HomeMapSky mapAlpha
More
Account
Loading…
Language: English

LNM08G-5CB123

SÉCURITÉ
Received 28 Sept 2026, 00:00 UTCArchived 07 Oct 2026, 16:17 UTC

Warning text

Positions open on the map
SECTOR HOUSTON-GALVESTON, EXCLUSIVE ECONOMIC ZONE (EEZ) General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes Galveston Entrance Safety Fairway - Gulf of America - Dive Operation --- --- Dive and pipeline operations will take place along the southwestern edge of the Galveston Entrance Safety Fairway near platform High Island 179A. The dive vessel will have anchors deployed in the fairway, in approximate positions 29-11.22N 094-31.08W and 29-10.73N 094-30.81W. Operations will be conducted 24-hours a day, 7-days a week. The Lift Boat GALVESTON and the Anchor Vessel TRITON CRUSADER will be on-scene and limited in maneuverability. The anchors will be marked with orange Norwegian buoys. Mariners are urged to transit the area with caution and at their slowest safe speed to minimize wake after passing arrangements have been made. VHF-FM Channels: 13, 16 and 82, POC: (985) 303-6580 Valid 2026-09-28 to 2026-09-30. USCG Heartland (Gulf) District Local Notice to Mariners 39/2026

Keywordsmarine construction

Beta look