BRETON/CHANDELEUR ICW ALTERNATE ROUTE - BAPTISTE COLLETTE BAYOU
General / Marine Construction (Excluding Bridges) / Dredging
Baptiste Collette Bayou - Staged Equipment --- --- Equipment and pipeline will be staged along the Baptiste Collette Bayou for the dredge project taking place between Miles 5.0 and 12.0. The staging area will be located between Miles 1.8 and 2.6 of Baptiste Collette Bayou and will be bound by approximate positions: 29-18.72N 089-19.24W, 29-18.68N 089-19.13W, 29-18.10N 089-19.47W and 29-18.14N 089-19.55W. Mariners are urged to transit the area with caution. VHF-FM Channels: 13, 16 and 67, POC: (337) 852-4066 or (224) 221-3753
Valid 2026-09-28 to 2026-12-03.
USCG Heartland (Gulf) District Local Notice to Mariners 45/2026