HomeMapSky mapAlpha
More
Account
Loading…
Language: English

LNM11-78BB47

PAN PAN
Received 23 Sept 2026, 00:00 UTC

Warning text

Positions open on the map
SAN JOAQUIN RIVER - STOCKTON CHANNEL General / Marine Construction (Excluding Bridges) / Dredging The Dutra Group and Camenzind Dredging, Inc., under contract with the City of Stockton, will conduct maintenance dredging within Buckley Cove, Stockton, California, including marina slips, fairways, and the boat-launch area, with placement at the Roberts Island Dredged Material Placement Site (DMPS), located across the San Joaquin River from Buckley Cove. Operations will use a 14-inch hydraulic cutter-suction dredge and floating/submerged pipeline. Work is expected to begin on or about October 1, 2026, and be completed on or before November 30, 2026. Operations will be conducted up to 12 hours per day, 6 days per week, Monday through Saturday. The dredging area is located at approximately 37-58.48N 121-22.86W, and the Roberts Island DMPS disposal area is located at approximately 37-58.47N 121-23.00W. Vessels involved include Dredge Paul Vincent, work boat Fester, additional work boats, an excavator barge, and skiffs. Vessels will monitor VHF-FM Channel 16 and operate on Channel 68. This work is authorized under Army Corps Permit No. 2024-00684. Floating/submerged pipeline will be marked with 30-inch diameter spherical yellow floats; anchors will be marked with 30-inch diameter spherical white buoys. Lighted “Danger” buoys with reflective tape and radar reflectors will be used where the dredge pipeline poses a navigational hazard. Mariners are advised to use extreme caution when transiting the area. For more information, contact CDI Project Manager Kurt Camenzind at (650) 424-0367 or (650) 444-8453, Dutra Project Superintendent Dennis Salyers at (415) 497-5289, or call (415) 218-6739. All mariners are advised to transit the area with caution. USCG Southwest District Local Notice to Mariners 45/2026

Keywordsmarine constructionDANGERnavigational hazard

Beta look