Singapore PMN 50/2026
SÉCURITÉArchivedanalysis
No longer in forceStructural replacement works at Wharf 10, Pulau Bukom (Western Sector), 01 Jun-01 Nov 2026
Structural replacement of Breasting Dolphin 2 at existing Wharf 10, Pulau Bukom with pile driving, platform removal and reinstatement. Works include cutting piles 1.0 m above seabed, installation of five pairs of piles to 16 m penetration and diving operations as required. Activity 24 hours daily from 01 Jun 2026 to 01 Nov 2026 within a bounded working area; a safety boat will be on site. Mariners must keep well clear, maintain a listening watch on VHF Channel 68 and contact West Control for assistance.
- Type
- Offshore operations · severity moderate
- Feed
- Offshore works, rigs and towingAll warnings of this kind on the map (contributors), or as an API feed: /api/v2/feeds/offshore/
- Location
- Western Sector, vicinity of Wharf 10 at Pulau Bukom
- Validity
- From 01 Jun 2026, 00:00 UTC
Until 01 Nov 2026, 00:00 UTCWith effect from 01 Jun 2026 to 01 Nov 2026. - Activity periods
- 01 Jun 2026, 00:00 UTC - 01 Nov 2026, 00:00 UTC (24 hours daily)
- Hazards
- pile driving, underwater diving operations, removal and reinstatement of platform and walkway, construction works in working area, on-site safety boat
Generated automatically from the warning text on 30 Sept 2026, 11:18 UTC. It can be wrong: the original warning below is the authoritative text.
The whole analysis comes with Lagom
This warning's analysis also has:
- Action for mariners
- Keep-clear distance
- Contacts
- Ships named
- Translations
- Nearby lights and rescue centres
The action for mariners, the keep-clear distance, contacts, ships named, translations and the nearby lights and rescue centres come with Lagom and every higher plan, and with the API plans. The official warning text above is always free.
Keywords
- Operationsdiving operations
- Geometry refsbounded, circle_radius, polygon
- Geometry phrasesarea bounded, bounded by, within