BODEGA BAY - BODEGA HARBOR
General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes
Alcatel Submarine Networks Marine will be conducting submarine telecommunications cable installation activities for Segment 5 of the ORCA Project from Manchester, California, to the offshore end of Segment 5 from October 3 to October 24, 2026. Operations will include shore-end cable landing, cable burial, surface cable laying, and ROV operations along the cable route, beginning at position 39-00.83N 123-42.40W and ending at position 37-23.23N 128-15.98W. The C/S Ile de Sein will be engaged in the operations and will maintain a continuous listening watch on VHF channel 16. The vessel may be restricted in its ability to maneuver during certain phases of the work. For more information, please contact the Master of C/S Ile de Sein at +47 23 67 48 00 or Luc Parkinson at +33 6 48 93 46 48. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.
USCG Southwest District Local Notice to Mariners 40/2026