Commencing November 2, 2026, and continuing until November 6, 2026, Amherst Madison Inc., will be installing two pipe piles for a floating dock, at Mile 252.1, RDB. Work will be conducted from 6:30 a.m. to 4:30 p.m., daily. The contractor’s floating plant will consist of the M/V FLORENCE T., and one barge mounted crane. During non-working hours, the floating plant will be moored at the work site and lighted according to regulations. M/V FLORENCE T., will be monitoring VHF-FM Channels 13 and 16. Mariners are urged to pass at the slowest safe speed to minimize wake and proceed with caution.
USCG Heartland (MRS) District Local Notice to Mariners 44/2026