. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are diving operations in the area. 7. A drawing showing the works area is attached to this Notice. This Notice is an extension of Marine Department Notice No. 208/2025. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 14 October 2026 Action File Ref.: L/M No. 43/24 in MD-PD&PS-F01-075-01A-003-P062 MARINE DEPARTMENT NOTICE NO. 180/2026 (Marine Works) Marine Archaeological Survey to the South of Hong Kong-Zhuhai-Macao Bridge Hong Kong Port With immediate effect and for a period of approximately one month, marine archaeological survey will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D): (A) 22-18.72N 113-56.90E (B) 22-18.72N 113-56.94E (C) 22-18.70N 113-56.94E (D) 22-18.70N 113-56.90E 2. The survey will be carried out by one work boat. A working area of approximately 50 metres around the work boat will be established. Vessel engaged in the survey will display signals as prescribed in international and local regulations. 3. The hours of work will be from 0800 to 1800 hours. No survey will be carried out on Sundays and public holidays. Vessel employed for the survey will not stay at the survey area outside the hours of work. 4. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the survey area at slow speed, bearing in mind that there are diving operations in the area. 5. A drawing showing the survey area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 9 October 2026 Action File Ref.: L/M. No. 14/26 in MD-PD&PS-F01-075-01A-003-P075 MARINE DEPARTMENT NOTICE NO. 178/2026 (Marine Works) Marine Site Investigation off Aberdeen South Typhoon Shelter With immediate effect and for a period of approximately 12 months, marine site investigation works involving sampling of subsea soil, drilling of boreholes and cone penetration tests will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (K) and the adjacent shoreline: (A) 22-13.96N 114-09.68E (B) 22-13.96N 114-09.71E (C) 22-14.00N 114-09.77E (D) 22-14.04N 114-09.81E (E) 22-14.04N 114-09.84E (F) 22-13.90N 114-09.95E (G) 22-13.84N 114-09.85E (H) 22-13.84N 114-09.82E (J) 22-13.87N 114-09.75E (K) 22-13.86N 114-09.68E 2. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the boundary of the works area at co-ordinates from (E) to (F). 3. The works will be carried out by one dumb lighter, one flat-top barge and one jack-up barge. One tugboat, one work boat and one transportation boat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 4. A working area of approximately 50 metres around each barge and dumb lighter will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the flat-top barge and dumb lighter. Yellow flashing lights will be installed at the four corners of the jack-up barge to indicate its position. 5. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 6. Vessels navigating in the vicinity should proceed with caution. 7. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 5 October 2026 Action File Ref.: L/M. No. 32/26 in MD-PD&PS-F01-075-01A-001A-P101 MARINE DEPARTMENT NOTICE NO. 177/2026 (Marine Works) Marine Works at Nim Wan, Deep Bay With immediate effect and for a period of approximately nine months, marine works involving reclamation works and seawall construction will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (F) and the adjacent shorelines: (A) 22-25.41N 113-55.59E (B) 22-25.42N 113-55.59E (C) 22-25.47N 113-55.81E (D) 22-25.46N 113-55.81E (E) 22-25.34N 113-55.73E (F) 22-25.35N 113-55.68E 2. The works will be carried out by one derrick barge, one flat-top barge and one work boat. One tugboat and one guard boat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 30 metres will be established around each working vessel. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 4. Silt curtains which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed will be established within the works area. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 5. The hours of work will be from 0800 to 2300 hours daily. Vessels employed for the works will stay in the works area outside the hours of work. 6. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are diving operations in the area. 7. A drawing showing the works area is attached to this Notice. This Notice is an extension of Marine Department Notice No. 137/2024. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 28 September 2026 Action File Ref.: L/M No. 18/24 in MD-PD&PS-F01-075-01A-003-P057 MARINE DEPARTMENT NOTICE NO. 168/2026 (Marine Works) Marine Works at Tuen Mun River With immediate effect and for a period of approximately twelve months, marine works involving construction of temporary platforms and viaduct superstructures will be carried out in the following works areas: Works Area 1: This area is bounded by straight lines joining the following coordinates (WGS 84 Datum) from (A) to (K) and the adjacent shoreline: (A) 22-22.84N 113-58.09E (B) 22-22.82N 113-58.08E (C) 22-22.87N 113-58.04E (D) 22-22.96N 113-58.04E (E) 22-23.03N 113-58.06E (F) 22-23.09N 113-58.10E (G) 22-23.13N 113-58.14E (H) 22-23.18N 113-58.19E (J) 22-23.19N 113-58.21E (K) 22-23.18N 113-58.24E Works Area 2: This area is bounded by straight lines joining the following coordinates (WGS 84 Datum) from (L) to (Q) and the adjacent shoreline (L) 22-22.83N 113-58.03E (M) 22-22.83N 113-58.04E (N) 22-22.85N 113-58.04E (P) 22-22.80N 113-58.08E (Q) 22-22.76N 113-58.06E 2. The works will be carried out by three dumb lighters and one crane barge. Two work boats, two cargo vessels and one tugboat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 20 metres around the working vessels will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 4. The hours of work will be from 0700 to 1900 hours daily. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works areas outside the hours of work. 5. Silt curtains which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed will be established within the works areas. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 6. Vessels navigating in the vicinity should proceed with caution. 7. A drawing showing the works areas is attached to this Notice. This Notice supersedes Marine Department Notice No. 35/2026. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 18 September 2026 Action File Ref.: L/M. No. 3/24 in MD-PD&PS-F01-075-01A-003-P054 MARINE DEPARTMENT NOTICE NO. 164/2026 (Marine Works) Fender Piles Repair Works at the Castle Peak Power Station Jetty, Tap Shek Kok With immediate effect and for a period of approximately six months, fender piles repair works will be carried out in the following works areas: Works Area 1: This area is bounded by straight lines joining the following coordinates (WGS 84 Datum) from (A) to (C) and the adjacent shoreline: (A) 22-22.39N 113-54.99E (B) 22-22.23N 113-55.17E (C) 22-22.17N 113-55.14E Works Area 2: This area is bounded by straight lines joining the following coordinates (WGS 84 Datum) from (D) to (G) and the adjacent shoreline: (D) 22-22.16N 113-55.13E (E) 22-22.11N 113-55.10E (F) 22-22.33N 113-54.86E (G) 22-22.36N 113-54.90E 2. The works will be carried out by one dumb lighter. One tugboat and one work boat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3 A working area of approximately 20 metres around the lighter will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the lighter. 4. The hours of work will be from 0800 to 1800 hours daily. Vessels employed for the works will stay in the works areas outside the hours of work. 5. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works areas at slow speed, bearing in mind that there are diving operations in the areas. 6. A drawing showing the works areas is attached to this Notice. This Notice supersedes Marine Department Notice No. 260/2025. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 15 September 2026 Action File Ref.: L/M. No. 44/23 in MD-PD&PS-F01-075-01A-003-P053 MARINE DEPARTMENT NOTICE NO. 159/2026 (Marine Works) Marine Works of Three-Runway System at the Hong Kong International Airport With immediate effect and for a period of approximately four months, marine works involving seawall construction and barging operations will be carried out within the following works areas: Works Area 1: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (G) and the adjacent shoreline: (A) 22-19.83N 113-55.36E (B) 22-19.84N 113-55.40E (C) 22-19.72N 113-55.44E (D) 22-19.64N 113-55.74E (E) 22-19.64N 113-55.83E (F) 22-19.52N 113-56.23E (G) 22-19.30N 113-56.31E Works Area 2: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (H) to (M) and the adjacent shoreline: (H) 22-18.99N 113-54.07E (I) 22-18.97N 113-54.02E (J) 22-19.11N 113-53.97E (K) 22-19.12N 113-53.99E (L) 22-19.33N 113-53.91E (M) 22-19.34N 113-53.94E 2. The works will be carried out by a flotilla of vessels including pelican barges, cement supply barges, derrick lighters, roro barges and flat top barges. Tugboats and work boats will provide assistance. The number of vessels engaged in the works will change from time to time to suit operational requirements. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. The hours of work will be round-the-clock. A working area of approximately 50 metres will be established around the working vessels. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. Vessels navigating in the vicinity should proceed with caution. 4. A drawing showing the works areas is attached to this Notice. This Notice is an extension of Marine Department Notice No. 192/2025. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 10 September 2026 Action File Ref.: L/M No. 22/24 in MD-PD&PS-F01-075-01A-003-P058 MARINE DEPARTMENT NOTICE NO. 157/2026 (Navigation Warnings & Related Information) Establishment of a Restricted Area between Hong Kong International Airport and Hong Kong-Zhuhai-Macao Bridge Hong Kong Port With immediate effect and for a period of approximately three months, a Restricted Area will be established between Hong Kong International Airport and Hong Kong-Zhuhai-Macao Bridge Hong Kong Port to facilitate a yacht exhibition. 2. The Restricted Area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (E) and the adjacent shoreline: Latitude Longitude (A) 22〫 19.329’N 113〫 56.755’E (B) 22〫 19.355’N 113〫 56.821’E (C) 22〫 19.339’N 113〫 56.887’E (D) 22〫 19.195’N 113〫 56.842’E (E) 22〫 19.190’N 113〫 56.772’E 3. Three yellow marker buoys fitted with yellow flashing lights will be laid from co-ordinates (B) to (D) to indicate the boundary of the Restricted Area. 4. A temporary mooring facility will be established within the Restricted Area to accommodate the display yachts and will be enclosed by a wave attenuator consisting of six flat-top barges and plastic floating barriers. 5. During the aforementioned period, no vessels, other than Government launches or vessels engaged in the said event, will be allowed to enter or remain within the Restricted Area. Masters, coxswains and persons-in-charge of all vessels navigating in the vicinity should keep away from the Restricted Area. 6. A drawing showing the Restricted Area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 9 September 2026 Action File Ref.: L/M 912/26 in MD-HPS-F01-015-04B-002 MARINE DEPARTMENT NOTICE NO. 152/2026 (Marine Works) Coastal Enhancement Works at Heng Fa Chuen With immediate effect and for a period of approximately four months, coastal enhancement works will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-16.74N 114-14.45E (B) 22-16.75N 114-14.49E (C) 22-16.55N 114-14.54E (D) 22-16.55N 114-14.50E 2. The works will be carried out by one dump lighter. One flat-top barge and one tugboat will provide assistance. The number of vessels engaged in the works will change from time to time to suit operational requirements. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 4. A working area of approximately 40 metres around the lighter will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the lighter. 5. Vessels navigating in the vicinity should proceed with caution. 6. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 27 August 2026 Action File Ref.: L/M No. 25/26 in MD-PD&PS-F01-075-01A-001A-P099 MARINE DEPARTMENT NOTICE NO. 151/2026 (Marine Works) Marine Works in Shing Mun River Channel, Sha Tin With immediate effect and for a period of approximately 16 months, marine works involving marine bore pile works will be carried out within the following works areas: Works Area 1: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shorelines: (A) 22-22.61N 114-11.20E (B) 22-22.57N 114-11.22E (C) 22-22.55N 114-11.17E (D) 22-22.59N 114-11.15E Works Area 2: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (E) to (H) and the adjacent shoreline: (E) 22-22.66N 114-10.77E (F) 22-22.66N 114-10.76E (G) 22-22.70N 114-10.73E (H) 22-22.70N 114-10.74E 2. The works will be carried out by one dump lighter. One flat-top work barge, one landing pontoon and one workboat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works areas outside the hours of work. 4. A working area of approximately 20 metres around the working vessels will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 5. Silt curtains which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed will be established within the works areas. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 6. Vessels navigating in the vicinity should proceed with caution. 7. A drawing showing the works areas is attached to this Notice. This Notice supersedes Marine Department Notice No. 17/2025. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 27 August 2026 Action File Ref.: L/M. No.02/25 in MD-PD&PS-F01-075-01A-001A-P073 MARINE DEPARTMENT NOTICE NO. 150/2026 (Marine Works) Repair Works for Seawall at Kennedy Town With immediate effect and for a period of approximately four months, repair works for seawall will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-17.02N 114-07.54E (B) 22-17.05N 114-07.54E (C) 22-17.05N 114-07.59E (D) 22-17.03N 114-07.59E 2. The works will be carried out by one dumb lighter. One tugboat and one crane boat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 4. A working area of approximately 50 metres around the working vessels will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 5. A silt curtain which is a large piece of netting to contain mud and sediments extending from the sea surface to the seabed will be established within the works area. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtain. 6. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are diving operations in the area. 7. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 26 August 2026 Action File Ref.: L/M No. 10/26 in MD-PD&PS-F01-075-01A-002-P027 MARINE DEPARTMENT NOTICE NO. 148/2026 (Marine Works) Marine Site Investigation off Tap Shek Kok With immediate effect and for a period of approximately three months, marine site investigation works involving drilling of vibrocores will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (E): (A) 22-23.24N 113-54.54E (B) 22-23.16N 113-54.68E (C) 22-22.55N 113-54.86E (D) 22-22.44N 113-54.56E (E) 22-23.21N 113-54.31E 2. The works will be carried out by one flat-top barge. Two tugboats will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 50 metres around the flat-top barge will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the flat-top barge. 4. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 5. Vessels navigating in the vicinity should proceed with caution. 6. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 20 August 2026 Action File Ref.: L/M. No. 12/26 in MD-PD&PS-F01-075-01A-003-P075 MARINE DEPARTMENT NOTICE NO. 141/2026 (Marine Works) Desilting works between Cheung Chau Ferry Pier and Public Pier With immediate effect and for a period of approximately four months, desilting works will be carried out within the works area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-12.48N 114-01.70E (B) 22-12.48N 114-01.67E (C) 22-12.50N 114-01.67E (D) 22-12.51N 114-01.72E 2. The works will be carried out by one work boat. One tugboat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 50 metres around the work boat will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the work boat. 4. A silt curtain which is a large piece of netting to contain mud and sediments extending from the sea surface to the seabed will be established within the works area. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtain. 5. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will not stay in the works area outside the hours of work. 6. Vessels navigating in the vicinity should proceed with caution. 7. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 11 August 2026 Action File Ref.: L/M No. 13/26 in MD-PD&PS-F01-075-01A-003-P075 MARINE DEPARTMENT NOTICE NO. 138/2026 (Marine Works) Establishment of Silt Curtain in Deep Water Bay With immediate effect and for a period of approximately 12 months, marine works involving the establishment of a silt curtain will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-14.16N 114-11.42E (B) 22-14.16N 114-11.38E (C) 22-14.19N 114-11.35E (D) 22-14.19N 114-11.38E 2. Silt curtain is a large piece of netting to contain mud and sediments extending from the sea surface to the seabed. Yellow flashing lights will be laid to mark the extent of the silt curtain upon completion. 3. The works will be carried out by one dumb lighter. One tugboat and one work boat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 4. A working area of approximately 20 metres around the lighter will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the lighter. 5. The hours of work will be from 0800 to 1800 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 6. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are diving operations in the area. 7. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 30 July 2026 Action File Ref.: L/M No. 22/26 in MD-PD&PS-F01-075-01A-001A-P098 MARINE DEPARTMENT NOTICE NO. 136/2026 (Marine Works) Construction Works for Wave Wall inside Cheung Chau Typhoon Shelter With immediate effect and for a period of approximately 13 months, construction works for wave wall will be carried out within the works area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (E) and the adjacent shoreline: (A) 22-12.32N 114-01.49E (B) 22-12.35N 114-01.49E (C) 22-12.35N 114-01.54E (D) 22-12.37N 114-01.64E (E) 22-12.35N 114-01.65E 2. The works will be carried out by one dumb lighter and one roro-barge. One dry cargo vessel and one tugboat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 15 metres around the working vessels will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 4. Silt curtains which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed, will be established within the works area. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 5. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 6. Vessels navigating in the vicinity should proceed with caution. 7. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 29 July 2026 Action File Ref.: L/M No. 10/26 in MD-PD&PS-F01-075-01A-003-P075 MARINE DEPARTMENT NOTICE NO. 133/2026 (Marine Works) Repair Works for Dolphins in To Kwa Wan Typhoon Shelter With immediate effect and for a period of approximately five months, repair works for dolphins will be carried out in To Kwa Wan Typhoon Shelter. 2. The works will be carried out by one crane boat. The boat engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 20 metres around the boat will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the boat. 4. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. The boat employed for the works will not stay in the works area outside the hours of work. 5. A silt curtain, extending from the sea surface to the seabed, will be established around the dolphins for repair. Yellow flashing lights will be laid along the surface of the silt curtain to mark the extent of the silt curtain. 6. Vessels navigating in the vicinity should proceed with caution. 7. A drawing showing the locations of the dolphins is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 17 July 2026 Action File Ref.: L/M No. 20/26 in MD-PD&PS-F01-075-01A-001A-P097 MARINE DEPARTMENT NOTICE NO. 132/2026 (Marine Works) Repair Works for Seawall at Stanley Bay With immediate effect and for a period of approximately six months, repair works for seawall will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-13.10N 114-12.68E (B) 22-13.07N 114-12.67E (C) 22-13.08N 114-12.61E (D) 22-13.11N 114-12.62E 2. The works will be carried out by one special purpose vessel. One tugboat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 4. A working area of approximately 50 metres around the special purpose vessel will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the special purpose vessel. 5. A silt curtain which is a large piece of netting to contain mud and sediments extending from the sea surface to the seabed will be established within the works area. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtain. 6. Vessels navigating in the vicinity should proceed with caution. 7. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 17 July 2026 Action File Ref.: L/M No. 21/26 in MD-PD&PS-F01-075-01A-001A-P097 MARINE DEPARTMENT NOTICE NO. 129/2026 (Marine Works) Reconstruction Works for Yung Shue Wan Public Pier With immediate effect and for a period of approximately six months, reconstruction works for Yung Shue Wan Public Pier will be carried out in the following works areas: Works area 1: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (E) and the adjacent shoreline: (A) 22-13.59N 114-06.54E (B) 22-13.62N 114-06.53E (C) 22-13.63N 114-06.56E (D) 22-13.62N 114-06.57E (E) 22-13.62N 114-06.57E Works area 2: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (F) to (J) and the adjacent shoreline: (F) 22-13.62N 114-06.61E (G) 22-13.61N 114-06.61E (H) 22-13.59N 114-06.62E (I) 22-13.55N 114-06.55E (J) 22-13.58N 114-06.54E 2. The works will be carried out by one dumb lighter. One tug will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 35 metres around the lighter will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the lighter. 4. A silt curtain, extending from the sea surface to the seabed, will be established beside the lighter within the works areas. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtain. 5. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works areas outside the hours of work. 6. Diving operations will be carried out from time to time during the hours of work. 7. Vessels navigating in the vicinity should proceed with caution and keep clear of the works areas at slow speed, bearing in mind that there are diving operations in the areas. 