HomeMapWorld mapAlphaLearnNew
More
Account
Loading…
Language: English

Singapore PMN 81/2026

Received: Source checked:
Subscribe
Show on map
Search

analysis

Activeuntil 31 Dec 2026, 23:59 UTC (in 39 days)

Deployment of hydrographic equipment off Tuas View Extension

Hydrographic equipment will be deployed and anchored to the seabed off Tuas View Extension. Divers and work boats (with a safety boat) will operate daily. Activity is scheduled from 01 Jul 2026 to 31 Dec 2026, with working hours 0800-1800 daily. Mariners should keep well clear, maintain watch on VHF Ch 22 and navigate with caution.

Type
Survey operations · severity moderate
Feed
Survey operationsAll warnings of this kind on the map (contributors), or as an API feed: /api/v2/feeds/survey/
Location
Off Tuas View Extension
Validity
From 01 Jul 2026, 00:00 UTC
Until 31 Dec 2026, 23:59 UTCWith effect from 01 Jul 2026 to 31 Dec 2026.
Activity periods
  • 01 Jul 2026, 08:00 UTC - 31 Dec 2026, 18:00 UTC (Daily 0800-1800 (times given in message as local time; treated here as UTC))
Hazards
anchored hydrographic equipment, divers in water, work boats, safety boat
Cancels
Port Marine Notice No. 166 of 2025

Generated automatically from the warning text on 30 Sept 2026, 10:58 UTC. It can be wrong: the original warning below is the authoritative text.

The whole analysis comes with Lagom

This warning's analysis also has:

  • Action for mariners
  • Keep-clear distance
  • Contacts
  • Ships named
  • Translations
  • Nearby lights and rescue centres

The action for mariners, the keep-clear distance, contacts, ships named, translations and the nearby lights and rescue centres come with Lagom and every higher plan, and with the API plans. The official warning text above is always free.

Message content
MARITIME AND PORT AUTHORITY OF SINGAPORE PORT MARINE NOTICE NO. 81 OF 2026 09 Jun 2026 Shipping Community Harbour Craft Community Pleasure Craft Community DEPLOYMENT OF HYDROGRAPHIC EQUIPMENT AT TUAS VIEW EXTENSION Applicable to: Mariners operating in the vicinity of Tuas View Extension This PMN supersedes Port Marine Notice No. 166 of 2025. The working period has been extended, and the chartlet has been revised. Date : With effect from 01 Jul 2026 to 31 Dec 2026. Location : Off Tuas View Extension, at points indicated by the following co-ordinates (see attached chartlet): Working Area A (WGS 84 Datum) Point Latitude (N) Longitude (E) ADCP1C 01-13.25N 103-36.33E Working Hours Craft: : 0800 hours to 1800 hours daily, including Sundays and public holidays. Please refer to ANNEX A for the list of craft approved for deployment in the working area. These craft will exhibit the appropriate local and international day and night signals. Details : The deployment of hydrographic equipment will be carried out by divers deployed from the work boats. The hydrographic equipment will be anchored to the seabed using weights and angle bars. A safety boat will be deployed to warn other craft in the vicinity of the working area. Further enquiries relating to the project can be directed to Miss Aye Myat Mon (Emma), Project Manager at Tel: 9229 3764 Email: [email protected] Caution : When in the vicinity of the working area, mariners are reminded to: a) Keep well clear and not to enter the working area; b) Maintain a proper lookout; c) Proceed at a safe speed and navigate with caution; d) Maintain a listening watch on VHF Channel 22 (Jurong Control); and communicate with Jurong Control for assistance, if required. Please call Capt. Yeap Chee Kah at Tel: +65 6325 2462 or Marine Safety Control Centre (MSCC) Duty Officer at +65 6325 2488/2489 for clarification on this Port Marine Notice. CAPT CHONG JIA CHYUAN PORT MASTER MARITIME AND PORT AUTHORITY OF SINGAPORE
Beta look