LNM11-A49E7B
SÉCURITÉReceived 28 Oct 2026, 00:00 UTC
Warning text
Positions open on the mapSAN FRANCISCO OAKLAND BAY BRIDGE WEST CROSSING - SAN FRANCISCO BAY NORTH CHANNEL
General / Marine Construction (Excluding Bridges) / Dredging
Pacific Dredge & Construction, pursuant to a permit with the U.S. Army Corps of Engineers, will conduct maintenance dredging in San Rafael Creek and the Across the Flats Channel, with mobilization beginning on or about October 26, 2026, and dredging expected to be completed on or about December 31, 2026. Dredging operations in Reaches 0, 1, and 2 will occur between approximately 37-57.38N 122-27.24W and 37-58.19N 122-29.60W and may be conducted 24 hours a day, 7 days a week, including holidays if needed. Operations in Reaches 3A and 3B will occur between approximately 37-58.19N 122-29.60W and 37-58.07N 122-30.67W and will be conducted from 0700 to 1900, Monday through Saturday. Equipment will include crane barge PDC180, dredge Horton, 300-cubic-yard scows Thing 1 and Thing 2, 2,000-cubic-yard scows DS21 and DS22, tugboats Pacific Patriot and Harbor Cadet, and work skiffs. All vessels will monitor VHF-FM channels 6 and 16. For more information, contact Raul Madera, Project Superintendent, at (619) 992-2894. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. All mariners are advised to transit the area with caution.
USCG Southwest District Local Notice to Mariners 44/2026