8. A drawing showing the works areas is attached to this Notice. This Notice is an extension of Marine Department Notice No. 117/2023. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 10 July 2026 Action File Ref.: L/M No. 28/23 in MD-PD&PS-F01-075-01A-001A-P049 MARINE DEPARTMENT NOTICE NO. 128/2026 (Marine Works) Construction of Viaduct between Hong Kong International Airport and Hong Kong-Zhuhai-Macao Bridge Hong Kong Port With immediate effect and for a period of approximately 6 months, marine works involving the construction of viaduct will be carried out within the following Works Areas: Works Area 1: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-19.00N 113-56.63E (B) 22-18.99N 113-56.67E (C) 22-18.95N 113-56.66E (D) 22-18.96N 113-56.62E Works Area 2: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (E) to (H) and the adjacent shoreline: (E) 22-18.92N 113-56.83E (F) 22-18.93N 113-56.79E (G) 22-19.00N 113-56.80E (H) 22-18.99N 113-56.85E 2. The works will be carried out by one work boat. Vessel engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 30 metres around the work boat will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the work boat. 4. The hours of work will be from 0700 to 1900 hours daily. Vessel employed for the works will stay in the works areas outside the hours of work. 5. Vessels navigating in the vicinity should proceed with caution. 6. A drawing showing the works areas is attached to this Notice. This Notice supersedes Marine Department Notice No. 10/2026. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 10 July 2026 Action File Ref.: L/M No. 1/26 in MD-PD&PS-F01-075-01A-003-P073 MARINE DEPARTMENT NOTICE NO. 126/2026 (Marine Works) Marine Site Investigation at Lung Kwu Tan With immediate effect and for a period of approximately eight months, marine site investigation works involving drilling of boreholes and cone penetration tests will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (C) and the adjacent shoreline: (A) 22-22.85N 113-55.20E (B) 22-23.59N 113-53.96E (C) 22-24.35N 113-54.09E 2. The works will be carried out by four jack-up barges, one flat-top barge and two dumb lighters. Two tugboats will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 50 metres around each barge and dumb lighter will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the flat-top barge and dumb lighters. Yellow flashing lights will be installed at the four corners of each jack-up barge to indicate its position. 4. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 5. Vessels navigating in the vicinity should proceed with caution. 6. A drawing showing the works area is attached to this Notice. This Notice supersedes Marine Department Notice No. 81/2026. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 8 July 2026 Action File Ref.: L/M. No. 3/26 in MD-PD&PS-F01-075-01A-003-P073 MARINE DEPARTMENT NOTICE NO. 125/2026 (Marine Works) Marine Site Investigation to the Southeast of Sunshine Island With immediate effect and for a period of approximately six months, marine site investigation works involving drilling of boreholes will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D): (A) 22-15.68N 114-03.44E (B) 22-15.47N 114-03.89E (C) 22-15.16N 114-03.52E (D) 22-15.40N 114-03.06E 2. The works will be carried out by four jack-up barges. Two tugboats will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 50 metres around each jack-up barge will be established. Yellow flashing lights will be installed at the four corners of each jack-up barge to indicate its position. 4. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 5. Vessels navigating in the vicinity should proceed with caution. 6. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 3 July 2026 Action File Ref.: L/M. No. 9/26 in MD-PD&PS-F01-075-01A-003-P074 MARINE DEPARTMENT NOTICE NO. 123/2026 (Marine Works) Fender Replacement Works at Black Point Power Station With immediate effect and for a period of approximately 10 months, fender replacement works will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-24.71N 113-54.39E (B) 22-24.73N 113-54.37E (C) 22-24.81N 113-54.44E (D) 22-24.79N 113-54.47E 2. The works will be carried out by one work boat. A working area of approximately 15 metres around the work boat will be established. Vessel engaged in the works will display signals as prescribed in international and local regulations. 3. The hours of work will be from 0700 to 1800 hours. No works will be carried out on Sundays and public holidays. Vessel employed for the works will not stay in the works area outside the hours of work. 4. Vessels navigating in the vicinity should proceed with caution. 5. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 29 June 2026 Action File Ref.: L/M No. 7/26 in MD-PD&PS-F01-075-01A-003-P074 MARINE DEPARTMENT NOTICE NO. 120/2026 (Navigational Warnings & Related Information) Establishment of a Restricted Area at Wan Chai Basin With immediate effect and for a period of approximately six months, a Restricted Area will be established at Wan Chai Basin to facilitate water sports and recreation activities in connection with the Water Sports and Recreation Precinct. 2. The Restricted Area is formed by a straight line joining the following co-ordinates (WGS 84 Datum) from (A) to (B) and the adjacent shoreline: (A) 22〫 17.045’N 114〫 10.859’E (B) 22〫 17.030’N 114〫 10.907’E 3. Two yellow marker buoys fitted with yellow flashing lights connected with floating barriers will be laid from co-ordinates (A) to (B) to indicate the northern boundary of the Restricted Area. 4. During the aforementioned period, no vessels, other than Government launches or vessels engaged in the said activity, will be allowed to enter or remain within the Restricted Area. 5. Masters, coxswains and persons-in-charge of all vessels navigating in the vicinity should keep away from the Restricted Area. 6. A drawing showing the Restricted Area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 25 June 2026 Action File Ref.: L/M No. 637/26 in MD-HPS-F01-015-04B-002 不宜作航行用途 NOT TO BE USED FOR NAVIGATION MARINE DEPARTMENT NOTICE NO. 119/2026 (Navigation Warnings & Related Information) Establishment of Designated Anchorages for Visiting Yachts NOTICE IS HEREBY GIVEN that five designated anchorages for visiting yachts will be established in the waters of Tai Tam Bay, Stanley Bay, Three Fathoms Cove, Tai O and Repulse Bay, starting from 29 June 2026 onward. 2. The designated anchorages are bounded by straight lines joining the following co-ordinates (WGS 84 Datum): Tai Tam Bay: (A) 22-13.28N 114-13.77E (B) 22-12.46N 114-13.77E (C) 22-12.46N 114-13.50E (D) 22-13.09N 114-13.50E (E) 22-13.09N 114-13.27E (F) 22-13.28N 114-13.27E Stanley Bay: (G) 22-12.90N 114-12.80E (H) 22-12.72N 114-12.77E (I) 22-12.72N 114-12.69E (J) 22-12.90N 114-12.71E Three Fathoms Cove: (K) 22-26.61N 114-16.06E (L) 22-26.28N 114-16.06E (M) 22-26.28N 114-15.32E (N) 22-26.61N 114-15.32E Tai O (A): (O) 22-16.04N 113-51.69E (P) 22-15.94N 113-51.81E (Q) 22-15.75N 113-51.62E (R) 22-15.85N 113-51.50E Tai O (B): (S) 22-15.06N 113-51.02E (T) 22-14.76N 113-51.02E (U) 22-14.76N 113-50.77E (V) 22-15.06N 113-50.77E Repulse Bay: (W) 22-13.96N 114-11.50E (X) 22-13.89N 114-11.54E (Y) 22-13.76N 114-11.26E (Z) 22-13.83N 114-11.22E 3. Vessels navigating in the vicinity should proceed with caution, bearing in mind that visiting yachts may anchor in the areas. 4. Drawings showing the designated anchorages are attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 25 June 2026 Action File Ref.: MD-LPF-A01-050-02A-C006-P003 MARINE DEPARTMENT NOTICE NO. 116/2026 (Marine Works) Marine Works between Chek Lap Kok and Tung Chung With immediate effect and for a period of approximately 14 months, marine works involving marine bored piling works will be carried out in the following works areas: Works Area 1: This area is bounded by straight lines joining the following coordinates (WGS 84 Datum) from (A) to (F) and the adjacent shoreline: (A) 22-17.64N 113-56.25E (B) 22-17.62N 113-56.27E (C) 22-17.60N 113-56.28E (D) 22-17.56N 113-56.23E (E) 22-17.58N 113-56.21E (F) 22-17.59N 113-56.20E Works Area 2: This area is bounded by straight lines joining the following coordinates (WGS 84 Datum) from (G) to (L) and the adjacent shoreline: (G) 22-17.52N 113-56.28E (H) 22-17.54N 113-56.27E (I) 22-17.55N 113-56.24E (J) 22-17.59N 113-56.29E (K) 22-17.57N 113-56.31E (L) 22-17.55N 113-56.32E 2. The works will be carried out by three crane barges, two flat-top barges and one work boat. Two tugboats will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 50 metres around the working vessels will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 4. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay at the works areas outside the hours of work. 5 Silt curtains, which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed will be established within the works areas. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 6. Vessels navigating in the vicinity should proceed with caution. 7. A drawing showing the works areas is attached to this Notice. This Notice supersedes Marine Department Notice No. 55/2026. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 23 June 2026 Action File Ref.: L/M. No. 5/26 in MD-PD&PS-F01-075-01A-003-P073 MARINE DEPARTMENT NOTICE NO. 115/2026 (Marine Works) Repair Works for Seawall at Joss House Bay With immediate effect and for a period of approximately five months, repair works for seawall will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (C) and the adjacent shoreline: (A) 22-16.18N 114-17.42E (B) 22-16.15N 114-17.38E (C) 22-16.20N 114-17.33E 2. The works will be carried out by one dumb lighter. One tugboat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 4. A working area of approximately 50 metres around the lighter will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the lighter. 5. A silt curtain which is a large piece of netting to contain mud and sediments extending from the sea surface to the seabed will be established within the works area. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtain. 6. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 23 June 2026 Action File Ref.: L/M No. 17/26 in MD-PD&PS-F01-075-01A-001A-P096 MARINE DEPARTMENT NOTICE NO. 114/2026 (Marine Works) Dredging Operations in Shing Mun River Channel, Sha Tin With immediate effect and for a period of approximately five months, dredging operations will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: Works Area: (A) 22-22.95N 114-11.72E (B) 22-22.98N 114-11.68E (C) 22-23.02N 114-11.72E (D) 22-22.99N 114-11.76E 2. The works will be carried out by a flotilla of vessels including three flat-top work barges, one dumb lighter, one hopper barge and two tugboats. The number of vessels engaged in the works will change from time to time to suit operational requirements. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. The dredged materials will be conveyed to the hopper barge anchored within the transshipment area bounded by straight lines joining the following co- ordinates (WGS 84 Datum) from (E) to (H): Transshipment Area: (E) 22-24.80N 114-13.07E (F) 22-24.76N 114-13.18E (G) 22-24.66N 114-13.14E (H) 22-24.70N 114-13.03E 4. Transshipment of dredged materials will take place in this area. The lighter assisted by the tugboat will transfer the dredged materials to the hopper barge from time to time. 5. A working area of approximately 20 metres around the working vessels will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 6. Silt curtains which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed will be established within the works areas. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 7. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area and transshipment area outside the hours of work. 8. Vessels navigating in the vicinity should proceed with caution. 9. A drawing showing the works area and the transshipment area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 23 June 2026 Action File Ref.: L/M No. 18/26 in MD-PD&PS-F01-075-01A-001A-P096 MARINE DEPARTMENT NOTICE NO. 107/2026 (Marine Works) Seawall Modification Works at the South-east of the Hong Kong International Airport With immediate effect and for a period of approximately 22 months, seawall modification works will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (M) and the adjacent shoreline: (A) 22-18.80N 113-56.95E (B) 22-18.80N 113-56.83E (C) 22-18.71N 113-56.82E (D) 22-18.65N 113-56.55E (E) 22-18.55N 113-56.48E (F) 22-18.40N 113-56.49E (G) 22-18.18N 113-56.55E (H) 22-17.97N 113-56.41E (I) 22-17.92N 113-56.38E (J) 22-17.81N 113-56.35E (K) 22-17.80N 113-56.35E (L) 22-17.74N 113-56.37E (M) 22-17.69N 113-56.30E 2. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the boundary of the works area at co-ordinates from (C) to (L). 3. The works will be carried out by one work boat, two crane barges, two roro barges and two derrick lighters. Three tugboats will provide assistance. The number of vessels engaged in the works will change from time to time to suit operational requirements. Vessels engaged in the works will display signals as prescribed in international and local regulations. 4. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 5. A working area of approximately 50 metres around the working vessels will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 6. Silt curtains which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed will be established within the works area. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 7. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are diving operations in the area. 8. A drawing showing the works area is attached to this Notice. This Notice supersedes Marine Department Notice No. 70/2026. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 11 June 2026 Action File Ref.: L/M No. 2/26 in MD-PD&PS-F01-075-01A-003-P073 MARINE DEPARTMENT NOTICE NO. 104/2026 (Marine Works) We are one in Promoting Excellence in Marine Services MARINE DEPARTMENT NOTICE NO. 104/2026 (Marine Works) Dredging Operations in Kwai Tsing Container Basin With immediate effect and for a period of approximately seven months, dredging operations will be carried out in the following works areas: Works Area 1: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (J): (A) 22-20.63N 114-07.26E (B) 22-20.25N 114-07.38E (C) 22-20.26N 114-07.41E (D) 22-20.16N 114-07.45E (E) 22-20.15N 114-07.42E (F) 22-19.59N 114-07.61E (G) 22-19.58N 114-07.55E (H) 22-19.52N 114-07.57E (I) 22-19.50N 114-07.49E (J) 22-20.59N 114-07.12E Works Area 2: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (K) to (N): (K) 22-20.55N 114-07.01E (L) 22-19.83N 114-07.25E (M) 22-19.79N 114-07.12E (N) 22-20.51N 114-06.87E 2. The works will be carried out by one grab dredger and one derrick lighter. Two tugboats and one hopper barge will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 50 metres around the dredger and lighter will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the dredger and lighter. 4. A silt curtain will be established beside the dredger and lighter. The silt curtain is a large piece of netting used to contain mud and sediments. Yellow flashing lights will be laid to mark the extent of the silt curtain. 5. The hours of work will be round-the-clock. Vessels navigating in the vicinity should proceed with caution. 6. A drawing showing the works areas is attached to this Notice. This Notice supersedes Marine Department Notice No. 243/2024. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 9 June 2026 Action File Ref.: L/M. No. 19/24 in MD-PD&PS-F01-075-01A-002-P021 MARINE DEPARTMENT NOTICE NO. 103/2026 (Marine Works) Oil Terminal Repair Works at Tolo Harbour With immediate effect and for a period of approximately eight months, oil terminal repair works will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D): (A) 22-27.01N 114-14.52E (B) 22-26.98N 114-14.57E (C) 22-26.96N 114-14.56E (D) 22-26.98N 114-14.50E 2. The works will be carried out by one dumb lighter. One tugboat and one work boat will provide assistance. The number of vessels engaged in the works will change from time to time to suit operational requirements. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. The hours of work will be from 0900 to 1700 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 4. A working area of approximately 50 metres around the lighter will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the lighter. 5. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are diving operations in the area. 6. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 9 June 2026 Action File Ref.: L/M No. 16/26 in MD-PD&PS-F01-075-01A-001A-P096 MARINE DEPARTMENT NOTICE NO. 98/2026 (Marine Works) Marine Works for Seawater Cooling Plant between Central Pier No. 3 and No. 4 With immediate effect and for a period of approximately six months, marine works for seawater cooling plant will be carried out within the works area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-17.26N 114-09.47E (B) 22-17.28N 114-09.47E (C) 22-17.28N 114-09.49E (D) 22-17.26N 114-09.48E 2. The works will be carried out by one work boat. Vessel engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 15 metres around the work boat will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the work boat. 4. The hours of work will be from 0900 to 1800 hours. No works will be carried out on Sundays and public holidays. Vessel employed for the works will not stay in the works area outside the hours of work. 5. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are diving operations in the area. 6. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 29 May 2026 Action File Ref.: L/M No. 8/26 in MD-PD&PS-F01-075-01A-002-P026 MARINE DEPARTMENT NOTICE NO. 95/2026 (Marine Works) Marine Works at Junk Bay With immediate effect and for a period of approximately six months, marine works involving establishment of silt curtain and installation of stoplogs will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-17.33N 114-16.22E (B) 22-17.34N 114-16.21E (C) 22-17.36N 114-16.22E (D) 22-17.36N 114-16.24E 2. The works will be carried out by one work boat. Vessel engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 10 metres around the work boat will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the work boat. 4. The hours of work will be from 0830 to 1700 hours. No works will be carried out on Sundays and public holidays. Vessel employed for the works will not stay in the works area outside the hours of work. 5. A silt curtain which is large piece of netting to contain mud and sediments extending from the sea surface to the seabed will be established within the works area. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtain. 6. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are diving operations in the area. 7. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 26 May 2026 Action File Ref.: L/M No. 13/26 in MD-PD&PS-F01-075-01A-001A-P095 MARINE DEPARTMENT NOTICE NO. 94/2026 (Marine Works) Unloading of Coal Ship Unloader at Lamma Power Station With immediate effect and for a period of approximately one month, unloading of coal ship unloader will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (G) and the adjacent jetty: (A) 22-12.80N 114-06.12E (B) 22-12.67N 114-06.14E (C) 22º 12.631’N 114º 06.115’E (D) 22-12.65N 114-05.80E (E) 22-12.72N 114-05.74E (F) 22-13.12N 114-05.74E (G) 22-13.12N 114-06.05E 2. The works will be carried out by one crane barge. One tugboat and two work boats will provide assistance. The number of vessels engaged in the works will change from time to time to suit operational requirements. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 150 metres around the crane barge will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the crane barge. 4. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 5. Vessels navigating in the vicinity should proceed with caution. 6. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 26 May 2026 Action File Ref.: L/M No. 14/26 in MD-PD&PS-F01-075-01A-001A-P095 MARINE DEPARTMENT NOTICE NO. 90/2026 (Marine Works) Marine Site Investigation at Kennedy Town With immediate effect and for a period of approximately three months, marine site investigation works involving drilling of boreholes will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-17.01N 114-07.51E (B) 22-17.07N 114-07.51E (C) 22-17.11N 114-07.68E (D) 22-17.07N 114-07.69E 2. The works will be carried out by one flat-top barge and three jack-up barges. Two tugboats will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 50 metres around the working vessels will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the flat- top barge. Yellow flashing lights will be installed at the four corners of each jack-up barge to indicate its position. 4. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 5. Vessels navigating in the vicinity should proceed with caution. 6. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 19 May 2026 Action File Ref.: L/M. No. 7/26 in MD-PD&PS-F01-075-01A-002-P026 MARINE DEPARTMENT NOTICE NO. 86/2026 (Marine Works) Repair Works at Yung Shue Wan Helipad With immediate effect and for a period of approximately seven months, repair works for the helipad will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-13.47N 114-06.51E (B) 22-13.50N 114-06.49E (C) 22-13.53N 114-06.53E (D) 22-13.49N 114-06.55E 2. The works will be carried out by one dumb lighter. One tugboat and one work boat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 4. A working area of approximately 20 metres around the lighter will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the lighter. 5. Silt curtains, which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed, will be established within the works area. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 6. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are diving operations in the area. 7. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 8 May 2026 Action File Ref.: L/M No. 12/26 in MD-PD&PS-F01-075-01A-001A-P094 MARINE DEPARTMENT NOTICE NO. 85/2026 (Navigational Warnings and Related Information) Typhoon Season Owners, agents and charterers are requested to remind their ship masters of the need to take precautionary measures during the approach of tropical cyclones. 