HomeMapWorld mapAlphaLearnNew
More
Account
Loading…
Language: English

Singapore PMN 52/2026

SÉCURITÉArchived
Received: Archived: Source checked:
Subscribe
Show on map
Search

analysis

No longer in force

Construction of containment bunds at Tuas View Extension

Marine construction works to build submergible sand and intermediate bunds, stone revetment and associated survey and dumping at Tuas View Extension. Activity includes hopper barges, tugboats, crane/work/flat-top barges, jack-up barge, soil investigation, and managed dumping of EM/DM. Works are continuous 24 hours daily from 02 Apr 2026 to 01 Oct 2026. Mariners must keep clear, maintain lookout and VHF watch on Channel 22 (Jurong Control).

Type
Dredging / works · severity moderate
Feed
Offshore works, rigs and towingAll warnings of this kind on the map (contributors), or as an API feed: /api/v2/feeds/offshore/
Location
Tuas View Extension, east of Tuas View Extension and Temasek Fairway
Validity
From 02 Apr 2026, 00:00 UTC
Until 01 Oct 2026, 23:59 UTCWith effect from 02 Apr 2026 to 01 Oct 2026. Working Hours: 24 hours daily including Sundays and Public Holidays.
Activity periods
  • 02 Apr 2026, 00:00 UTC - 01 Oct 2026, 23:59 UTC (24 hours daily)
Hazards
marine construction works, submergible sand bund construction, submergible intermediate bund construction, submergible stone revetment installation, dumping of excavated/dredged material (EM/DM), survey operations (borehole and seismic), jack-up barge operations, tug and barge movements, safety boats and working craft
Cancels
PMN 21/2026

Generated automatically from the warning text on 30 Sept 2026, 11:17 UTC. It can be wrong: the original warning below is the authoritative text.

The whole analysis comes with Lagom

This warning's analysis also has:

  • Action for mariners
  • Contacts
  • Ships named
  • Translations
  • Nearby lights and rescue centres

The action for mariners, the keep-clear distance, contacts, ships named, translations and the nearby lights and rescue centres come with Lagom and every higher plan, and with the API plans. The official warning text above is always free.

Keywords

  • Operationsseismic survey, marine construction
  • Geometry refsbounded, circle_radius, lane, polygon
  • Geometry phrasesarea bounded, bounded by, fairway, within
Message content
MARITIME AND PORT AUTHORITY OF SINGAPORE PORT MARINE NOTICE NO. 52 OF 2026 02 Apr 2026 Shipping Community Harbour Craft Community Pleasure Craft Community CONSTRUCTION OF CONTAINMENT BUNDS AT TUAS VIEW EXTENSION Applicable to: Mariners operating in the vicinity east of Tuas View Extension and Temasek Fairway This PMN supersedes Port Marine Notice No. 21 of 2026. The working details and the craft list and chartlet have been revised. Date : With effect from 02 Apr 2026 to 01 Oct 2026. Location : At Tuas View Extension, within the working area bounded by the following co-ordinates (see attached chartlet): (WGS 84 Datum) Point Latitude (N) Longitude (E) 1 01-13.30N 103-38.48E 2 01°13.296 103°39.415’ 3 01-13.04N 103-39.51E 4 01-12.66N 103-38.68E 5 01-12.75N 103-38.64E 6 01-12.81N 103-38.72E Working Hours : 24 hours daily including Sundays and Public Holidays. Craft : Please refer to ANNEX A for the list of craft for deployment in the working area. These craft will exhibit the appropriate local and international day and night signals. Details : Construction of containment bund will involve a series of marine construction activities, including survey work, submergible sand bund construction, submergible intermediate bund construction, submergible stone revetment construction, management of dumping EM/DM (Excavated Material and Dredged Material) and marine soil investigation work such as borehole and seismic surveys. During the construction, sand will be transferred from the stockpile area using hopper barges and tugboats, which will then discharge at the sand bund site. The stone revetment will be installed using crane barge, work barge, and flat-top barge, while EM/DM materials will be dumped within the established containment bund by hopper barges. Soil investigation work will be conducted using a jack-up barge. Two tugboats will be deployed to assist the positioning of the jack- up barge. Safety boats will be deployed to warn other craft in the vicinity of the working area. Further enquiries relating to the project can be directed to: Mr. Yenuka De Silva, Assistant Construction Manager Tel: (65) 9299 8325, Email: [email protected] Caution : When in the vicinity of the working area, mariners are reminded to: a) Keep well clear and not to enter the working area; b) Maintain a proper lookout; c) Proceed at a safe speed and navigate with caution; d) Maintain a listening watch on VHF Channel 22 (Jurong Control); and e) Communicate with Jurong Control on VHF Channel 22 for assistance, as required. Please call Capt. Hazel Leo at Tel: +65 6325 2465 or Marine Safety Control Centre (MSCC) Duty Officer at +65 6325 2488/2489 for clarification on this Port Marine Notice. CAPT CHONG JIA CHYUAN PORT MASTER MARITIME AND PORT AUTHORITY OF SINGAPORE
Beta look