Singapore PMN 83/2026
SÉCURITÉanalysis
Activeuntil 21 Dec 2026, 23:59 UTC (in 29 days)Seabed repair works in Selat Pauh (area between Pulau Bukom, Pulau Sakeng and Sebarok)
Seabed repair works for the ASTER SBM pipeline are taking place in the Selat Pauh area between Pulau Bukom (south), Pulau Sakeng (Semakau) and Sebarok Island. Activity is conducted by pipelaying barge Sandpiper 1 with anchor handling tugs, supply barges and safety boats operating inside the defined work area. Works are continuous 24 hours daily from 21 Jun 2026 to 21 Dec 2026. Mariners should keep clear, maintain a lookout and a listening watch on VHF Channel 68 and contact West Control for assistance.
- Type
- Offshore operations · severity moderate
- Feed
- Offshore works, rigs and towingAll warnings of this kind on the map (contributors), or as an API feed: /api/v2/feeds/offshore/
- Location
- Selat Pauh sea area, between Pulau Bukom (southern part), Pulau Sakeng (Semakau) and Sebarok Island
- Validity
- From 21 Jun 2026, 00:00 UTC
Until 21 Dec 2026, 23:59 UTCWith effect from 21 Jun 2026 to 21 Dec 2026. - Activity periods
- 21 Jun 2026, 00:00 UTC - 21 Dec 2026, 23:59 UTC (24 hours daily)
- Hazards
- seabed repair works, anchoring and anchor handling, lifting/material transfer operations, increased vessel traffic within work area
Generated automatically from the warning text on 20 Oct 2026, 20:20 UTC. It can be wrong: the original warning below is the authoritative text.
The whole analysis comes with Lagom
This warning's analysis also has:
- Action for mariners
- Keep-clear distance
- Contacts
- Ships named
- Translations
- Nearby lights and rescue centres
The action for mariners, the keep-clear distance, contacts, ships named, translations and the nearby lights and rescue centres come with Lagom and every higher plan, and with the API plans. The official warning text above is always free.
Keywords
- Operationscable laying
- Geometry refsbounded, circle_radius, polygon
- Geometry phrasesarea bounded, bounded by, within