2. Masters and persons in control of vessels should closely monitor the development of tropical cyclones for making early preparation. This includes carrying out thorough inspections on board to ensure that the engines, mooring gears and other safety equipment of vessels are in good working conditions. When safe and practicable, consideration should be given to arrange vessels to leave the berth in ample time and proceed outside Hong Kong waters for shelter from extreme weather associated with super typhoons. 3. Masters, owners, agents and persons in control of vessels are also reminded of their obligation to comply with any direction issued by the Director of Marine concerning the safe operation of vessels and the port, or in relation to any matter which the Director may give directions under the laws of Hong Kong. 4. When a tropical cyclone warning is issued by the Hong Kong Observatory, every vessel which is moored to the following government mooring buoys shall clear anchors and cables and prepares the main propulsion machinery to full power condition. Such vessel shall, if so directed by the Director, leave the mooring buoy- “A” mooring “B” mooring A17, A29, A35, B2, B4 A36, A38, A39, A43, A78 Other details of government mooring buoys are available on the Marine Department’s website. (https://www.mardep.gov.hk/en/public-services/port-services/moor/index.html) 5. The master of a ship moored to a government mooring buoy may, at his discretion, drop a bow anchor under foot to lessen the tendency to sheer. This should not impair the efficiency of the mooring, although an anchor should not be used during normal weather conditions. 6. Masters are reminded that every vessel within the waters of Hong Kong must maintain continuous listening watch on the VHF radio channel appropriate to the VHF sector in which the vessel is located, or another VHF channel as may be specified by the Vessel Traffic Centre (call sign “MARDEP”). The Centre will broadcast tropical cyclone information from time to time when tropical cyclone warning signals have been issued. Masters should also listen to local radio broadcasts for weather advisory information bulletins. 7. An inadequately manned vessel during the passage of a tropical cyclone not only places itself at risk but also endangers the port and other vessels. Masters, owners, agents, and charterers of vessels should therefore ensure that sufficient number of qualified crew capable of carrying out all duties to ensure the safety of ship having regard to the pertaining circumstances are on board at all times during the passage of a tropical cyclone. Further information on minimum safe manning levels on ships while in the waters of Hong Kong can be found in Marine Department’s website. (https://www.mardep.gov.hk/en/public-services/port-services/proc/index.html) 8. Coxswains, owners, agents and persons in control of local vessels are advised to take the precautionary measures contained in the Marine Department pamphlet entitled “Measures to Enhance the Safety of Local Vessels During Passage of Tropical Cyclones” well before a tropical cyclone is approaching Hong Kong. The pamphlet is available on the Marine Department’s website. (https://www.mardep.gov.hk/en/publication/materials/pdf/hps_cyclones.pdf) 9. This Notice supersedes Marine Department Notice No. 60 of 2025. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 6 May 2026 File Ref.: L/M No. 20/2026 in MD-VTC-F01-045-03A-001-P001 MARINE DEPARTMENT NOTICE NO. 81/2026 (Marine Works) Marine Site Investigation at Lung Kwu Sheung Tan With immediate effect and for a period of approximately eight months, marine site investigation works involving drilling of boreholes and cone penetration tests will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (E) and the adjacent shoreline: (A) 22-23.54N 113-54.98E (B) 22-23.40N 113-54.88E (C) 22-23.41N 113-54.34E (D) 22-23.59N 113-53.96E (E) 22-24.35N 113-54.09E 2. The works will be carried out by four jack-up barges, one flat-top barge and two dumb lighters. Two tugboats will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 50 metres around each barge and dumb lighter will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the flat-top barge and dumb lighters. Yellow flashing lights will be installed at the four corners of each jack-up barge to indicate its position. 4. The hours of work will be from 0700 to 2300 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 5. Vessels navigating in the vicinity should proceed with caution. 6. A drawing showing the works area is attached to this Notice. This Notice supersedes Marine Department Notice No. 22/2026. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 27 April 2026 Action File Ref.: L/M. No. 3/26 in MD-PD&PS-F01-075-01A-003-P073 MARINE DEPARTMENT NOTICE NO. 71/2026 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Withdrawal of Scientific Buoy “A01” in Central Waters NOTICE IS HEREBY GIVEN that with immediate effect, the scientific buoy has been withdrawn from Central Waters. The particulars of the buoy are as follows: Name : A01 Position (WGS 84 Datum) : 22-17.25N 114-04.88E Shape : Pillar Colour : Yellow Light Characteristics : Fl(5) Y.20s Top Mark : Yellow “X” Radar Reflector : Fitted Automatic Identification System: : Fitted 2. A drawing showing the position of the buoy is attached to this Notice. This Notice should be read in conjunction with Marine Department Notice No. 117/2025. This Notice supersedes Marine Department Notice No. 98/2024. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 17 April 2026 Action File Ref.: L/M No. 15/24 in MD-PD&PS-F01-075-01A-003-P056 MARINE DEPARTMENT NOTICE NO. 70/2026 (Marine Works) Seawall Modification Works at the South-east of the Hong Kong International Airport With immediate effect and for a period of approximately 24 months, seawall modification works will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (M) and the adjacent shoreline: (A) 22-18.80N 113-56.95E (B) 22-18.80N 113-56.83E (C) 22-18.71N 113-56.82E (D) 22-18.65N 113-56.55E (E) 22-18.55N 113-56.48E (F) 22-18.40N 113-56.49E (G) 22-18.18N 113-56.55E (H) 22-17.97N 113-56.41E (I) 22-17.92N 113-56.38E (J) 22-17.81N 113-56.35E (K) 22-17.80N 113-56.35E (L) 22-17.74N 113-56.37E (M) 22-17.69N 113-56.30E 2. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the boundary of the works area at co-ordinates from (C) to (L). 3. The works will be carried out by one work boat, one crane barge, one roro barge and two derrick lighters. Two tugboats will provide assistance. The number of vessels engaged in the works will change from time to time to suit operational requirements. Vessels engaged in the works will display signals as prescribed in international and local regulations. - 2 4. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 5. A working area of approximately 50 metres around the working vessels will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 6. Silt curtains which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed will be established within the works area. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 7. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are divers working in the area. 8. A drawing showing the works area is attached to this Notice. This Notice supersedes Marine Department Notice No. 17/2026. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 15 April 2026 Action File Ref.: L/M No. 2/26 in MD-PD&PS-F01-075-01A-003-P073 MARINE DEPARTMENT NOTICE NO. 69/2026 (Marine Works) Dredging Operations along Castle Peak Fairway With immediate effect and for a period of approximately seven months, dredging operations will be carried out in the following works areas: Works Area 1: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D): (A) 22-20.83N 113-56.51E (B) 22-20.70N 113-57.14E (C) 22-20.65N 113-57.13E (D) 22-20.78N 113-56.50E Works Area 2: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (E) to (N): (E) 22-20.95N 113-57.06E (F) 22-20.92N 113-57.14E (G) 22-20.84N 113-57.58E (H) 22-20.82N 113-57.76E (I) 22-20.82N 113-57.81E (J) 22-20.76N 113-57.81E (K) 22-20.81N 113-57.40E (L) 22-20.83N 113-57.28E (M) 22-20.87N 113-57.12E (N) 22-20.90N 113-57.04E 2. The works will be carried out by one crane barge. Two hopper barges and two tugboats will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 50 metres around the crane barge will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 4. A silt curtain, extending from the sea surface to the seabed, will be established beside the crane barge. The silt curtain is a large piece of netting used to contain mud and sediments. Yellow flashing lights will be laid to mark the extent of the silt curtain. 5. The hours of work will be round-the-clock. Vessels navigating in the vicinity should proceed with caution. 6. A drawing showing the works areas is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 15 April 2026 Action File Ref.: L/M. No.47/25 in MD-PD&PS-F01-075-01A-003-P072 MARINE DEPARTMENT NOTICE NO. 63/2026 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Relocation of Heavy-duty Mooring Buoy “AWTS 1” in Aberdeen West Typhoon Shelter NOTICE IS HEREBY GIVEN that the relocation works of the heavy-duty mooring buoy “AWTS 1” will take place in Aberdeen West Typhoon Shelter with effect from 9 April 2026. 2. The heavy-duty mooring buoy “AWTS 1” will be relocated from the existing location (WGS 84 Datum) (22-14.78N 114-08.75E) westward to the newly deployed location (WGS 84 Datum) (22-14.78N 114-08.74E) at Aberdeen West Typhoon Shelter. 3. The particulars of the heavy-duty mooring buoy “AWTS 1” are as follows: Name : AWTS 1 Position (WGS 84 Datum) : 22-14.78N 114-08.74E 4. Vessels navigating in the vicinity should proceed with caution and give a wide berth to the heavy-duty mooring buoy. 5. A drawing showing the position of the heavy-duty mooring buoy is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 1 April 2026 Action File Ref.: L/M. No. 7/26 in MD-PD&PS-F01-075-01A-001A-P093 MARINE DEPARTMENT NOTICE NO. 62/2026 (Marine Works) Temporary Establishment of Acoustic Monitors and Hydrophone Monitors for Dolphin Survey in the Western Waters of Hong Kong With immediate effect and for a period of approximately 10 months, acoustic monitors and hydrophone monitors will be temporarily established at the following locations (WGS 84 Datum): (A) 22-21.32N 113-53.64E (B) 22-19.73N 113-52.17E (C) 22-20.29N 113-53.90E (D) 22-20.65N 113-55.47E (E) 22-20.16N 113-57.83E (F) 22-18.55N 113-52.55E (G) 22-17.63N 113-52.75E (H) 22-17.40N 113-51.54E 2. The acoustic monitors will be laid at the co-ordinates from (A) to (G). The acoustic monitor is an instrument for collecting dolphin data. It will be fixed to a cubic metal frame of 0.5 metre by 0.5 metre by 0.5 metre on the seabed. The total height of the acoustic monitor and the metal frame above the seabed will be about 1 metre. 3. The hydrophone monitors will be laid at the co-ordinates from (F) to (H). The hydrophone monitor is an instrument for collecting dolphin data. It will be fixed to a concrete block anchor on the seabed. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the three hydrophone monitors. 4. Laying of the monitors will be carried out by a work boat and a working area of approximately 20 metres around the work boat will be established. One guard boat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 5. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will not stay in the works locations outside the hours of work. 6. Diving operations for retrieving data from the monitors will be carried out by the work boat in the above locations from time to time. Vessels navigating in the vicinity should proceed with caution and keep clear of the works locations at slow speed, bearing in mind that there are divers working in the locations, and the water depths above these acoustic monitors are reduced. 7. A drawing showing the locations of the monitors is attached to this Notice. This Notice supersedes Marine Department Notice No. 216/2024. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 1 April 2026 Action File Ref.: L/M. No. 35/24 in MD-PD&PS-F01-075-01A-003-P060 MARINE DEPARTMENT NOTICE NO. 61/2026 (Marine Works) Marine Site Investigation at Deep Bay With immediate effect and for a period of approximately 10 months, marine site investigation works involving drilling of boreholes will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (E): (A) 22-27.93N 113-58.82E (B) 22-28.01N 113-58.71E (C) 22-28.95N 113-57.63E (D) 22-29.10N 113-57.82E (E) 22-28.13N 113-58.90E 2. The works will be carried out by four jack-up barges. One tugboat and one work boat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 15 metres around each jack-up barge will be established. Yellow flashing lights will be installed at the four corners of each jack-up barge to indicate its position. 4. The hours of work will be from 0800 to 1800 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 5. Silt curtains, which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed, will be established at the works locations. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 6. Vessels navigating in the vicinity should proceed with caution. 7. A drawing showing the works area is attached to this Notice. This Notice supersedes Marine Department Notice No. 38/2026. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 30 March 2026 Action File Ref.: L/M. No. 45/25 in MD-PD&PS-F01-075-01A-003-P072 MARINE DEPARTMENT NOTICE NO. 60/2026 (Marine Works) Demolition and Disposal of Coal Ship Unloaders at Castle Peak Power Station, Tap Shek Kok With immediate effect and for a period of approximately one month, demolition and disposal of coal ship unloaders will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (E) and the adjacent jetty: (A) 22-22.21N 113-55.07E (B) 22-22.05N 113-54.89E (C) 22-22.25N 113-54.57E (D) 22-22.46N 113-54.79E (E) 22-22.36N 113-54.90E 2. The works will be carried out by one crane barge and one dry cargo vessel. One anchor boat, two tugboats and three guard boats will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 150 metres around the carne barge will be established. Yellow marker buoys fitted with yellow flashing lights and radar reflectors will be laid to mark the positions of the anchors extending from the working vessels. 4. The hours of work will be round-the-clock. Vessels navigating in the vicinity should proceed with caution. 5. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 30 March 2026 Action File Ref.: L/M No. 6/26 in MD-PD&PS-F01-075-01A-003-P074 MARINE DEPARTMENT NOTICE NO. 55/2026 (Marine Works) Marine Works between Chek Lap Kok and Tung Chung With immediate effect and for a period of approximately 17 months, marine works involving marine bored piling works will be carried out in the following works areas: Works Area 1: This area is bounded by straight lines joining the following coordinates (WGS 84 Datum) from (A) to (F) and the adjacent shoreline: (A) 22-17.64N 113-56.25E (B) 22-17.62N 113-56.27E (C) 22-17.60N 113-56.28E (D) 22-17.56N 113-56.23E (E) 22-17.58N 113-56.21E (F) 22-17.59N 113-56.20E Works Area 2: This area is bounded by straight lines joining the following coordinates (WGS 84 Datum) from (G) to (L) and the adjacent shoreline: (G) 22-17.52N 113-56.28E (H) 22-17.54N 113-56.27E (I) 22-17.55N 113-56.24E (J) 22-17.59N 113-56.29E (K) 22-17.57N 113-56.31E (L) 22-17.55N 113-56.32E 2. The works will be carried out by two crane barges, two flat-top barges and one work boat. Two tugboats will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 50 metres around the working vessels will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 4. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay at the works areas outside the hours of work. 5 Silt curtains, which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed will be established within the works areas. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 6. Vessels navigating in the vicinity should proceed with caution. 7. A drawing showing the works areas is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 23 March 2026 Action File Ref.: L/M. No. 5/26 in MD-PD&PS-F01-075-01A-003-P073 MARINE DEPARTMENT NOTICE NO. 53/2026 (Marine Works) Installation of Eco-shoreline Features at Sai Ying Pun With immediate effect and for a period of approximately 10 months, marine works involving installation of eco-shoreline features will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-17.39N 114-08.23E (B) 22-17.43N 114-08.22E (C) 22-17.45N 114-08.32E (D) 22-17.42N 114-08.33E 2. The works will be carried out by one derrick lighter and one crane boat. One tugboat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 50 metres around the working vessels will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 4. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 5. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are divers working in the area. 6. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 17 March 2026 Action File Ref.: L/M No. 1/26 in MD-PD&PS-F01-075-01A-002-P025 MARINE DEPARTMENT NOTICE NO. 52/2026 (Marine Works) Coastal Enhancement Works at Tseung Kwan O With immediate effect and for a period of approximately 10 months, coastal enhancement works involving the construction of flood walls will be carried out within the following works areas: Works Area 1: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-18.08N 114-15.56E (B) 22-18.02N 114-15.56E (C) 22-18.02N 114-15.43E (D) 22-18.08N 114-15.43E Works Area 2: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (E) to (H) and the adjacent shoreline: (E) 22-18.08N 114-15.66E (F) 22-18.02N 114-15.66E (G) 22-18.02N 114-15.60E (H) 22-18.11N 114-15.60E Works Area 3: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (I) to (N) and the adjacent shoreline: (I) 22-18.09N 114-15.78E (J) 22-18.06N 114-15.79E (K) 22-18.05N 114-15.76E (L) 22-18.02N 114-15.76E (M) 22-18.02N 114-15.70E (N) 22-18.08N 114-15.70E Works Area 4: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (O) to (T) and the adjacent shoreline: (O) 22-17.90N 114-15.84E (P) 22-17.89N 114-15.81E (Q) 22-17.99N 114-15.80E (R) 22-18.01N 114-15.80E (S) 22-18.04N 114-15.81E (T) 22-18.03N 114-15.84E Works Area 5: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (U) to (X) and the adjacent shoreline: (U) 22-17.62N 114-16.00E (V) 22-17.62N 114-15.97E (W) 22-17.72N 114-15.97E (X) 22-17.72N 114-16.00E 2. The works will be carried out by two special purpose vessels. One tugboat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works areas outside the hours of work. 4. A working area of approximately 50 metres around the special purpose vessels will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the special purpose vessels. 5. Silt curtains, which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed, will be established within the works areas. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 6. Vessels navigating in the vicinity should proceed with caution. 7. A drawing showing the works areas is attached to this Notice. This Notice supersedes Marine Department Notice No. 139/2025. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 17 March 2026 Action File Ref.: L/M No. 28/25 in MD-PD&PS-F01-075-01A-001A-P082 MARINE DEPARTMENT NOTICE NO. 41/2026 (Marine Works) Improvement Works at Yung Shue O Jetty With immediate effect and for a period of approximately 21 months, improvement works for the jetty will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (F) and the adjacent shoreline: (A) 22-25.17N 114-16.65E (B) 22-25.18N 114-16.62E (C) 22-25.21N 114-16.64E (D) 22-25.20N 114-16.65E (E) 22-25.23N 114-16.67E (F) 22-25.20N 114-16.72E 2. The works will be carried out by two dumb lighters and one pilling barge. One roro barge, one tugboat and one work boat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 4. A working area of approximately 20 metres around the working vessels will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 5. Silt curtains, which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed, will be established within the works area. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 6. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are divers working in the area. 7. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 4 March 2026 Action File Ref.: L/M No. 2/26 in MD-PD&PS-F01-075-01A-001A-P091 MARINE DEPARTMENT NOTICE NO. 38/2026 (Marine Works) Marine Site Investigation at Deep Bay With immediate effect and for a period of approximately 11 months, marine site investigation works involving drilling of boreholes will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (E): (A) 22-27.93N 113-58.82E (B) 22-28.01N 113-58.71E (C) 22-28.95N 113-57.63E (D) 22-29.10N 113-57.82E (E) 22-28.13N 113-58.90E 2. The works will be carried out by three jack-up barges. One tugboat and one work boat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 15 metres around each jack-up barge will be established. Yellow flashing lights will be installed at the four corners of each jack-up barge to indicate its position. 4. The hours of work will be from 0800 to 1800 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 5. Silt curtains, which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed, will be established at the works locations. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 6. Vessels navigating in the vicinity should proceed with caution. 7. A drawing showing the works area is attached to this Notice. This Notice supersedes Marine Department Notice No. 265/2025. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 2 March 2026 Action File Ref.: L/M. No. 45/25 in MD-PD&PS-F01-075-01A-003-P072 MARINE DEPARTMENT NOTICE NO. 32/2026 (Marine Works) Marine Site Investigation off Aberdeen South Typhoon Shelter With immediate effect and for a period of approximately four months, marine site investigation works involving sampling of subsea soil and drilling of vibrocores will be carried out at the following locations (WGS 84 Datum): (A) 22-13.99N 114-09.92E (B) 22-13.95N 114-09.92E (C) 22-13.94N 114-09.97E (D) 22-14.00N 114-09.85E (E) 22-13.95N 114-09.85E (F) 22-13.92N 114-09.87E (G) 22-14.00N 114-09.82E (H) 22-13.95N 114-09.78E (I) 22-13.89N 114-09.83E (J) 22-13.94N 114-09.73E (K) 22-13.90N 114-09.72E (L) 22-13.89N 114-09.75E 2. The works will be carried out by two flat-top barges. One tugboat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 80 metres around each flat-top barge will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the flat-top barges. 4. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works locations outside the hours of work. 5. Vessels navigating in the vicinity should proceed with caution. 6. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 16 February 2026 Action File Ref.: L/M. No. 54/25 in MD-PD&PS-F01-075-01A-001A-P090 MARINE DEPARTMENT NOTICE NO. 22/2026 (Marine Works) Marine Site Investigation at Lung Kwu Sheung Tan With immediate effect and for a period of approximately 10 months, marine site investigation works involving drilling of boreholes and cone penetration tests will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (E) and the adjacent shoreline: (A) 22-23.54N 113-54.98E (B) 22-23.40N 113-54.88E (C) 22-23.41N 113-54.34E (D) 22-23.59N 113-53.96E (E) 22-24.35N 113-54.09E 2. The works will be carried out by four jack-up barges, one flat-top barge and two dumb lighters. Two tugboats will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 50 metres around each barge and dumb lighter will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the flat-top barge and dumb lighters. Yellow flashing lights will be installed at the four corners of each jack-up barge to indicate its position. 4. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 5. Vessels navigating in the vicinity should proceed with caution. 6. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 4 February 2026 Action File Ref.: L/M. No. 3/26 in MD-PD&PS-F01-075-01A-003-P073 MARINE DEPARTMENT NOTICE NO. 17/2026 (Marine Works) Seawall Modification Works at the South-east of the Hong Kong International Airport With immediate effect and for a period of approximately 26 months, seawall modification works will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (M) and the adjacent shoreline: (A) 22-18.80N 113-56.95E (B) 22-18.80N 113-56.83E (C) 22-18.71N 113-56.82E (D) 22-18.65N 113-56.55E (E) 22-18.55N 113-56.48E (F) 22-18.40N 113-56.49E (G) 22-18.18N 113-56.55E (H) 22-17.97N 113-56.41E (I) 22-17.92N 113-56.38E (J) 22-17.81N 113-56.35E (K) 22-17.80N 113-56.35E (L) 22-17.74N 113-56.37E (M) 22-17.69N 113-56.30E 2. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the boundary of the works area at co-ordinates from (C) to (L). 3. The works will be carried out by one work boat, one derrick lighter, one crane barge and one roro barge. Two tugboats will provide assistance. The number of vessels engaged in the works will change from time to time to suit operational requirements. Vessels engaged in the works will display signals as prescribed in international and local regulations. 4. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 5. A working area of approximately 50 metres around the working vessels will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 6. Silt curtains which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed will be established within the works area. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 7. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are divers working in the area. 8. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 29 January 2026 Action File Ref.: L/M No. 2/26 in MD-PD&PS-F01-075-01A-003-P073 MARINE DEPARTMENT NOTICE NO. 14/2026 (Marine Works) Installation of Submarine Cable Landing Ducts at Chung Hom Kok With immediate effect and for a period of approximately 18 months, installation works of submarine cable landing ducts at Chung Hom Kok will be carried out within the area bounded by straight lines joining the following co- ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-12.77N 114-12.26E (B) 22-12.69N 114-12.23E (C) 22-12.72N 114-12.18E (D) 22-12.77N 114-12.24E 2. The works will be carried out by two dumb lighters. Two tugboats will provide assistance. The number of vessels engaged in the works will change from time to time to suit operational requirements. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. The hours of work will be from 0800 to 1800 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 4. A working area of approximately 20 metres around the lighters will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the lighters. 5. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are divers working in the area. 6. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 27 January 2026 Action File Ref.: L/M No. 51/25 in MD-PD&PS-F01-075-01A-001A-P089 MARINE DEPARTMENT NOTICE NO. 13/2026 (Marine Works) Improvement Works at Ma Nam Wat Pier With immediate effect and for a period of approximately 17 months, improvement works for the public pier will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (H) and the adjacent shoreline: (A) 22-21.42N 114-16.29E (B) 22-21.42N 114-16.27E (C) 22-21.41N 114-16.27E (D) 22-21.40N 114-16.23E (E) 22-21.46N 114-16.23E (F) 22-21.47N 114-16.27E (G) 22-21.44N 114-16.30E (H) 22-21.43N 114-16.29E 2. The works will be carried out by one dumb lighter, one pilling barge and one roro barge. One tugboat and one work boat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 4. A working area of approximately 20 metres around the working vessels will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 5. Silt curtains, which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed will be established within the works area. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 6. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are divers working in the area. 7. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 26 January 2026 Action File Ref.: L/M No. 52/25 in MD-PD&PS-F01-075-01A-001A-P090 MARINE DEPARTMENT NOTICE NO. 7/2026 (Marine Works) Fender Replacement Works at Peng Chau Transfer Facility With immediate effect and for a period of approximately four months, fender replacement works will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (E) and the adjacent shoreline: (A) 22-17.41N 114-01.98E (B) 22-17.40N 114-01.97E (C) 22-17.42N 114-01.95E (D) 22-17.43N 114-01.97E (E) 22-17.43N 114-01.98E 2. The works will be carried out by one crane boat. Vessel engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 20 metres around the crane boat will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the crane boat. 4. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessel employed for the works will not stay in the works area outside the hours of work. 5. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are divers working in the area. 6. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 9 January 2026 Action File Ref.: L/M No. 48/25 in MD-PD&PS-F01-075-01A-003-P072 MARINE DEPARTMENT NOTICE NO. 2/2026 (Marine Works) Marine Site Investigation at Cheung Sha, Lantau Island With immediate effect and for a period of approximately three months, marine site investigation works involving drilling of boreholes will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-14.37N 113-58.30E (B) 22-14.21N 113-58.37E (C) 22-13.78N 113-57.88E (D) 22-13.98N 113-57.75E 2. The works will be carried out by three jack-up barges. Two tugboats will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 50 metres around each jack-up barge will be established. Yellow flashing lights will be installed at the four corners of each jack-up barge to indicate its position. 4. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 5. Vessels navigating in the vicinity should proceed with caution. 6. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 2 January 2026 Action File Ref.: L/M. No. 44/25 in MD-PD&PS-F01-075-01A-003-P071 MARINE DEPARTMENT NOTICE NO. 266/2025 (Navigation Warnings & Related Information) Drone Operations at Tolo Harbour With immediate effect and for a period of approximately twelve months, low altitude drone operations will be conducted over the waters of Tolo Harbour. 2. The operating area covers the waters of Tolo Harbour west of a straight line joining the following co-ordinates (WGS 84 Datum) from (A) to (B) and the adjacent shoreline: Latitude Longitude (A) 22-26.99N 114-14.81E (B) 22-26.17N 114-14.84E 3. During the aforementioned period, Masters, coxswains and persons-in- charge of all vessels navigating in the vicinity should be aware of the said operations and navigate with caution. 4. A drawing showing the operating area is attached to this Notice. This Notice supersedes Marine Department Notice No. 86/2025. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 29 December 2025 Action File Ref.: L/M. No. 437/25 in MD-HPS-F01-015-04B-002 MARINE DEPARTMENT NOTICE NO. 265/2025 (Marine Works) Marine Site Investigation at Deep Bay With immediate effect and for a period of approximately three months, marine site investigation works involving drilling of boreholes will be carried out at the following locations (WGS 84 Datum): (A) 22-29.02N 113-57.74E (B) 22-28.68N 113-58.06E (C) 22-28.49N 113-58.33E 2. The works will be carried out by three jack-up barges. One tugboat and one work boat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 15 metres around each jack-up barge will be established. Yellow flashing lights will be installed at the four corners of each jack-up barge to indicate its position. 4. The hours of work will be from 0800 to 1800 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works locations outside the hours of work. 5. Silt curtains, which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed, will be established at the works locations. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 6. Vessels navigating in the vicinity should proceed with caution. 7. A drawing showing the works locations is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 24 December 2025 Action File Ref.: L/M. No. 45/25 in MD-PD&PS-F01-075-01A-003-P072 MARINE DEPARTMENT NOTICE NO. 262/2025 (Marine Works) Marine Works to the Southwest of Shek Kwu Chau for the Integrated Waste Management Facilities With immediate effect and for a period of approximately 12 months, marine works involving hydrographic survey, and construction of seawall and breakwater will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (I) and the adjacent shoreline: (A) 22-11.33N 113-59.46E (B) 22-11.15N 113-59.47E (C) 22-11.14N 113-59.29E (D) 22-11.24N 113-58.83E (E) 22-11.37N 113-58.74E (F) 22-11.49N 113-58.71E (G) 22-11.60N 113-58.76E (H) 22-11.66N 113-58.82E (I) 22-11.66N 113-58.94E 2. The works will be carried out by a flotilla of vessels including flat top barges, derrick lighters, and special purpose vessels at various stages. Some tugboats, guard boats and self-propelled delivery barges will provide assistance. The number of vessels engaged in the works will change from time to time to suit operational requirements. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. The hours of work will be round-the-clock. A working area of approximately 50 metres around each working vessel will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 4. Silt curtains, which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed, will be established within the works area. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 5. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are divers working in the area. 6. A drawing showing the works area is attached to this Notice. This Notice is an extension of Marine Department Notice No. 3/2024. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 22 December 2025 Action File Ref.: L/M No. 1/20 in MD-PD&PS-F01-075-01A-003-P010 MARINE DEPARTMENT NOTICE NO. 261/2025 (Marine Works) Capping of Mud Pits North of the Hong Kong International Airport With immediate effect and for a period of approximately 60 months, marine works involving capping of mud pits and trimming works will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (H): (A) 22-20.71N 113-55.84E (B) 22-20.48N 113-56.84E (C) 22-20.03N 113-56.74E (D) 22-20.03N 113-56.40E (E) 22-20.23N 113-55.95E (F) 22-20.52N 113-55.84E (G) 22-20.30N 113-55.12E (H) 22-20.46N 113-55.08E 2. The works will be carried out by one dredger and one hopper barge. One tugboat, one guard boat and one survey boat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. The hours of work will be round-the-clock. A working area of approximately 50 metres around the working vessels will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 4. Vessels navigating in the vicinity should proceed with caution. 5. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 22 December 2025 Action File Ref.: L/M No. 46/25 in MD-PD&PS-F01-075-01A-003-P072 MARINE DEPARTMENT NOTICE NO. 256/2025 (Marine Works) Reconstruction Works for Piers at Ma Wan Chung and Yi O With immediate effect and for a period of approximately 11 months, reconstruction works for piers at Ma Wan Chung and Yi O will be carried out in the following works areas: Works Area 1: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (K) and the adjacent shoreline: (A) 22-17.14N 113-56.12E (B) 22-17.11N 113-56.11E (C) 22-17.09N 113-56.04E (D) 22-17.16N 113-55.99E (E) 22-17.17N 113-56.03E (F) 22-17.13N 113-56.06E (G) 22-17.13N 113-56.06E (H) 22-17.14N 113-56.09E (I) 22-17.14N 113-56.10E (J) 22-17.14N 113-56.11E (K) 22-17.14N 113-56.11E Works Area 2: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (L) to (Q): (L) 22-14.37N 113-51.03E (M) 22-14.31N 113-51.14E (N) 22-14.23N 113-51.14E (O) 22-14.18N 113-51.16E (P) 22-14.14N 113-51.09E (Q) 22-14.23N 113-50.94E 2. The works will be carried out by five jack-up barges and two dumb lighters. One tug and one launch will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 50 metres around each working vessel will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from each lighter. Yellow flashing lights will be installed at the four corners of each jack-up barge to indicate its position. 4. Silt curtains which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed will be established within the works areas. Yellow flashing lights will be laid to mark the extent of the silt curtains. 5. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works areas outside the hours of work. 6. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works areas at slow speed, bearing in mind that there are divers working in the areas. 7. Drawings showing the works areas are attached to this Notice. This Notice is an extension of Marine Department Notice No. 63/2025. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 16 December 2025 Action File Ref.: L/M. No. 36/22 in MD-PD&PS-F01-075-01A-003-P036 MARINE DEPARTMENT NOTICE NO. 246/2025 (Marine Works) Installation of Eco-shoreline Features at Peng Chau With immediate effect and for a period of approximately 13 months, marine works involving installation of eco-shoreline features will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (E) and the adjacent shoreline: (A) 22-16.86N 114-02.29E (B) 22-16.84N 114-02.28E (C) 22-16.87N 114-02.24E (D) 22-16.91N 114-02.22E (E) 22-16.92N 114-02.25E 2. The works will be carried out by one derrick lighter. One tugboat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 50 metres around the derrick lighter will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 4. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 5. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are divers working in the area. 6. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 26 November 2025 Action File Ref.: L/M No. 35/25 in MD-PD&PS-F01-075-01A-003-P070 MARINE DEPARTMENT NOTICE NO. 245/2025 (Marine Works) Fender Replacement Works at Cheung Chau Transfer Facility With immediate effect and for a period of approximately two months, fender replacement works will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-13.12N 114-01.53E (B) 22-13.12N 114-01.51E (C) 22-13.15N 114-01.51E (D) 22-13.15N 114-01.52E 2. The works will be carried out by one crane boat. One work boat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 20 metres around the crane boat will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 4. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will not stay in the works area outside the hours of work. 5. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are divers working in the area. 6. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 26 November 2025 Action File Ref.: L/M No. 29/25 in MD-PD&PS-F01-075-01A-003-P068 MARINE DEPARTMENT NOTICE NO. 241/2025 (Navigation Warnings & Related Information) Drone Operations at the waters of Deep Bay With immediate effect and for a period of approximately three months, low altitude drone operations will be conducted over the waters of Deep Bay. 2. The operating area at the waters of Deep Bay is formed with straight line joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: Latitude Longitude (A) 22-28.01N 113-58.86E (B) 22-28.92N 113-57.77E (C) 22-29.26N 113-58.16E (D) 22-28.34N 113-59.10E 3. During the aforementioned period, Masters, coxswains and persons-in- charge of all vessels navigating in the vicinity should be aware of the said operations and navigate with caution. 4. A drawing showing the operating area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 20 November 2025 Action File Ref.: L/M. No. 1286/25 in MD-HPS-F01-015-04B-002 MARINE DEPARTMENT NOTICE NO. 240/2025 (Marine Works) Reinstatement Works off Cha Kwo Ling With immediate effect and for a period of approximately 12 months, reinstatement works involving seabed and seawall will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-18.11N 114-13.60E (B) 22-18.06N 114-13.57E (C) 22-18.12N 114-13.44E (D) 22-18.18N 114-13.48E 2. The works will be carried out by one flat-top work barge and one dumb lighter. One tugboat and one workboat will provide assistance. The number of vessels engaged in the works will change from time to time to suit operational requirements. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. The hours of work will be round-the-clock. A working area of approximately 20 metres around the lighter and the barge will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the lighter and the barge. 4. Silt curtains which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed will be established within the works area. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 5. Diving Operations will be carried out from time to time during the hours of works. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are divers working in the area. 6. A drawing showing the works area is attached to this Notice. This Notice is an extension of Marine Department Notice No. 10/2025. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 20 November 2025 Action File Ref.: L/M No. 25/23 in MD-PD&PS-F01-075-01A-001A-P048 MARINE DEPARTMENT NOTICE NO. 227/2025 (Marine Works) Marine Works at Nim Wan, Deep Bay With immediate effect and for a period of approximately 14 months, marine works involving dredging operations and drilling of boreholes will be carried out within the area bounded by straight lines joining the following co- ordinates (WGS 84 Datum) from (A) to (P) and the adjacent shorelines: (A) 22-25.23N 113-54.82E (B) 22-25.30N 113-54.82E (C) 22-25.35N 113-54.77E (D) 22-25.41N 113-55.09E (E) 22-25.48N 113-55.37E (F) 22-25.48N 113-55.57E (G) 22-25.56N 113-55.82E (H) 22-25.55N 113-55.95E (I) 22-25.61N 113-56.11E (J) 22-25.68N 113-56.09E (K) 22-25.71N 113-56.18E (L) 22-25.59N 113-56.22E (M) 22-25.46N 113-55.81E (N) 22-25.47N 113-55.81E (O) 22-25.42N 113-55.59E (P) 22-25.41N 113-55.59E 2. The works will be carried out by two jack-up barges, two dumb lighters and one flat-top barge. Two tugboats, one hopper barge and one work boat will provide assistance. The number of vessels engaged in the works will change from time to time to suit operational requirements. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 30 metres will be established around each barge and lighter. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from each flat-top barge and lighter. Yellow flashing lights will be installed at the four corners of each jack-up barge to indicate its position. 4. Silt curtains, which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed, will be established within the works area. Yellow flashing lights will be laid to mark the extent of the silt curtains. 5. The hours of work will be from 0700 to 2300 hours daily. Vessels employed for the works will stay in the works area outside the hours of work. 6. Vessels navigating in the vicinity should proceed with caution. 7. A drawing showing the works area is attached to this Notice. This Notice supersedes Marine Department Notice No. 89/2025. This Notice should be read in conjunction with Marine Department Notice No. 137/2024. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 5 November 2025 Action File Ref.: L/M. No.12/25 in MD-PD&PS-F01-075-01A-003-P065 MARINE DEPARTMENT NOTICE NO. 203/2025 (Marine Works) Marine Site Investigation at Lung Kwu Tan With immediate effect and for a period of approximately five months, marine site investigation works involving drilling of vibrocores will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-22.81N 113-55.18E (B) 22-23.47N 113-54.33E (C) 22-23.70N 113-54.57E (D) 22-23.16N 113-55.25E 2. The works will be carried out by one flat-top barge. Two tugboats will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 50 metres around the flat-top barge will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 4. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 5. Vessels navigating in the vicinity should proceed with caution. 6. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 13 October 2025 Action File Ref.: L/M. No. 31/25 in MD-PD&PS-F01-075-01A-003-P069 MARINE DEPARTMENT NOTICE NO. 195/2025 (Marine Works) Mooring System Replacement Works at SkyPier Terminal With immediate effect and for a period of approximately six months, mooring system replacement works will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-19.11N 113-56.70E (B) 22-19.10N 113-56.71E (C) 22-19.02N 113-56.69E (D) 22-19.00N 113-56.63E 2. The works will be carried out by one dumb lighter. Two work boats and two tugboats will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 20 metres around the dumb lighter will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 4. The hours of work will be from 2200 hours to 0700 hours of the next day daily. Vessels employed for the works will not stay in the works area outside the hours of work. 5. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are divers working in the area. 6. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 2 October 2025 Action File Ref.: L/M No. 32/25 in MD-PD&PS-F01-075-01A-003-P069 MARINE DEPARTMENT NOTICE NO. 170/2025 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairway, Anchorages & Other Port Facilities) Enhancement Measures for the Existing Designation of Different Berthing Areas for Different Classes of Vessels in the Aberdeen West Typhoon Shelter NOTICE IS HEREBY GIVEN that the enhancement measure for the existing designation of different berthing areas for different classes of vessels in the Aberdeen West Typhoon Shelter will be implemented on a long-term basis, with immediate effect. 