UMPQUA RIVER
General / Bridges
OREGON – UMPQUA RIVER – Bridge Notice ODOT will be replacing the dolphins and bumpers under the Umpqua River Bridge (BRDG UID 38617) on US101 at Reedsport, OR. Test drilling from a barge will occur at multiple locations. Navigation and the operations of the draw will not be impacted. The second phase is to replace the bumpers and dolphins with a hammer driven pile. The drilling will occur from October 15, 2026, through December 31, 2026. The removal and replacement of dolphins and bumbers will occur during 2027 with dates TBD.
Position 43-42.58N 124-06.05W
USCG Northwest District Local Notice to Mariners 45/2026