APPROACHES TO SAN DIEGO BAY - SAN DIEGO BAY
General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes
Continental Maritime of San Diego (CMSD), LLC, in partnership with R.E. Staite Engineering, Inc., will be conducting the Pier 4 Replacement Project in San Diego Bay at the CMSD waterfront facility (1995 Bay Front St., San Diego, CA 92113) from July 16, 2026, through June 30, 2027. Operations will occur at position 32-41.60N 117-09.03W and will involve crane barges RES 180 and RES 150, Derrick Barge DB Palomar, floating barges RES 110 and YC Barge, RES Heavy Lift, small skiffs, tug boat Killeen, and push boat Mighty Sue C. All vessels will monitor radio channel 16. For more information, please contact Trevor Jones at 619-520-4240 or Ryan Albin at 619-772-8410. All mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.
USCG Southwest District Local Notice to Mariners 45/2026