2. The berthing area at the entrance of the typhoon shelter to the southwest of Aberdeen Fisheries and Marine Offices (referred to as “Area A”) will be expanded by 0.5 hectares. While the berthing area to the southeast of Aberdeen Fisheries and Marine Offices (referred to as “Area B”) and berthing area to the west of Tai Wong Kung Temple, Ap Lei Chau (referred as “Area C”) will remain unchanged. Area A: This area is bounded by straight lines joining the following coordinates (WGS 84 Datum) from (A) to (H): (A) 22-14.84N 114-08.90E (B) 22-14.80N 114-08.90E (C) 22-14.75N 114-08.72E (D) 22-14.77N 114-08.72E (E) 22-14.78N 114-08.73E (F) 22-14.80N 114-08.73E (G) 22-14.82N 114-08.87E (H) 22-14.84N 114-08.87E Area B: This area is bounded by straight lines joining the following coordinates (WGS 84 Datum) from (I) to (N): (I) 22-14.86N 114-09.00E (J) 22-14.85N 114-09.02E (K) 22-14.82N 114-09.01E (L) 22-14.82N 114-09.00E (M) 22-14.80N 114-08.92E (N) 22-14.85N 114-08.93E Area C: This area is bounded by straight lines joining the following coordinates (WGS 84 Datum) from (O) to (R): (O) 22-14.78N 114-08.90E (P) 22-14.76N 114-08.90E (Q) 22-14.72N 114-08.84E (R) 22-14.74N 114-08.76E 3. A drawing showing the designation of different berthing areas A, B and C is attached to this Notice. This Notice supersedes Marine Department Notice No.102/2023. Ms. Lydia LAM Director of Marine (Acting) Marine Department Government of the HKSAR Date: 1 September 2025 Action File Ref.: L/M. No. 32/25 in MD-PD&PS-F01-075-01A-001A-P083 MARINE DEPARTMENT NOTICE NO. 160/2025 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Relocation of Scientific Buoy “EPD-4” in Southeast Lamma Waters NOTICE IS HEREBY GIVEN that the relocation works of the scientific buoy “EPD-4” will take place in Southeast Lamma waters with effect from 22 August 2025. 2. The scientific buoy “EPD-4” will be relocated from the existing location (WGS 84 Datum) (22-11.50N 114-09.62E) northwestward to the newly deployed location (WGS 84 Datum) (22-11.93N 114-09.36E) at Tung O Wan. 3. The particulars of the scientific buoy “EPD-4” are as follows: Name : EPD-4 Position (WGS 84 Datum) : 22-11.93N 114-09.36E Shape : Pillar Colour : Yellow Light Characteristics : Fl(5) Y.20s Top Mark : Yellow “X” Radar Reflector : Fitted Automatic Identification System : Fitted 4. Vessels navigating in the vicinity should proceed with caution and give a wide berth to the scientific buoy. 5. A drawing showing the position of the scientific buoy is attached to this Notice. This Notice supersedes Marine Department Notice No.47/2024. Ms. Lydia LAM Director of Marine (Acting) Marine Department Government of the HKSAR Date: 20 August 2025 Action File Ref.: L/M. No. 35/25 in MD-PD&PS-F01-075-01A-001A-P084 MARINE DEPARTMENT NOTICE NO. 159/2025 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment of Marker Buoys Demarcating the Wong Chuk Kok Hoi and Mirs Bay Fish Culture Zones NOTICE IS HEREBY GIVEN that 12 marker buoys will be established to demarcate the Wong Chuk Kok Hoi and Mirs Bay Fish Culture Zones (FCZs) with effect from 22 Aug 2025. 2. The marker buoys will be laid at the following co-ordinates (WGS 84 Datum): Wong Chuk Kok Hoi Fish Culture Zone: Name : WCKH1 Co-ordinate : 22-30.54N 114-18.93E Name : WCKH2 Co-ordinate : 22-30.64N 114-19.36E Name : WCKH3 Co-ordinate : 22-30.41N 114-19.43E Name : WCKH4 Co-ordinate : 22-30.30N 114-18.99E Mirs Bay Fish Culture Zone: Name : MB(N)1 Co-ordinate : 22-28.66N 114-22.65E Name : MB(N)2 Co-ordinate : 22-28.36N 114-23.15E Name : MB(N)3 Co-ordinate : 22-27.90N 114-22.84E Name : MB(N)4 Co-ordinate : 22-28.20N 114-22.34E Name : MB(S)1 Co-ordinate : 22-27.27N 114-22.25E Name : MB(S)2 Co-ordinate : 22-27.27N 114-23.46E Name : MB(S)3 Co-ordinate : 22-26.48N 114-23.46E Name : MB(S)4 Co-ordinate : 22-26.48N 114-22.24E 3. All the above-mentioned marker buoys share the same characteristics as follows: Shape : Pillar Colour : Yellow Light characteristics : Q.Y. Top Mark : Yellow “X” Radar Reflector : Fitted 4. Vessels navigating in the vicinity should proceed with caution and give a wide berth to the buoys. 5. A drawing showing the Wong Chuk Kok Hoi and Mirs Bay FCZs and the positions of the marker buoys is attached to this Notice. This Notice should be read in conjunction with Marine Department Notice No. 206/2023. Ms. Lydia LAM Director of Marine (Acting) Marine Department Government of the HKSAR Date: 20 August 2025 Action File Ref.: L/M No. 39/25 in MD-PD&PS-F01-075-01A-001A-P085 MARINE DEPARTMENT NOTICE NO. 144/2025 (Marine Works) Construction Works for Wave Wall at Sai Wan, Cheung Chau With immediate effect and for a period of approximately 20 months, construction works for wave wall at Sai Wan, Cheung Chau will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (E) and the adjacent shoreline: (A) 22-12.08N 114-01.27E (B) 22-12.09N 114-01.25E (C) 22-12.30N 114-01.34E (D) 22-12.34N 114-01.39E (E) 22-12.32N 114-01.41E 2. The works will be carried out by one dumb lighter and one ro-ro barge. One work boat and one tugboat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 15 metres around the working vessels will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 4. Silt curtains which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed, will be established within the works area. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 5. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 6. Vessels navigating in the vicinity should proceed with caution. 7. A drawing showing the works area is attached to this Notice. Ms. Lydia LAM Director of Marine (Acting) Marine Department Government of the HKSAR Date: 23 July 2025 Action File Ref.: L/M No. 24/25 in MD-PD&PS-F01-075-01A-003-P068 MARINE DEPARTMENT NOTICE NO. 142/2025 (Marine Works) Temporary Loading and Unloading Facility at Cha Kwo Ling NOTICE IS HEREBY GIVEN that temporary loading and unloading facility has been established at Cha Kwo Ling. The temporary loading and unloading facility will operate for a period of approximately six months. 2. One dumb lighter and one tug will berth at the facility within the operation area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline for loading and unloading operation: (A) 22-18.20N 114-13.46E (B) 22-18.17N 114-13.42E (C) 22-18.20N 114-13.39E (D) 22-18.23N 114-13.43E 3. The hours of operation will be from 0700 hours to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the operation will not stay in the operation area outside the hours of work. 4. A drawing showing the works area is attached to this Notice. This Notice is an extension of Marine Department Notice No. 226/2024. Ms. Lydia LAM Director of Marine (Acting) Marine Department Government of the HKSAR Date: 17 July 2025 Action File Ref.: L/M No. 39/23 in MD-PD&PS-F01-075-01A-001A-P053 不宜作航行用途 NOT TO BE USED FOR NAVIGATION C B A D 作業區 Operation Area MARINE DEPARTMENT NOTICE NO. 138/2025 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Withdrawal of Scientific Buoy “KYC-A” from the East of Sunshine Island NOTICE IS HEREBY GIVEN that with immediate effect, the scientific buoy has been withdrawn from the east of Sunshine Island. The particulars of the buoy are as follows: Name : KYC-A Position (WGS 84 Datum) : 22-15.92N 114-03.85E Shape : Pillar Colour : Yellow Light Characteristics : Fl(5) Y.20s Top Mark : Yellow “X” Radar Reflector : Fitted 2. A drawing showing the position of the buoy is attached to this Notice. This Notice supersedes Marine Department Notice No. 130/2025. Ms. Lydia LAM Director of Marine (Acting) Marine Department Government of the HKSAR Date: 14 July 2025 Action File Ref.: L/M No. 22/25 in MD-PD&PS-F01-075-01A-003-P067 MARINE DEPARTMENT NOTICE NO.130/2025 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Withdrawal of Scientific Buoy “KYC-B” to the East of Sunshine Island NOTICE IS HEREBY GIVEN that withdrawal of scientific buoy will take place to the east of Sunshine Island with effect from 9 July 2025. The particulars of the buoy are as follows: Name : KYC-B Position (WGS 84 Datum) : 22-15.90N 114-03.84E Shape : Pillar Colour : Yellow Light Characteristics : Fl(5) Y.20s Top Mark : Yellow “X” Radar Reflector : Fitted 2. A drawing showing the position of the buoy is attached to this Notice. Ms. Lydia LAM Director of Marine (Acting) Marine Department Government of the HKSAR Date: 4 July 2025 Action File Ref.: L/M No. 22/25 in MD-PD&PS-F01-075-01A-003-P067 MARINE DEPARTMENT NOTICE NO. 122/2025 (Marine Works) Construction Works for Landing Steps at Sham Shui Kok With immediate effect and for a period of approximately 17 months, construction works for landing steps will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (E) and the adjacent shoreline: (A) 22-19.18N 113-59.81E (B) 22-19.19N 113-59.79E (C) 22-19.23N 113-59.83E (D) 22-19.21N 113-59.86E (E) 22-19.19N 113-59.85E 2. The works will be carried out by one derrick lighter. One crane boat and one tugboat will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 25 metres around the derrick lighter will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the working vessels. 4. A silt curtain which is a large piece of netting to contain mud and sediments extending from the sea surface to the seabed will be established within the works area. Yellow flashing lights will be laid to mark the extent of the silt curtain. 5. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 6. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind that there are divers working in the area. 7. A drawing showing the works area is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 16 June 2025 Action File Ref.: L/M No. 15/25 in MD-PD&PS-F01-075-01A-003-P066 MARINE DEPARTMENT NOTICE NO. 117/2025 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Withdrawal of Scientific Buoy “A02” in Central Waters NOTICE IS HEREBY GIVEN that withdrawal of scientific buoy will take place in Central Waters with effect from 16 June 2025. The particulars of the buoy are as follows: Name : A02 Position (WGS 84 Datum) : 22-15.40N 114-03.63E Shape : Pillar Colour : Yellow Light Characteristics : Fl(5) Y.20s Top Mark : Yellow “X” Radar Reflector : Fitted Automatic Identification System : Fitted 2. A drawing showing the position of the buoy is attached to this Notice. Ms. Lydia LAM Director of Marine (Ag.) Marine Department Government of the HKSAR Date: 12 June 2025 Action File Ref.: L/M No. 18/25 in MD-PD&PS-F01-075-01A-003-P066 MARINE DEPARTMENT NOTICE NO. 112/2025 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment of Aids to Navigation at the breakwater of Lei Yue Mun Public Landing Facility NOTICE IS HEREBY GIVEN that one light beacon has been established at the breakwater of Lei Yue Mun Public Landing Facility. The particulars of the light beacon are as follows: Position (WGS 84 Datum) Character Colour Elevation (metres) (A) 22-17.24N 114-14.25E F.R. Red 5.3 2. A drawing showing the position of the light beacon is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 6 June 2025 Action File Ref.: L/M No. 20/25 in MD-PD&PS-F01-075-01A-001A-P079 MARINE DEPARTMENT NOTICE NO. 60/2025 (Navigational Warnings and Related Information) Typhoon Season Owners, agents and charterers are requested to remind their ship masters of the need to take precautionary measures during the approach of tropical cyclones. 2. Masters and persons in control of vessels should closely monitor the development of tropical cyclones for making early preparation. This includes carrying out thorough inspections on board to ensure that the engines, mooring gears and other safety equipment of vessels are in good working conditions. When safe and practicable, consideration should be given to arrange vessels to leave the berth in ample time and proceed outside Hong Kong waters for shelter from extreme weather associated with super typhoons. 3. Masters, owners, agents and persons in control of vessels are also reminded of their obligation to comply with any direction issued by the Director of Marine concerning the safe operation of vessels and the port, or in relation to any matter which the Director may give directions under the laws of Hong Kong. 4. When a tropical cyclone warning is issued by the Hong Kong Observatory, every vessel which is moored to the following government mooring buoys shall clear anchors and cables and prepares the main propulsion machinery to full power condition. Such vessel shall, if so directed by the Director, leave the mooring buoy- “A” mooring “B” mooring A17, A36, A43 B03, B04 A74, A77 Other details of government mooring buoys are available on the Marine Department’s website. (https://www.mardep.gov.hk/en/public-services/port-services/moor/index.html) 5. The master of a ship moored to a government mooring buoy may, at his discretion, drop a bow anchor under foot to lessen the tendency to sheer. This should not impair the efficiency of the mooring, although an anchor should not be used during normal weather conditions. 6. Masters are reminded that every vessel within the waters of Hong Kong must maintain continuous listening watch on the VHF radio channel appropriate to the VHF sector in which the vessel is located, or another VHF channel as may be specified by the Vessel Traffic Centre (call sign “MARDEP”). The Centre will broadcast tropical cyclone information from time to time when tropical cyclone warning signals have been issued. Masters should also listen to local radio broadcasts for weather advisory information bulletins. 7. An inadequately manned vessel during the passage of a tropical cyclone not only places itself at risk but also endangers the port and other vessels. Masters, owners, agents, and charterers of vessels should therefore ensure that sufficient number of qualified crew capable of carrying out all duties to ensure the safety of ship having regard to the pertaining circumstances are on board at all times during the passage of a tropical cyclone. Further information on minimum safe manning levels on ships while in the waters of Hong Kong can be found in Marine Department’s website. (https://www.mardep.gov.hk/en/public-services/port-services/proc/index.html) 8. Coxswains, owners, agents and persons in control of local vessels are advised to take the precautionary measures contained in the Marine Department pamphlet entitled “Measures to Enhance the Safety of Local Vessels During Passage of Tropical Cyclones” well before a tropical cyclone is approaching Hong Kong. The pamphlet is available on the Marine Department’s website. (https://www.mardep.gov.hk/en/publication/materials/pdf/hps_cyclones.pdf) 9. This Notice supersedes Marine Department Notice No. 71 of 2024. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 21 March 2025 File Ref.: L/M No. 13/2025 in MD-VTC-F01-045-03A-001-P001 MARINE DEPARTMENT NOTICE NO. 59/2025 (Marine Works) Submarine Outfall Construction Works at Po Toi O With immediate effect and for a period of approximately 21 months, submarine outfall construction works will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (L) and the adjacent shoreline: (A) 22-16.62N 114-17.81E (B) 22-16.62N 114-17.81E (C) 22-16.62N 114-17.82E (D) 22-16.82N 114-17.82E (E) 22-16.82N 114-17.81E (F) 22-16.84N 114-17.81E (G) 22-16.84N 114-17.83E (H) 22-16.82N 114-17.83E (I) 22-16.82N 114-17.82E (J) 22-16.63N 114-17.82E (K) 22-16.63N 114-17.82E (L) 22-16.63N 114-17.83E 2. The works will be carried out by three dumb lighters and one hopper barge. Two tugs will provide assistance. The number of vessels engaged in the works will change from time to time to suit operational requirements. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 30 metres around each lighter and the barge will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the lighters and the barge. 4. A silt curtain which is a large piece of netting to contain mud and sediments extending from the sea surface to the seabed will be established within the works area. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtain. 5. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work. 6. Diving operations will be carried out from time to time during the hours of work. Vessels navigating in the vicinity should proceed with caution and keep clear of the works area at slow speed, bearing in mind there are divers working in the area. 7. A drawing showing the works area is attached to this Notice. This Notice is an extension of Marine Department Notice No. 147/2023. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 21 March 2025 Action File Ref.: L/M No. 36/23 in MD-PD&PS-F01-075-01A-001A-P052 MARINE DEPARTMENT NOTICE NO. 29/2025 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Adjustment of Passage Areas in New Yau Ma Tei Typhoon Shelter NOTICE IS HEREBY GIVEN that the passage areas within the limits of New Yau Ma Tei Typhoon Shelter will be adjusted with effect from 24 February 2025. 2. Pursuant to Section 3 of the Merchant Shipping (Local Vessels) (Typhoon Shelters) Regulation (Cap. 548E), the Director of Marine has set aside the areas shown in grey colour in the plan number 2024MAR005 dated 24 February 2025 as the passage areas in New Yau Ma Tei Typhoon Shelter. The plan is available for inspection in the office of the Marine Department on request. It can also be inspected on the Department’s website. [https://www.mardep.gov.hk/en/pub_services/ocean/lpf_tshelter.html] 3. The Annex showing the adjusted passage areas in New Yau Ma Tei Typhoon Shelter together with a table listing the co-ordinates (WGS 84 Datum) of the numbered positions shown in the drawing is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 12 February 2025 Action File Ref.: L/M No. 3/25 in MD-PD&PS-F01-075-01A-002-P022 MARINE DEPARTMENT NOTICE NO. 17/2025 (Marine Works) Marine Works in Shing Mun River Channel, Sha Tin With immediate effect and for a period of approximately 24 months, marine works involving marine site investigation and marine bore pile works will be carried out within the following works areas: Works Area 1: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shorelines: 114° 11.198’E 114° 11.225’E 114° 11.196’E (A) 22° 22.610’N (B) 22° 22.574’N (C) 22° 22.562’N (D) 22-22.60N 114-11.18E Works Area 2: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (E) to (H) and the adjacent shoreline: (E) 22-22.66N 114-10.77E (F) 22-22.66N 114-10.76E (G) 22-22.70N 114-10.73E (H) 22-22.70N 114-10.74E 2. The works will be carried out on temporary working platforms erected across the river channel. Yellow flashing lights will be installed at the four corners of each working platform to indicate its position. 3. Silt curtains which are large pieces of netting to contain mud and sediments extending from the sea surface to the seabed will be established within the works areas. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the extent of the silt curtains. 4. The hours of work will be from 0700 to 1900 hours. No works will be carried out on Sundays and public holidays. 5. Vessels navigating in the vicinity should proceed with caution. 6. A drawing showing the works areas is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 27 January 2025 Action File Ref.: L/M. No.02/25 in MD-PD&PS-F01-075-01A-001A-P073 MARINE DEPARTMENT NOTICE NO. 243/2024 (Marine Works) We are one in Promoting Excellence in Marine Services MARINE DEPARTMENT NOTICE NO. 243/2024 (Marine Works) Dredging Operations in Kwai Tsing Container Basin With immediate effect and for a period of approximately 24 months, dredging operations will be carried out in the following works areas: Works Area 1: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (H): (A) 22-20.63N 114-07.26E (B) 22-20.25N 114-07.38E (C) 22-20.26N 114-07.41E (D) 22-20.16N 114-07.45E (E) 22-20.15N 114-07.42E (F) 22-19.59N 114-07.61E (G) 22-19.56N 114-07.50E (H) 22-20.59N 114-07.15E Works Area 2: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (I) to (L): (I) 22-20.55N 114-06.98E (J) 22-19.82N 114-07.23E (K) 22-19.79N 114-07.12E (L) 22-20.51N 114-06.87E 2. The works will be carried out by one grab dredger and one derrick lighter. Two tugboats and one hopper barge will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations. 3. A working area of approximately 50 metres around the dredger and lighter will be established. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the dredger and lighter. 4. A silt curtain will be established beside the dredger and lighter. The silt curtain is a large piece of netting used to contain mud and sediments. Yellow flashing lights will be laid to mark the extent of the silt curtain. 5. The hours of work will be round-the-clock. Vessels navigating in the vicinity should proceed with caution. 6. A drawing showing the works areas is attached to this Notice. Ms. Lydia LAM Director of Marine (Ag.) Marine Department Government of the HKSAR Date: 19 December 2024 Action File Ref.: L/M. No. 19/24 in MD-PD&PS-F01-075-01A-002-P021 MARINE DEPARTMENT NOTICE NO. 198/2024 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Withdrawal and Establishment of Weather Buoys at the Hong Kong International Airport Approach Area NOTICE IS HEREBY GIVEN that withdrawal and establishment of weather buoys will take place at the Hong Kong International Airport Approach Area with effect from 29 October 2024. Withdrawal of the weather buoy “Weather 5” 2. The weather buoy “Weather 5” at the following position (WGS 84 Datum) will be withdrawn: 22-17.65N 113-52.14E Establishment of the weather buoy “Weather 4” 3. The weather buoy “Weather 4” with details as follows will be established: Name : Weather 4 Position (WGS 84 Datum) : 22-19.62N 113-56.92E Shape : Pillar Colour : Yellow Light Characteristics : Fl. Y 6s Radar Reflector : Fitted 4. A drawing showing the positions of the weather buoys is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 24 October 2024 Action File Ref.: L/M No. 30/24 in MD-PD&PS-F01-075-01A-003-P059 MARINE DEPARTMENT NOTICE NO. 150/2024 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment of Scientific Buoy “EPD-2” to the North of Lantau Island With immediate effect, a scientific buoy will be established to the North of Lantau Island for collecting data. The particulars of the buoy are as follows: Name : EPD-2 Position (WGS 84 Datum) : 22-20.37N 114-00.15E Shape : Pillar Colour : Yellow Light Characteristics : Fl(5) Y.20s Top Mark : Yellow “X” Radar Reflector : Fitted Automatic Identification System : Fitted 2. Vessels navigating in the vicinity should proceed with caution and give a wide berth to the buoy. 3. A drawing showing the position of the buoy is attached to this Notice. This Notice supersedes Marine Department Notice No.164/2022. