CAPE MAY INLET - CAPE MAY HARBOR
General / Marine Construction (Excluding Bridges) / Dredging
Location: 38-56.94N 074-53.40W Southern Maryland Dredging will conduct hydraulic maintenance dredging in the TRACEN Cape May boat basin. Dredged material will be pumped through approximately 4,400ft of 12-inch HDPE pipeline to Confined Disposal Facility #3 on the Training Center. The pipeline will be submerged within the basin and the remaining floating pipeline will be continuously marked with orange buoys. The dredge and pipeline will be marked and lit in accordance with the Navigation Rules. In addition to the dredge and pipeline, we will have an anchor barge and 4 work skiffs. Dredging will be from 7 am - 7 pm beginning 20 November until approximately 20 February, 2027. The dredge will be monitoring VHF-FM channels 13 and 16. Mariners are asked to transit at a slow, no wake speed and give the dredge a wide berth. MSI #58336.
Valid 2026-11-20 to 2027-02-24.
USCG East District Local Notice to Mariners 47/2026