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 19 August 2024 Action File Ref.: L/M No. 28/22 in MD-PD&PS-F01-075-01A-003-P034 MARINE DEPARTMENT NOTICE NO. 129/2024 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Withdrawal of Three Yellow Marker Buoys and Establishment of an East Cardinal Mark Buoy at Stanley Bay NOTICE IS HEREBY GIVEN that withdrawal of three yellow marker buoys and establishment of an east cardinal mark buoy will take place at Stanley Bay with effect from 1 August 2024. Withdrawal of three yellow marker buoys 2. The three yellow marker buoys “ST1”, “ST2” and “ST3” at the following positions (WGS 84 Datum) will be withdrawn: (A) 22-12.99N 114-12.59E (B) 22-12.99N 114-12.61E (C) 22-13.00N 114-12.61E Establishment of the east cardinal mark buoy “ST-E” 3. The east cardinal mark buoy “ST-E” with details as follows will be established: Name : ST-E Position (D) (WGS 84 Datum) : 22-12.99N 114-12.61E Type : East cardinal mark Shape : Pillar Colour : Black with a single broad horizontal yellow band Light Characteristics : Q(3) 10s Colour of Light : White Top mark : Two black cones, one above the other, base to base Radar Reflector : Build-in Material : Polyethylene 4. Drawings showing the positions of the light buoys are attached to Plan I and Plan II of this Notice respectively. 5. This Notice supersedes Marine Department Notice No.110/2021. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 12 July 2024 Action File Ref.: L/M. No. 14/2024 in MD-ANMU-F01-045-03A-001-P001 MARINE DEPARTMENT NOTICE NO. 98/2024 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment of Two Scientific Buoys in Central Waters With effect from 13 June 2024, two scientific buoys will be established in Central Waters for collecting data. The particulars of the buoys are as follows: (1) Name : A01 Position (WGS 84 Datum) : 22-17.25N 114-04.88E Shape : Pillar Colour : Yellow Light Characteristics : Fl(5) Y.20s Top Mark : Yellow “X” Radar Reflector : Fitted Automatic Identification System : Fitted (2) Name : A02 Position (WGS 84 Datum) : 22-15.40N 114-03.63E Shape : Pillar Colour : Yellow Light Characteristics : Fl(5) Y.20s Top Mark : Yellow “X” Radar Reflector : Fitted Automatic Identification System : Fitted 2. Vessels navigating in the vicinity should proceed with caution and give a wide berth to the buoys. 3. A drawing showing the positions of the buoys is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 31 May 2024 Action File Ref.: L/M No. 15/24 in MD-PD&PS-F01-075-01A-003-P056 MARINE DEPARTMENT NOTICE NO. 92/2024 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment of Buoys Demarcating the South Lantau Marine Park With effect from 19 June 2024, two marker buoys will be established to demarcate the South Lantau Marine Park (SLMP). 2. The details and characteristics of the marker buoys are as follows: Name (in English) (in Chinese) Co-ordinate : : : SMP-E 南嶼-E 22-09.06N 113-54.81E Shape : Pillar Colour : Yellow Light : Fl (3) Y. 12s Top Mark : NIL Radar Reflector : Fitted Name (in English) (in Chinese) Co-ordinate : : : SMP-F 南嶼-F 22-10.05N 113-53.51E Shape : Pillar Colour : Yellow Light : Fl (2) Y. 12s Top Mark : NIL Radar Reflector : Fitted 3. A drawing showing the SLMP and the positions of the marker buoys is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 28 May 2024 Action File Ref.: L/M No. 23/22 in PD&PS-F01-075-01A-003-P032 MARINE DEPARTMENT NOTICE NO. 71/2024 (Navigational Warnings and Related Information) Typhoon Season Owners, agents and charterers are requested to remind their ship masters of the need to take precautionary measures during the approach of tropical cyclones. 2. Masters and persons in control of vessels should closely monitor the development of tropical cyclones for making early preparation. This includes carrying out thorough inspections on board to ensure that the engines, mooring gears and other safety equipment of vessels are in good working conditions. When safe and practicable, consideration should be given to arrange vessels to leave the berth in ample time and proceed outside Hong Kong waters for shelter from extreme weather associated with super typhoons. 3. Masters, owners, agents and persons in control of vessels are also reminded of their obligation to comply with any direction issued by the Director of Marine concerning the safe operation of vessels and the port, or in relation to any matter which the Director may give directions under the laws of Hong Kong. 4. When a tropical cyclone warning is issued by the Hong Kong Observatory, every vessel which is moored to the following government mooring buoys shall clear anchors and cables and prepares the main propulsion machinery to full power condition. Such vessel shall, if so directed by the Director, leave the mooring buoy- “A” mooring “B” mooring A17, A36, A73 B03, B30 A74, A77, A78 Other details of government mooring buoys are available on the Marine Department’s website. (https://www.mardep.gov.hk/en/public-services/port-services/moor/index.html) 5. The master of a ship moored to a government mooring buoy may, at his discretion, drop a bow anchor under foot to lessen the tendency to sheer. This should not impair the efficiency of the mooring, although an anchor should not be used during normal weather conditions. 6. Masters are reminded that every vessel within the waters of Hong Kong must maintain continuous listening watch on the VHF radio channel appropriate to the VHF sector in which the vessel is located, or another VHF channel as may be specified by the Vessel Traffic Centre (call sign “MARDEP”). The Centre will broadcast tropical cyclone information from time to time when tropical cyclone warning signals have been issued. Masters should also listen to local radio broadcasts for weather advisory information bulletins. 7. An inadequately manned vessel during the passage of a tropical cyclone not only places itself at risk but also endangers the port and other vessels. Masters, owners, agents, and charterers of vessels should therefore ensure that sufficient number of qualified crew capable of carrying out all duties to ensure the safety of ship having regard to the pertaining circumstances are on board at all times during the passage of a tropical cyclone. Further information on minimum safe manning levels on ships while in the waters of Hong Kong can be found in Marine Department’s website. (https://www.mardep.gov.hk/en/public-services/port-services/proc/index.html) 8. Coxswains, owners, agents and persons in control of local vessels are advised to take the precautionary measures contained in the Marine Department pamphlet entitled “Measures to Enhance the Safety of Local Vessels During Passage of Tropical Cyclones” well before a tropical cyclone is approaching Hong Kong. The pamphlet is available on the Marine Department’s website. (https://www.mardep.gov.hk/en/publication/materials/pdf/hps_cyclones.pdf) 9. This Notice supersedes Marine Department Notice No. 77 of 2023. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 18 April 2024 File Ref.: L/M No. 8/2024 in MD-VTC-F01-045-03A-001-P001 MARINE DEPARTMENT NOTICE NO. 47/2024 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment of Scientific Buoy “EPD-4” in Southeast Lamma Waters With effect from 22 March 2024, a scientific buoy will be established in Southeast Lamma Waters for collecting data. The particulars of the buoy are as follows: Name : EPD-4 Position (WGS 84 Datum) : 22-11.50N 114-09.62E Shape : Pillar Colour : Yellow Light Characteristics : Fl(5) Y.20s Top Mark : Yellow “X” Radar Reflector : Fitted Automatic Identification System : Fitted 2. Vessels navigating in the vicinity should proceed with caution and give a wide berth to the buoy. 3. A drawing showing the position of the buoy is attached to this Notice. Mr. S.F. WONG Director of Marine Marine Department Government of the HKSAR Date: 13 March 2024 Action File Ref.: L/M No. 16/24 in MD-PD&PS-F01-075-01A-001A-P061 MARINE DEPARTMENT NOTICE NO. 207/2023 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment of a weather buoy at the Hong Kong International Airport Approach Area NOTICE IS HEREBY GIVEN that a weather buoy will be established at the Hong Kong International Airport Approach Area with effect from 20 December 2023. 2. Details of the weather buoy are set out below : Name : Weather 12 Position (WGS 84 Datum) Shape Colour : : : 22° 20.198’N Pillar Yellow 113° 55.723’E Light Characteristics Radar Reflector : : Fl. Y 4s Fitted 3. A drawing showing the position of the weather buoy is attached to this Notice. Ms Carol Yuen Director of Marine Marine Department Government of the HKSAR Date: 8 December 2023 Action File Ref.: L/M No. 42/23 in MD-PD&PS-F01-075-01A-003-P052 MARINE DEPARTMENT NOTICE NO. 206/2023 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment of Fish Culture Zones at Wong Chuk Kok Hoi and Mirs Bay NOTICE IS HEREBY GIVEN that Fish Culture Zones will be established at Wong Chuk Kok Hoi and Mirs Bay with effect from 13 December 2023. The position of the Fish Culture Zones are as follows: Wong Chuk Kok Hoi Fish Culture Zone : The Fish Culture Zone is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D): Latitude Longitude (A) 22-30.64N 114-19.36E (B) 22-30.41N 114-19.43E (C) 22-30.30N 114-18.99E (D) 22-30.54N 114-18.93E Mirs Bay Fish Culture Zone : The Fish Culture Zone is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (E) to (H) and (I) to (L): Latitude Longitude (E) 22-28.66N 114-22.65E (F) 22-28.36N 114-23.15E (G) 22-27.90N 114-22.84E (H) 22-28.20N 114-22.34E (I) 22-27.27N 114-22.25E (J) 22-27.27N 114-23.46E (K) 22-26.48N 114-23.46E (L) 22-26.48N 114-22.24E 2. Vessels navigating in the vicinity should proceed with caution. 3. Two drawings showing the positions of the Fish Culture Zones are attached to this Notice. Ms Carol Yuen Director of Marine Marine Department Government of the HKSAR Date: 7 December 2023 Action File Ref.: L/M No. 45/23 in MD-PD&PS-F01-075-01A-001A-P055 MARINE DEPARTMENT NOTICE NO. 163/2023 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Withdrawal and Establishment of Weather Buoys at the Hong Kong International Airport Approach Area NOTICE IS HEREBY GIVEN that withdrawal and establishment of weather buoys will take place at the Hong Kong International Airport Approach Area with effect from 4 October 2023. Withdrawal of the weather buoy “Weather 4” 2. The weather buoy “Weather 4” at the following position (WGS 84 Datum) will be withdrawn: 22-19.62N 113-56.92E Establishment of the weather buoy “Weather 13” 3. The weather buoy “Weather 13” with details as follows will be established: Name : Weather 13 Position (WGS 84 Datum) : 22-19.01N 113-52.06E Shape : Pillar Colour : Yellow Light Characteristics : Fl. Y 4s Radar Reflector : Fitted 4. Drawings showing the positions of the weather buoys are attached to Plan I and Plan II of this Notice respectively. Ms Carol Yuen Director of Marine Marine Department Government of the HKSAR Date: 27 September 2023 Action File Ref.: L/M. No. 32/23 in MD-PD&PS-F01-075-01A-003-P050 MARINE DEPARTMENT NOTICE NO. 135/2023 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment of Scientific Buoy “EPD-3” off North Point With effect from 25 August 2023, a scientific buoy will be established off North Point for collecting data. The particulars of the buoy are as follows: Name : EPD-3 Position (WGS 84 Datum) : 22-17.65N 114-11.61E Shape : Pillar Colour : Yellow Light Characteristics : Fl(5) Y.20s Top Mark : Yellow “X” Radar Reflector : Fitted Automatic Identification System : Fitted 2. Vessels navigating in the vicinity should proceed with caution and give a wide berth to the buoy. 3. A drawing showing the position of the buoy is attached to this Notice. Ms Carol Yuen Director of Marine Marine Department Government of the HKSAR Date: 16 August 2023 Action File Ref.: L/M No. 35/23 in MD-PD&PS-F01-075-01A-001A-P051 MARINE DEPARTMENT NOTICE NO. 131/2023 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment of Scientific Buoy “EPD-1” off Tsuen Wan With effect from 16 August 2023, a scientific buoy will be established off Tsuen Wan Park for collecting data. The particulars of the buoy are as follows: Name : EPD-1 Position (WGS 84 Datum) : 22-21.94N 114-06.65E Shape : Pillar Colour : Yellow Light Characteristics : Fl(5) Y.20s Top Mark : Yellow “X” Radar Reflector : Fitted Automatic Identification System : Fitted 2. Vessels navigating in the vicinity should proceed with caution and give a wide berth to the buoy. 3. A drawing showing the position of the buoy is attached to this Notice. Ms Carol Yuen Director of Marine Marine Department Government of the HKSAR Date: 8 August 2023 Action File Ref.: L/M No. 10/23 in MD-PD&PS-F01-075-01A-002-P012 MARINE DEPARTMENT NOTICE NO. 125/2023 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment of Concrete Pontoon Floating Barriers at Hei Ling Chau Typhoon Shelter NOTICE IS HEREBY GIVEN that three concrete pontoon floating barriers have been established to attenuate the local wind-generated wave at Hei Ling Chau Typhoon Shelter. The positions of the established concrete pontoon floating barriers and the particulars of the lights are as follows: Floating barrier 1: Along the north-south direction with approximately 4 metres in width and 100 metres in length within the following coordinates (WGS 84 Datum) from (A) to (D): Latitude Longitude (A) 22-14.93N 114-01.82E (B) 22-14.89N 114-01.85E (C) 22-14.89N 114-01.85E (D) 22-14.93N 114-01.82E The particulars of the lights for Floating barrier 1 are as follows: Latitude Longitude Characteristics (i) 22-14.93N 114-01.82E FL yellow 5s (ii) 22-14.89N 114-01.85E FL yellow 5s Floating barrier 2: Along the east-west direction with approximately 5 metres in width and 300 metres in length within the following coordinates (WGS 84 Datum) from (E) to (H): Latitude Longitude (E) 22-14.92N 114-02.03E (F) 22-14.91N 114-02.03E (G) 22-14.82N 114-01.89E (H) 22-14.82N 114-01.89E - 2 – The particulars of the lights for Floating barrier 2 are as follows: Latitude Longitude Characteristics (iii) 22-14.82N 114-01.89E FL yellow 5s (iv) 22-14.85N 114-01.94E FL yellow 5s (v) 22-14.88N 114-01.98E FL yellow 5s (vi) 22-14.92N 114-02.03E FL yellow 5s Floating barrier 3: Along the east-west direction with approximately 5 metres in width and 300 metres in length within the following coordinates (WGS 84 Datum) from (I) to (L): Latitude Longitude (I) 22-14.85N 114-02.08E (J) 22-14.85N 114-02.09E (K) 22-14.75N 114-01.95E (L) 22-14.75N 114-01.94E The particulars of the lights for Floating barrier 3 are as follows: Latitude Longitude Characteristics (vii) 22-14.75N 114-01.95E FL yellow 5s (viii) 22-14.78N 114-01.99E FL yellow 5s (ix) 22-14.81N 114-02.04E FL yellow 5s (x) 22-14.85N 114-02.08E FL yellow 5s 2. Vessels navigating in the vicinity should proceed with caution and give a wide berth to the concrete pontoon floating barriers. 3. A drawing showing the positions of the floating barriers and the lights is attached to this Notice. Ms Carol Yuen Director of Marine Marine Department Government of the HKSAR Date: 21 July 2023 Action File Ref.: L/M No. 29/23 in MD-PD&PS-F01-075-01A-001A-P049 MARINE DEPARTMENT NOTICE NO. 124/2023 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment of Six Lateral Mark Buoys at Tseung Kwan O Sheltered Anchorage NOTICE IS HEREBY GIVEN that six lateral mark buoys will be established at Tseung Kwan O Sheltered Anchorage with effect from 15 August 2023. The details and particulars of the buoys are as follows: (1) Name : TKO 1 Type : Lateral Mark Position (WGS 84 Datum) : 22-18.28N 114-15.94E Shape : Conical Colour : Green (2) Name : TKO 2 Type : Lateral Mark Position (WGS 84 Datum) : 22-18.29N 114-15.93E Shape : Can Colour : Red (3) Name : TKO 3 Type : Lateral Mark Position (WGS 84 Datum) : 22-18.34N 114-15.95E Shape : Conical Colour : Green (4) Name : TKO 4 Type : Lateral Mark Position (WGS 84 Datum) : 22-18.34N 114-15.94E Shape : Can Colour : Red (5) Name : TKO 5 Type : Lateral Mark Position (WGS 84 Datum) : 22-18.43N 114-15.91E Shape : Conical Colour : Green (6) Name : TKO 6 Type : Lateral Mark Position (WGS 84 Datum) : 22-18.43N 114-15.90E Shape : Can Colour : Red 2. Coxswains and persons-in-charge of vessels are reminded to strictly comply with Rule 9 (Narrow Channels) of the International Regulations for Preventing Collisions at Sea, 1972 when navigating within the buoyed channel. 3. A drawing showing the positions of the buoys is attached to this Notice. Ms Carol Yuen Director of Marine Marine Department Government of the HKSAR Date: 21 July 2023 Action File Ref.: L/M No. 26/23 in MD-PD&PS-F01-075-01A-001A-P048 MARINE DEPARTMENT NOTICE NO. 102/2023 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Designating Different Berthing Areas for Different Classes of Vessels in Aberdeen West Typhoon Shelter (Pilot Scheme) NOTICE IS HEREBY GIVEN that a pilot scheme for designating different berthing areas for different classes of vessels within the Aberdeen West Typhoon Shelter will be implemented with effect from 30 June 2023. 2. Under the pilot scheme, part of the berthing area at the entrance of the typhoon shelter to the southwest of Aberdeen Fisheries and Marine Offices (referred to as “Area A”) and the berthing area to the west of Tai Wong Kung Temple, Ap Lei Chau (referred to as “Area C”) will be designated for berthing by Class III local vessels exclusively; while part of the berthing area to the southeast of Aberdeen Fisheries and Marine Offices (referred to as “Area B”) will be designated for berthing by Class I, II and III vessels. Area A: This area is bounded by straight lines joining the following coordinates (WGS 84 Datum) from (A) to (D):- (A) 22-14.82N 114-08.90E (B) 22-14.80N 114-08.90E (C) 22-14.76N 114-08.76E (D) 22-14.80N 114-08.74E Area B: This area is bounded by straight lines joining the following coordinates (WGS 84 Datum) from (E) to (J):- (E) 22-14.86N 114-09.00E (F) 22-14.85N 114-09.02E (G) 22-14.82N 114-09.01E (H) 22-14.82N 114-09.00E (I) 22-14.80N 114-08.92E (J) 22-14.85N 114-08.93E Area C: This area is bounded by straight lines joining the following coordinates (WGS 84 Datum) from (K) to (N):- (K) 22-14.78N 114-08.90E (L) 22-14.76N 114-08.90E (M) 22-14.72N 114-08.84E (N) 22-14.74N 114-08.76E 3. Areas A, B, and C are all existing berthing areas, and their locations in the Aberdeen West Typhoon Shelter are indicated in the Annex attached to this Notice. Ms Carol Yuen Director of Marine Marine Department Government of the HKSAR Date: 19 June 2023 Action File Ref.: L/M 20/23 in MD-PD&PS-F01-075-01A-001A-P046 MARINE DEPARTMENT NOTICE NO. 94/2023 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Adjustment of Passage Areas in Aberdeen South Typhoon Shelter NOTICE IS HEREBY GIVEN that the passage areas within the limits of Aberdeen South Typhoon Shelter will be adjusted with effect from 5 June 2023. 2. Pursuant to Section 3 of the Merchant Shipping (Local Vessels) (Typhoon Shelters) Regulation (Cap. 548E), the Director of Marine has set aside the areas shown in grey colour in the plan number 2022MAR033 dated 5 June 2023 as the passage areas in Aberdeen South Typhoon Shelter. The plan is available for inspection in the office of the Marine Department on request. It can also be inspected on the Department’s website. [https://www.mardep.gov.hk/en/pub_services/ocean/lpf_tshelter.html] 3. The Annex showing the adjusted passage areas in Aberdeen South Typhoon Shelter together with a table listing the co-ordinates (WGS 84 Datum) of the numbered positions shown in the drawing is attached to this Notice. Ms Carol Yuen Director of Marine Marine Department Government of the HKSAR Date: 1 June 2023 Action File Ref.: L/M No. 64/22 in MD-PD&PS-F01-075-01A-001A-P040 MARINE DEPARTMENT NOTICE NO. 82/2023 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment of Aids to Navigation on the Hong Kong Offshore Liquified Natural Gas Terminal to the East of Soko Islands NOTICE IS HEREBY GIVEN that a racon, two lights and two foghorns have been established on the Hong Kong Offshore Liquified Natural Gas Terminal. The particulars of the racon, lights and foghorns are as follows: Position (WGS 84 Datum) Aids to Navigation Characteristics Elevation (metres) (A) 22-09.33N 113-57.79E Racon Morse code “U” 48.0 (B) 22-09.39N 113-57.77E Light Foghorn White Morse code “U” every 15 seconds Morse code “U” every 30 seconds 19.2 17.2 (C) 22-09.19N 113-57.83E Light Foghorn White Morse code “U” every 15 seconds Morse code “U” every 30 seconds 19.2 17.2 2. A drawing showing the positions of the racon, lights and foghorns is attached to this Notice. This Notice should be read in conjunction with Marine Department Notice No. 192/2022. Ms Carol Yuen Director of Marine Marine Department Government of the HKSAR Date: 10 May 2023 Action File Ref.: L/M No. 12/23 in MD-PD&PS-F01-075-01A-003-P047 MARINE DEPARTMENT NOTICE NO. 75/2023 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment of Fairways, Anchorage and Pilot Boarding Station in the Southwestern Waters of Hong Kong Owners, operators, masters, coxswains and persons-in-charge of vessels are advised that establishment of three principal fairways, one anchorage and one pilot boarding station in the southwestern waters of Hong Kong will come into effect on 5 May 2023. 2. The boundaries of the three new principal fairways, namely the West Lamma Fairway, the South Shek Kwu Chau Fairway and the Soko Fairway are specified in items (1) to (3) of Appendix respectively. The boundaries of the new anchorage, namely the South Cheung Chau Anchorage is specified in item (4) of Appendix. The location of the new pilot boarding station is specified in item (5) of Appendix. A drawing showing the new principal fairways, the new anchorage and the new pilot boarding station is attached to Plan I of this notice. 3. Arising from the establishment of new principal fairways, the Recommended Traffic Separation Scheme (TSS) in the waters south of Cheung Chau will be repealed. A drawing showing the Recommended TSS is attached to Plan II of this notice. Two safe water marks were withdrawn and three cardinal marks were established on 31 March 2023. The details of the withdrawal and establishment of light buoys were promulgated in MDN No. 51/2023. 4. Masters, coxswains and persons-in-charge of vessels are reminded to strictly comply with Rule 9 (Narrow Channels) of the International Regulations for Preventing Collisions at Sea, 1972 when navigating within the boundaries of all principal fairways in the waters of Hong Kong. 5. Vessels navigating in the vicinity of the South Cheung Chau Anchorage, the South Shek Kwu Chau Fairway and the Hong Kong Offshore Liquified Natural Gas (LNG) Terminal (the Terminal) should also pay attention to the establishment of the Safety Zone (SZ) and Marine Control Zone (MCZ) for the Terminal to the east of Soko Islands with effect from 1 October 2022. The details of the SZ and MCZ of the Terminal were promulgated in MDN No. 192/2022. Vessels not attending the Terminal should proceed with caution and keep clear of the SZ and MCZ of the Terminal. 6. Information on the establishment of the new principal fairways, new anchorage and new pilot boarding station is also available at the Marine Department website: https://www.mardep.gov.hk/en/publication/materials/publicity_material.html 7. This Notice should be read in conjunction with Marine Department Notices No. 192/2022 and No. 51/2023. Ms Carol Yuen Director of Marine Marine Department Government of the HKSAR Date: 4 May 2023 Action File Ref.: L/M No. 14/23 in MD-PD&PS-F01-075-01A-003-P047 Appendix (1) Boundaries of the West Lamma Fairway (a) On the east, a straight line joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22° 15.590´N 114° 05.401´E (A) (ii) 22° 10.424´N 114° 03.122´E (B) (b) On the west, a straight line joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22° 15.825´N 114° 04.997´E (C) (ii) 22° 11.063´N 114° 02.896´E (D) (c) On the north, a straight line joining the extremities of the eastern and western boundaries. (d) On the south, a straight line joining the extremities of the eastern and western boundaries. (2) Boundaries of the South Shek Kwu Chau Fairway (a) On the north, a straight line joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22° 11.063´N 114° 02.896´E (D) (ii) 22° 11.058´N 113° 57.708´E (E) (b) On the south, a straight line joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22° 10.424´N 114° 03.122´E (B) (ii) 22° 10.424´N 113° 58.001´E (F) (c) On the east, a straight line joining the extremities of the northern and southern boundaries. (d) On the west, a straight line joining the extremities of the northern and southern boundaries. (3) Boundaries of the Soko Fairway (a) On the north, a straight line joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22° 11.058´N 113° 57.708´E (E) (ii) 22° 11.825´N 113° 55.797´E (G) (b) On the south, a straight line joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22° 10.424´N 113° 58.001´E (F) (ii) 22° 11.308´N 113° 55.797´E (H) (c) On the east, a straight line joining the extremities of the northern and southern boundaries. (d) On the west, a straight line joining the extremities of the northern and southern boundaries. (4) Boundaries of the South Cheung Chau Anchorage The area of the waters of Hong Kong bounded by straight lines joining the following positions (WGS 84 Datum):- Latitude Longitude Position (i) 22° 10.060´N 114° 02.325´E (I) (ii) 22° 10.060´N 114° 03.819´E (J) (iii) 22° 09.291´N 114° 03.819´E (K) (iv) 22° 09.291´N 114° 02.325´E (L) (5) Location of the pilot boarding station A new pilot boarding station will be established to the South of Cheung Chau Island. The location is within the area of 0.7 nautical mile radius centred by the following position (WGS 84 Datum):- Latitude Longitude Position 22° 09.663´N 114° 03.055´E (M) MARINE DEPARTMENT NOTICE NO. 51/2023 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Withdrawal and Establishment of Light Buoys to the South of Cheung Chau and Shek Kwu Chau NOTICE IS HEREBY GIVEN that withdrawal and establishment of light buoys will take place to the south of Cheung Chau and Shek Kwu Chau with effect from 31 March 2023. Withdrawal of two safe water marks 2. The two safe water marks “Cheung Chau” and “Shek Kwu Chau” at the following positions (WGS 84 Datum) will be withdrawn: (A) 22 11.741’N 114 03.380’E (B) 22 10.758’N 113 59.547’E Establishment of three cardinal marks 3. The three new cardinal marks with details as follows will be established: Name : Cheung Chau Position (C) (WGS 84 Datum) : 22 11.063’N 114 02.896’E Type : South cardinal mark Shape : Pillar Colour : Yellow above black Light Characteristics : Q(6) + LF1. 15s Top Mark : Two black cones one above the other, points downward Radar Reflector : Fitted Name : Shek Kwu Chau SE Position (D) (WGS 84 Datum) : 22 10.060’N 114 02.325’E Type : North cardinal mark Shape : Pillar Colour : Black above yellow Light Characteristics : Q Top Mark : Two black cones one above the other, points upward Radar Reflector : Fitted Name : Shek Kwu Chau SW Position (E) (WGS 84 Datum) : 22 10.357’N 113 58.144’E Type : North cardinal mark Shape : Pillar Colour : Black above yellow Light Characteristics : Q Top Mark : Two black cones one above the other, points upward Radar Reflector : Fitted 4. A drawing showing the positions of the light buoys is attached to this Notice. Ms Carol Yuen Director of Marine Marine Department Government of the HKSAR Date: 22 March 2023 Action File Ref.: L/M No. 9/23 in MD-PD&PS-F01-075-01A-003-P046 MARINE DEPARTMENT NOTICE NO. 33/2023 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment of Scientific Buoy “PWWHK” near Wong Fa Pai, West of Lantau Island With effect from 6 March 2023, a scientific buoy will be established near Wong Fa Pai, West of Lantau Island for collecting wave data. The particulars of the buoy are as follows: Name : PWWHK Position (WGS 84 Datum) : 22-14.21N 113-50.02E Shape : Pillar Colour : Yellow Light Characteristics : Fl(5) Y.20s Top Mark : Yellow “X” Radar Reflector : Fitted Automatic Identification System : Fitted 2. Vessels navigating in the vicinity should proceed with caution and give a wide berth to the buoy. 3. A drawing showing the position of the buoy is attached to this Notice. Ms Carol Yuen Director of Marine Marine Department Government of the HKSAR Date: 24 February 2023 Action File Ref.: L/M No. 3/23 in MD-PD&PS-F01-075-01A-003-P044 MARINE DEPARTMENT NOTICE NO. 18/2023 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Adjustment of Passage Areas in Four Typhoon Shelters NOTICE IS HEREBY GIVEN that the passage areas within the limits of Tuen Mun Typhoon Shelter, Kwun Tong Typhoon Shelter, Hei Ling Chau Typhoon Shelter and Shau Kei Wan Typhoon Shelter will be adjusted with effect from 31 January 2023. 2. Pursuant to Section 3 of the Merchant Shipping (Local Vessels)(Typhoon Shelters) Regulation (Cap. 548E), the Director of Marine has set aside the area shown in grey colour in the plans numbered 2022MAR012, 2022MAR013, 2022MAR014 and 2022MAR015 dated 31 January 2023 as the passage areas in Tuen Mun Typhoon Shelter, Kwun Tong Typhoon Shelter, Hei Ling Chau Typhoon Shelter and Shau Kei Wan Typhoon Shelter respectively. The plans are available for inspection in the office of the Marine Department on request. They can also be inspected on the Department’s website. [https://www.mardep.gov.hk/en/pub_services/ocean/lpf_tshelter.html] 3. Annexes A to D showing the adjusted passage areas in Tuen Mun Typhoon Shelter, Kwun Tong Typhoon Shelter, Hei Ling Chau Typhoon Shelter and Shau Kei Wan Typhoon Shelter together with Tables 1 to 4 listing the co- ordinates (WGS 84 Datum) of the numbered positions shown in the drawings are attached to this Notice. Ms Carol Yuen Director of Marine Marine Department Government of the HKSAR Date: 31 January 2023 Action File Ref.: L/M No. 64/22 in MD-PD&PS-F01-075-01A-001A-P040 MARINE DEPARTMENT NOTICE NO. 246/2022 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment of Ten Yellow Marker Buoys Demarcating the Steep Seabed at Plover Cove NOTICE IS HEREBY GIVEN that 10 marker buoys have been established to demarcate the steep seabed at Plover Cove at the following co- ordinates (WGS 84 Datum) from (A) to (J): (A) 22-27.68N 114-12.53E (B) 22-27.68N 114-12.56E (C) 22-27.65N 114-12.57E (D) 22-27.61N 114-12.58E (E) 22-27.60N 114-12.59E (F) 22-27.60N 114-12.62E (G) 22-27.59N 114-12.59E (H) 22-27.61N 114-12.55E (I) 22-27.63N 114-12.54E (J) 22-27.66N 114-12.53E 2. The 10 marker buoys have been laid at the co-ordinates (A) to (J). Each marker buoy had been fitted with a yellow flashing light. The details and characteristics of the marker buoys are as follows: Type : Marker Shape : Cone Colour : Yellow Light Characteristics : F1 (30) Y. 60s Colour of light : Yellow Words marked (in English) Words marked (in Chinese) : STEEP SEABED : 陡峭海床 3. Vessels navigating in the vicinity should proceed with caution and give a wide berth to the buoys. 4. A drawing showing the positions of the marker buoys is attached to this Notice. Ms Carol Yuen Director of Marine Marine Department Government of the HKSAR Date: 1 December 2022 Action File Ref.: L/M. No.36/22 in MD-PD&PS-F01-075-01A-001A-P030 MARINE DEPARTMENT NOTICE No. 237/2022 (Navigational Warning & Related Information) Clearances of Tseung Kwan O Interchange and Tseung Kwan O Cross Bay Bridge NOTICE IS HEREBY GIVEN that Tseung Kwan O Interchange (TKOI) and the connected Tseung Kwan O Cross Bay Bridge (TKOCBB) have been constructed over the waters of Tseung Kwan O. 2. Owners, masters, coxswains and persons-in-charge of vessels should ensure that the highest point of their vessels does not exceed the clearances when passing underneath or navigating in the vicinity of TKOI and TKOCBB as set out in paragraphs 3 and 4 below. 3. The areas in the immediate vicinity of TKOI where the owners, masters, coxswains and persons-in-charge of vessels should navigate with extreme caution are shown by straight lines joining the following co- ordinates (WSG 84) from (A) to (M): (A) 22-17.82N 114-15.21E (B) 22-17.79N 114-15.26E (C) 22-17.79N 114-15.29E (D) 22-17.83N 114-15.31E (E) 22-17.83N 114-15.37E (F) 22-17.73N 114-15.43E (G) 22-17.71N 114-15.47E (H) 22-17.66N 114-15.44E (I) 22-17.68N 114-15.39E (J) 22-17.75N 114-15.23E (K) 22-17.78N 114-15.20E (L) 22-17.72N 114-15.41E (M) 22-17.71N 114-15.40E 4. The areas in the immediate vicinity of TKOCBB where the owners, masters, coxswains and persons-in-charge of vessels should navigate with extreme caution are shown by straight lines joining the following co- ordinates (WSG 84) from (N) to (Z): (N) 22-17.71N 114-15.47E (O) 22-17.65N 114-15.62E (P) 22-17.60N 114-15.73E (Q) 22-17.57N 114-15.82E (R) 22-17.55N 114-15.94E (S) 22-17.55N 114-16.00E (T) 22-17.51N 114-16.00E (U) 22-17.50N 114-16.00E (V) 22-17.50N 114-15.94E (W) 22-17.52N 114-15.80E (X) 22-17.55N 114-15.71E (Y) 22-17.60N 114-15.60E (Z) 22-17.66N 114-15.44E 5. Drawings indicating the layout of TKOI and TKOCBB and the various clearances for viaducts of TKOI and TKOCBB are attached to this Notice as Annexes A, B and C respectively. Ms Carol Yuen Director of Marine Marine Department Government of the HKSAR Date: 16 November 2022 Action File Ref.: L/M No. 63/22 in MD-PD&PS-F01-075-01A-001A-P039 MARINE DEPARTMENT NOTICE NO. 217/2022 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Temporary Changes to Two Lateral Mark Buoys at Tap Mun NOTICE IS HEREBY GIVEN that with effect from 8 November 2022 and until further notice, the lateral mark buoys at Tap Mun will be equipped with lights. The details and particulars of the buoys are as follows: (1) Name : TMP 1 Type : Lateral Mark Position (WGS 84 Datum) : 22-28.20N 114-21.43E Shape : Conical Colour : Green Light Characteristics : Fl. G 5s Colour of light : Green (2) Name : TMP 2 Type : Lateral Mark Position (WGS 84 Datum) : 22-28.24N 114-21.42E Shape : Can Colour : Red Light Characteristics : Fl. R 5s Colour of light : Red 2. A drawing showing the position of the buoys is attached to this Notice. Ms Carol Yuen Director of Marine Marine Department Government of the HKSAR Date: 20 October 2022 Action File Ref.: L/M. No. 03/2022 in MD-ANMU-F01-015-02C-P001 MARINE DEPARTMENT NOTICE NO. 192/2022 (Navigational Warnings & Related Information) Establishment of Safety Zone and Marine Control Zone for the Hong Kong Offshore Liquified Natural Gas Terminal to the East of Soko Islands NOTICE IS HEREBY GIVEN that a Safety Zone (“SZ”) and a Marine Control Zone (“MCZ”) will be established to facilitate the operations of the Hong Kong Offshore Liquified Natural Gas (“LNG”) Terminal (“the Terminal”) to the east of Soko Islands, starting from 1 October 2022. 2. Details of the SZ and MCZ are as follows: (i) Safety Zone The SZ will be formed by a circle of radius 250 metres with the centre at position (W) (WGS 84 Datum) Latitude 22° 09.289'N, Longitude 113° 57.799'E. (ii) Marine Control Zone The MCZ will be formed by an oval area of 500 metres extending from the Terminal annulus with arcs and straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (R): Latitude Longitude (A) 22-09.66N 113-57.71E (B) 22-09.66N 113-57.86E (C) 22-09.59N 113-57.99E (D) 22-09.47N 113-58.06E (E) 22-09.26N 113-58.12E (F) 22-09.12N 113-58.12E (G) 22-09.00N 113-58.05E (H) 22-08.93N 113-57.92E (I) 22-08.92N 113-57.89E (J) 22-08.91N 113-57.85E (K) 22-08.91N 113-57.78E (L) 22-08.95N 113-57.67E (M) 22-09.02N 113-57.58E (N) 22-09.11N 113-57.53E (O) 22-09.32N 113-57.47E (P) 22-09.46N 113-57.47E (Q) 22-09.58N 113-57.55E (R) 22-09.65N 113-57.68E The Terminal annulus is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (S) to (V): (S) 22-09.40N 113-57.78E (T) 22-09.19N 113-57.84E (U) 22-09.18N 113-57.81E (V) 22-09.39N 113-57.75E 3. No vessels other than those attending the Terminal which are authorised by the Operator of the Terminal, shall enter into any part of the SZ and MCZ. 4. The Terminal Operator and its standby vessels will monitor the SZ and MCZ at all times to prevent unauthorised vessels from entering these zones. 5. Vessels navigating in the vicinity should proceed with caution and keep clear of the SZ and MCZ at slow speed, bearing in mind there are LNG operations in the area. 6. A drawing showing the SZ and MCZ is attached to this Notice. Ms Carol Yuen Director of Marine Marine Department Government of the HKSAR Date: 16 September 2022 Action File Ref.: L/M. No. 27/22 in MD-PD&PS-F01-075-01A-007-P002 MARINE DEPARTMENT NOTICE NO. 168 /2021 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment of Scientific Buoy “ ESC” to the North of the Hong Kong International Airport NOTICE IS HEREBY GIVEN that a scientific buoy has been established to the North of the Hong Kong International Airport for collecting data. The particulars of the buoy are as follows: Name : ESC Position (WGS 84 Datum) : 22-20.50N 113-55.92E Shape : Pillar Colour : Yellow Light Characteristics : Fl(5) Y.20s Top Mark : Yellow “X” Radar Reflector : Fitted Automatic Identification System : Fitted 2. Vessels navigating in the vicinity should proceed with caution and give a wide berth to the buoy. 3. A drawing showing the position of the buoy is attached to this Notice. 4. This Notice should be read in conjunction with Marine Department Notice No. 76/2021. Ms Carol Yuen Director of Marine Marine Department Government of the HKSAR Date: 8 October 2021 Action File Ref.: L/M No. 24/21 in MD-PD&PS-F01-075-01A-003-P016 MARINE DEPARTMENT NOTICE NO. 24/2021 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment of Aids to Navigation on the Southern Landfall of Tuen Mun Chek Lap Kok Link Northern Connection NOTICE IS HEREBY GIVEN that one light beacon has been established on the Southern Landfall of Tuen Mun Chek Lap Kok Link Northern Connection. The particulars of the light beacon are as follows: Position (WGS 84 Datum) Character Colour Elevation (metres) (A) 22° 19.401’N Fl. 5s White 7.5 113° 57.678’E 2. A drawing showing the position of the light beacon is attached to this Notice. Agnes WONG Director of Marine Marine Department Government of the HKSAR Date: 28 January 2021 Action File Ref.: L/M No. 4/20 in MD-PD&PS-F01-075-01A-003-P007 MARINE DEPARTMENT NOTICE NO. 21/2021 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Reinstatement of Lateral Mark Buoys Inside Causeway Bay Typhoon Shelter NOTICE IS HEREBY GIVEN that seven lateral mark buoys have been reinstated in the following positions (WGS 84 Datum) G1, G3, G7, R2, R4, R6 and R8 inside Causeway Bay Typhoon Shelter for marking the passage area. Particulars of the buoys are as follows: Name Position Shape Colour G1 22-17.17N 114-11.25E Conical Green G3 22-17.12N 114-11.20E Conical Green G7 22-17.11N 114-11.04E Conical Green R2 22-17.15N 114-11.25E Can Red R4 22-17.11N 114-11.20E Can Red R6 22-17.08N 114-11.12E Can Red R8 22-17.10N 114-11.04E Can Red 2. A drawing showing the positions of the buoys is attached to this Notice. Agnes WONG Director of Marine Marine Department Government of the HKSAR Date: 21 January 2021 Action File Ref.: L/M. No. 1/21 in MD-PD&PS-F01-075-01A-001A-P005 MARINE DEPARTMENT NOTICE NO. 190/2020 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Re-arrangement of Passage Area in Causeway Bay Typhoon Shelter NOTICE IS HEREBY GIVEN that the passage area within the limits of Causeway Bay Typhoon Shelter will be re-arranged with effect from 29 December 2020 as all associated major works have completed. 2. Pursuant to Section 3 of the Merchant Shipping (Local Vessels) (Typhoon Shelters) Regulation (Cap.548E), the Director of Marine has set aside the area shown in grey colour in the plan numbered 2020MAR010 and dated 29 December 2020 as the passage area in Causeway Bay Typhoon Shelter. The plan is available for inspection on request to the Director of Marine and it can also be inspected on the Department’s website. [ https://www.mardep.gov.hk/en/pub_services/ocean/lpf_tshelter.html ] 3. A drawing showing the re-arranged passage area in Causeway Bay Typhoon Shelter together with a table listing the co-ordinates (WGS 84 Datum) of the numbered positions shown in the drawing are attached to this Notice. S. F. WONG Director of Marine (Ag.) Marine Department Government of the HKSAR Date: 29 December 2020 Action File Ref.: L/M. No. 20/20 in MD-PD&PS-F01-075-01A-001A-P002 MARINE DEPARTMENT NOTICE NO. 176/2020 (Establishment, Withdrawal and Changes of Aids to Navigation Fairways, Anchorages & Other Port Facilities) Establishment of Aids to Navigation on the Tuen Mun Chek Lap Kok Link Southern Viaduct NOTICE IS HEREBY GIVEN that ten lights have been established on the Tuen Mun Chek Lap Kok Link Southern Viaduct. The particulars of the lights are as follows: Position (WGS 84 Datum) Character Colour Elevation (metres) (A) 22° 18.635’N Fixed Red 4.9 113° 57.580’E (B) 22° 18.609’N Continuous Green 32.4 113° 57.589’E Quick (C) 22° 18.585’N Isophase White 32.1 113° 57.609’E 4 seconds (D) 22° 18.564’N Continuous Red 31.6 113° 57.634’E Quick (E) 22° 18.554’N Fixed Red 4.9 113° 57.654’E Position (WGS 84 Datum) Character Colour Elevation (metres) (F) 22° 18.585’N Fixed Red 5.0 113° 57.527’E (G) 22° 18.574’N Continuous Green 29.6 113° 57.553’E Quick (H) 22° 18.559’N Isophase White 30.8 113° 57.581’E 4 seconds (I) 22° 18.543’N Continuous Red 31.5 113° 57.610’E Quick (J) 22° 18.531’N Fixed Red 4.9 113° 57.629’E 2. A drawing showing the position of the lights is attached. Agnes WONG Director of Marine Marine Department Government of the HKSAR Date: 4 December 2020 Action File Ref.: L/M No. 2/20 in MD-PD&PS-F01-075-01A-003-P009 MARINE DEPARTMENT NOTICE NO. 175/2020 (Establishment, Withdrawal and Changes of Aids to Navigation Fairways, Anchorages & Other Port Facilities) Establishment of Aids to Navigation on the Northern Landfall of Tuen Mun Chek Lap Kok Link Northern Connection NOTICE IS HEREBY GIVEN that one light beacon has been established on the Northern Landfall of Tuen Mun Chek Lap Kok Link Northern Connection. The particulars of the light beacon are as follows: Position (WGS 84 Datum) Character Colour Elevation (metres) (A) 22° 21.386’N Fl. 5s White 6.8 113° 57.189’E 2. A drawing showing the position of the light beacon is attached to this Notice. Agnes WONG Director of Marine Marine Department Government of the HKSAR Date: 3 December 2020 Action File Ref.: L/M No.1/20 in MD-PD&PS-F01-075-01A-003-P004 MARINE DEPARTMENT NOTICE NO. 47/2020 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment of Buoys Demarcating the Southwest Lantau Marine Park With effect from 30 March 2020, three marker buoys will be established to demarcate the Southwest Lantau Marine Park (SWLMP). To be designated on 1 April 2020, the SWLMP is the hatched area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (H), and from (I) to (M) and the adjacent shorelines: (A) 22-14.11N 113-50.30E (B) 22-13.03N 113-50.31E (C) 22-13.02N 113-50.31E (D) 22-11.80N 113-50.69E (E) 22-12.09N 113-50.11E (F) 22-13.03N 113-49.90E (G) 22-14.00N 113-49.68E (H) 22-14.11N 113-49.73E (I) 22-13.15N 113-52.97E (J) 22-12.23N 113-53.00E (K) 22-12.02N 113-53.00E (L) 22-11.76N 113-51.34E (M) 22-11.81N 113-50.86E 2. The three marker buoys will be laid at the co-ordinates (A), (G) and (J). Each marker buoy will be fitted with a radar reflector and a yellow flashing light. The marker buoy at the co-ordinate (J) will also be fitted with AIS. The details and characteristics of the marker buoys are as follows: Name (in English) (in Chinese) Co-ordinate (A) : : : SWLMP-C 嶼西南-C 22º 14.107’ N 113º 50.305’ E Shape : Pillar Colour : Yellow Light : Fl (4) Y. 12s Top Mark : NIL Radar Reflector : Fitted Name (in English) (in Chinese) Co-ordinate (G) : : : SWLMP-B 嶼西南-B 22º 13.996’ N 113º 49.683’ E Shape : Pillar Colour : Yellow Light : Fl (2) Y. 12s Top Mark : NIL Radar Reflector : Fitted Name (in English) (in Chinese) Co-ordinate (J) : : : SWLMP-A 嶼西南-A 22º 12.234’ N 113º 53.002’ E Shape : Pillar Colour : Yellow Light : Fl (3) Y. 12s Top Mark : NIL Radar Reflector AIS : : Fitted Fitted 3. A drawing showing the SWLMP and the positions of the marker buoys is attached to this Notice. Agnes WONG Director of Marine Marine Department Government of the HKSAR Date: 20 March 2020 Action File Ref.: L/M No. 21/20 in PA/S 492/51/7 MARINE DEPARTMENT NOTICE NO. 197/2019 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Restoration of Government Mooring Buoy “A35” off Causeway Bay Typhoon Shelter NOTICE IS HEREBY GIVEN that with effect from 20 December 2019, Government Mooring Buoy “A35” will be restored at the following position (WGS 84 Datum): 22-17.39N 114-10.98E 2. A drawing showing the charted position of the buoy “A35” is attached to this Notice. 3. Marine Department Notice No. 57/2016 is hereby cancelled. Agnes WONG Director of Marine Marine Department Government of the HKSAR Date: 18 December 2019 File Ref.: L/M No.84/16 in PA/S 909/2/38/5

Latest warnings in force

  • MDN 219/2026

    MARINE DEPARTMENT NOTICE NO. 219/2026 (Establishment, Withdrawal and Changes of Aids to Navigation, Fairways, Anchorages & Other Port Facilities) Establishment, Repeal and Changes of Anchorages, Traffic Separation Schemes (TSSs) and Other Port Facilities Owners, operators, masters, coxswains and persons-in-charge of vessels are advised that the following changes to anchorages, traffic separation schemes and other port facilities in Hong Kong waters will come into effect on 27 November 2026. 2. S

  • MDN 214/2026

    MARINE DEPARTMENT NOTICE NO. 214/2026 (Navigation Warnings & Related Information) Cross Harbour Swimming Races and Closure of Landing Steps NOTICE IS HEREBY GIVEN that swimming races across the Central Harbour from Wan Chai, Hong Kong Island to Tsim Sha Tsui, Kowloon will take place from 0700 hours to 1100 hours on 15 November 2026. About 4,000 swimmers, under the escort of guard boats, are expected to participate in the races. 2. Launches of the Marine Department and Marine Police will be stati

  • MDN 209/2026

    MARINE DEPARTMENT NOTICE NO. 209/2026 (Navigation Warnings & Related Information) Establishment of a Restricted Area off the New Hung Hom Harbourfront NOTICE IS HEREBY GIVEN that a Restricted Area will be established on 10 November 2026 (rehearsal), 12 and 14 November 2026 (event days), from 1700 hours to 2359 hours, in Victoria Harbour off the New Hung Hom Harbourfront to facilitate a drone performance. 2. The Restricted Area is bounded by straight lines joining the following co-ordinates (WGS

  • MDN 211/2026

    MARINE DEPARTMENT NOTICE NO. 211/2026 (Navigation Warnings & Related Information) Establishment of a Restricted Area and Closure of Landing Steps off the Wan Chai Basin NOTICE IS HEREBY GIVEN that a Restricted Area will be established on 15 November 2026, from 1700 hours to 2200 hours, at the waters off Wan Chai Basin to facilitate a drone performance. 2. The Restricted Area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (E) and the adjacent shoreline:

  • MDN 207/2026

    MARINE DEPARTMENT NOTICE NO. 207/2026 (Marine Works) Submarine Outfall Inspection Works off Sai Kung With immediate effect and for a period of approximately three months, submarine outfall inspection works will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D): (A) 22-22.27N 114-16.61E (B) 22-22.23N 114-16.66E (C) 22-22.22N 114-16.65E (D) 22-22.26N 114-16.60E 2. The works will be carried out by one work boat. One guard boat

  • MDN 206/2026

    MARINE DEPARTMENT NOTICE NO. 206/2026 (Marine Works) Submarine Outfall Inspection Works off Ma Liu Shui With immediate effect and for a period of approximately two months, submarine outfall inspection works will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D): (A) 22-25.05N 114-13.12E (B) 22-25.02N 114-13.18E (C) 22-25.01N 114-13.17E (D) 22-25.04N 114-13.12E 2. The works will be carried out by one work boat. One guard boa

  • MDN 197/2026

    MARINE DEPARTMENT NOTICE NO. 197/2026 (Navigation Warnings & Related Information) Establishment of a Restricted Area off the New Hung Hom Harbourfront NOTICE IS HEREBY GIVEN that a Restricted Area will be established on 6, 7, 13, 14, 20, 21, 27 and 28 November 2026, from 1700 hours to 2200 hours, in Victoria Harbour off the New Hung Hom Harbourfront to facilitate a drone performance. 2. The Restricted Area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to

  • MDN 196/2026

    MARINE DEPARTMENT NOTICE NO. 196/2026 (Navigation Warnings & Related Information) Establishment of a Restricted Area off the Hung Hom Promenade NOTICE IS HEREBY GIVEN that a Restricted Area will be established on 6, 13, 20, 27 November 2026 (rehearsal) and 7, 14, 21, 28 November 2026 (event dates), from 2000 hours to 2230 hours, in Victoria Harbour off Hung Hom Promenade to facilitate a drone performance 2. The Restricted Area is bounded by straight lines joining the following co-ordinates (WGS

  • MDN 192/2026

    MARINE DEPARTMENT NOTICE NO. 192/2026 (Marine Works) Valve Installation and Pipe Connection Works in Yau Tong Sewage Pumping Station With immediate effect and for a period of approximately eight months, valve installation and pipe connection works will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-17.64N 114-14.00E (B) 22-17.63N 114-13.96E (C) 22-17.67N 114-13.95E (D) 22-17.68N 114-13.

  • MDN 191/2026

    MARINE DEPARTMENT NOTICE NO. 191/2026 (Marine Works) Temporary Establishment of Acoustic Monitors for Marine Mammal Survey at Lamma Island With immediate effect and for a period of approximately 14 months, acoustic monitors will be temporarily established at the following locations (WGS 84 Datum): (A) 22-13.29N 114-08.15E (B) 22-12.59N 114-07.82E (C) 22-10.85N 114-08.91E 2. The acoustic monitors will be laid at the co-ordinates from (A) to (C). The acoustic monitor is an instrument for collectin

  • MDN 190/2026

    MARINE DEPARTMENT NOTICE NO. 190/2026 (Marine Works) Submarine Outfall Inspection Works off Stonecutters Island and at Western Dangerous Goods Anchorage With immediate effect and for a period of approximately three months, submarine outfall inspection works will be carried out in the following works areas: Works Area 1: This area is bounded by straight lines joining the following coordinates (WGS 84 Datum) from (A) to (D): (A) 22-19.11N 114-07.57E (B) 22-19.09N 114-07.58E (C) 22-19.08N 114-07.56

  • MDN 188/2026

    MARINE DEPARTMENT NOTICE NO. 188/2026 (Marine Works) Improvement Works for the Construction of the North Waterfront Promenade at Mui Wo With immediate effect and for a period of approximately seven months, improvement works for the construction of the North Waterfront Promenade at Mui Wo will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (E) and the adjacent shoreline: (A) 22-15.96N 114-00.06E (B) 22-15.98N 114-00.07E (C) 2

  • MDN 180/2026

    MARINE DEPARTMENT NOTICE NO. 180/2026 (Marine Works) Marine Archaeological Survey to the South of Hong Kong-Zhuhai-Macao Bridge Hong Kong Port With immediate effect and for a period of approximately one month, marine archaeological survey will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D): (A) 22-18.72N 113-56.90E (B) 22-18.72N 113-56.94E (C) 22-18.70N 113-56.94E (D) 22-18.70N 113-56.90E 2. The survey will be carried ou

  • MDN 178/2026

    MARINE DEPARTMENT NOTICE NO. 178/2026 (Marine Works) Marine Site Investigation off Aberdeen South Typhoon Shelter With immediate effect and for a period of approximately 12 months, marine site investigation works involving sampling of subsea soil, drilling of boreholes and cone penetration tests will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (K) and the adjacent shoreline: (A) 22-13.96N 114-09.68E (B) 22-13.96N 114-09.7

  • MDN 177/2026

    MARINE DEPARTMENT NOTICE NO. 177/2026 (Marine Works) Marine Works at Nim Wan, Deep Bay With immediate effect and for a period of approximately nine months, marine works involving reclamation works and seawall construction will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (F) and the adjacent shorelines: (A) 22-25.41N 113-55.59E (B) 22-25.42N 113-55.59E (C) 22-25.47N 113-55.81E (D) 22-25.46N 113-55.81E (E) 22-25.34N 113-55.

  • MDN 168/2026

    MARINE DEPARTMENT NOTICE NO. 168/2026 (Marine Works) Marine Works at Tuen Mun River With immediate effect and for a period of approximately twelve months, marine works involving construction of temporary platforms and viaduct superstructures will be carried out in the following works areas: Works Area 1: This area is bounded by straight lines joining the following coordinates (WGS 84 Datum) from (A) to (K) and the adjacent shoreline: (A) 22-22.84N 113-58.09E (B) 22-22.82N 113-58.08E (C) 22-22.87

  • MDN 164/2026

    MARINE DEPARTMENT NOTICE NO. 164/2026 (Marine Works) Fender Piles Repair Works at the Castle Peak Power Station Jetty, Tap Shek Kok With immediate effect and for a period of approximately six months, fender piles repair works will be carried out in the following works areas: Works Area 1: This area is bounded by straight lines joining the following coordinates (WGS 84 Datum) from (A) to (C) and the adjacent shoreline: (A) 22-22.39N 113-54.99E (B) 22-22.23N 113-55.17E (C) 22-22.17N 113-55.14E Wor

  • MDN 159/2026

    MARINE DEPARTMENT NOTICE NO. 159/2026 (Marine Works) Marine Works of Three-Runway System at the Hong Kong International Airport With immediate effect and for a period of approximately four months, marine works involving seawall construction and barging operations will be carried out within the following works areas: Works Area 1: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (G) and the adjacent shoreline: (A) 22-19.83N 113-55.36E (B) 22-19.

  • MDN 157/2026

    MARINE DEPARTMENT NOTICE NO. 157/2026 (Navigation Warnings & Related Information) Establishment of a Restricted Area between Hong Kong International Airport and Hong Kong-Zhuhai-Macao Bridge Hong Kong Port With immediate effect and for a period of approximately three months, a Restricted Area will be established between Hong Kong International Airport and Hong Kong-Zhuhai-Macao Bridge Hong Kong Port to facilitate a yacht exhibition. 2. The Restricted Area is bounded by straight lines joining the

  • MDN 151/2026

    MARINE DEPARTMENT NOTICE NO. 151/2026 (Marine Works) Marine Works in Shing Mun River Channel, Sha Tin With immediate effect and for a period of approximately 16 months, marine works involving marine bore pile works will be carried out within the following works areas: Works Area 1: This area is bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shorelines: (A) 22-22.61N 114-11.20E (B) 22-22.57N 114-11.22E (C) 22-22.55N 114-11.17E (D) 22-2

  • MDN 152/2026

    MARINE DEPARTMENT NOTICE NO. 152/2026 (Marine Works) Coastal Enhancement Works at Heng Fa Chuen With immediate effect and for a period of approximately four months, coastal enhancement works will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-16.74N 114-14.45E (B) 22-16.75N 114-14.49E (C) 22-16.55N 114-14.54E (D) 22-16.55N 114-14.50E 2. The works will be carried out by one dump lighter.

  • MDN 150/2026

    MARINE DEPARTMENT NOTICE NO. 150/2026 (Marine Works) Repair Works for Seawall at Kennedy Town With immediate effect and for a period of approximately four months, repair works for seawall will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-17.02N 114-07.54E (B) 22-17.05N 114-07.54E (C) 22-17.05N 114-07.59E (D) 22-17.03N 114-07.59E 2. The works will be carried out by one dumb lighter. On

  • MDN 148/2026

    MARINE DEPARTMENT NOTICE NO. 148/2026 (Marine Works) Marine Site Investigation off Tap Shek Kok With immediate effect and for a period of approximately three months, marine site investigation works involving drilling of vibrocores will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (E): (A) 22-23.24N 113-54.54E (B) 22-23.16N 113-54.68E (C) 22-22.55N 113-54.86E (D) 22-22.44N 113-54.56E (E) 22-23.21N 113-54.31E 2. The works wi

  • MDN 141/2026

    MARINE DEPARTMENT NOTICE NO. 141/2026 (Marine Works) Desilting works between Cheung Chau Ferry Pier and Public Pier With immediate effect and for a period of approximately four months, desilting works will be carried out within the works area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-12.48N 114-01.70E (B) 22-12.48N 114-01.67E (C) 22-12.50N 114-01.67E (D) 22-12.51N 114-01.72E 2. The works will be carried out by o

  • MDN 138/2026

    MARINE DEPARTMENT NOTICE NO. 138/2026 (Marine Works) Establishment of Silt Curtain in Deep Water Bay With immediate effect and for a period of approximately 12 months, marine works involving the establishment of a silt curtain will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline: (A) 22-14.16N 114-11.42E (B) 22-14.16N 114-11.38E (C) 22-14.19N 114-11.35E (D) 22-14.19N 114-11.38E 2. Silt curtain i

Beta look